| Bonds And Insurances, As Per Plan | ls | 3 | — | $3,748 | $2,500 – $15,000 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Erosion Control, As Per Plan | ls | 3 | — | $850.00 | $850.00 – $5,000 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Anchor Assembly, Mgs Type A | each | 3 | — | $3,300 | $150.00 – $3,300 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Construction Layout Stakes And Surveying | ls | 3 | — | $800.00 | $800.00 – $3,800 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Subgrade Compaction, As Per Plan | square yard | 3 | — | $21.00 | $1.75 – $21.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Aggregate Base | cubic yard | 3 | — | $115.00 | $65.00 – $170.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Mobilization | ls | 3 | — | $7,000 | $7,000 – $40,000 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Seeding And Mulching, Class 2 | square yard | 2 | — | $7.00 | $7.00 – $20.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Rock Channel Protection, Type D With Fabric Filter | cubic yard | 2 | — | $1,386 | $1,386 – $1,500 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Concrete misc.: 8 inch x 24 inch x 54 inch precast concrete lagging | each | 2 | — | $330.00 | $330.00 – $500.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Class Qc1 Concrete, Footing, As Per Plan | cubic yard | 2 | — | $840.00 | $500.00 – $840.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Porous Backfill With Geotextile Fabric, As Per Plan | cubic yard | 2 | — | $145.00 | $80.00 – $145.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| 6 Inch Non-Perforated Corrugated Plastic Pipe, Including Specials | linear foot | 2 | — | $22.00 | $10.00 – $22.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| 6 inch perforated corrugated plastic pipe | linear foot | 2 | — | $8.00 | $8.00 – $10.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Guardrail, Type Mgs | linear foot | 2 | — | $45.00 | $35.00 – $45.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Drilled Shafts, 30 Inch Diameter, Into Bedrock, As Per Plan | linear foot | 2 | — | $80.00 | $80.00 – $100.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Drilled Shafts, 30 Inch Diameter, Above Bedrock, As Per Plan | linear foot | 2 | — | $75.00 | $65.00 – $75.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Maintaining Traffic, As Per Plan | ls | 2 | — | $4,100 | $4,100 – $10,000 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Excavation | cubic yard | 2 | — | $135.00 | $50.00 – $135.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Aggregate, 703.01, No. 2 | cubic yard | 1 | — | $360.00 | $360.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| 36 inch storm sewer, as per plan | linear foot | 1 | — | $340.00 | $340.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Rock Channel Protection, Type C With Fabric Filter | cubic yard | 1 | — | $340.00 | $340.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| STEEL PILES, MISC.: SOLDIER PILES - HP12x74 | linear foot | 1 | — | $60.00 | $60.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| STEEL PILES, MISC.: SOLDIER PILES - HP16x101 | linear foot | 1 | — | $67.00 | $67.00 | Sep 4, 2025, Open bid tab, 0000030445 ↗ |
| Aggregate Surface Course, #57 Limestone, As Per Plan | cubic yard | 1 | — | $65.00 | $65.00 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Seeding And Mulching, Class 3C | square yard | 1 | — | $8.00 | $8.00 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Porous Backfill With Geotextile Fabric, As Per Plan | ton | 1 | — | $65.00 | $65.00 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Concrete, Misc.: Precast Box Culvert | ls | 1 | — | $110,000 | $110,000 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Class C Concrete [Ret Wall/Wingwall-Incl. Ftg.] | cubic yard | 1 | — | $1,900 | $1,900 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Guardrail, Type Mgs, As Per Plan | linear foot | 1 | — | $60.00 | $60.00 | Sep 4, 2025, Open bid tab, 0000030445 ↗ |
| Aggregate Base, Size No. 2, As Per Plan | cubic yard | 1 | — | $280.00 | $280.00 | Sep 4, 2025, Open bid tab, 0000030445 ↗ |
| Headwall, Half-Height For Corrugated Metal Pipe & Plastic Pipe, As Per Plan | each | 1 | — | $3,000 | $3,000 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Headwall, Full-Height, As Per Plan | each | 1 | — | $5,000 | $5,000 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Geotextile Fabric, As Per Plan | square yard | 1 | — | $100.00 | $100.00 | Sep 4, 2025, Open bid tab, 0000030445 ↗ |
| Backfill | cubic yard | 1 | — | $80.00 | $80.00 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Rock Channel Protection, Type B, With Filter | cubic yard | 1 | — | $110.00 | $110.00 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |
| Ditch Erosion Protection | square yard | 1 | — | $10.00 | $10.00 | Sep 4, 2025, Open bid tab, 0000030445 ↗ |
| _ Ditch Cleanout | linear foot | 1 | — | $10.00 | $10.00 | Sep 4, 2025, Open bid tab, 0000030445 ↗ |
| Pipe Removed, Over 24 Inch | linear foot | 1 | — | $68.00 | $68.00 | Nov 6, 2025, Open bid tab, 0000030446 ↗ |
| Type 3 Waterproofing | square yard | 1 | — | $25.00 | $25.00 | Aug 21, 2025, Open bid tab, 0000030447 ↗ |