City of Willoughby: awarded unit prices

517 winning bid prices read from 22 source documents, 2020–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Willoughby

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Contingency/Discretionary Allowancels16$22,500$30,000$10,000 – $265,000Aug 5, 2026, Open bid tab, 0000049899 ↗
Maintaining Traffic, As Per Planls14$25,500$50,000$1,500 – $80,250Aug 5, 2026, Open bid tab, 0000049899 ↗
Bonds And Insurances, As Per Planls13$7,500$5,500$3,175 – $45,000Aug 5, 2026, Open bid tab, 0000049899 ↗
Valve Box Adjusted To Grade, As Per Planeach8$202.50$250.00$50.00 – $470.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Traffic Paint, As Per Planls8$4,500$6,340$2,100 – $8,126Aug 5, 2026, Open bid tab, 0000049899 ↗
MANHOLE ADJUSTED TO GRADE, METHOD D.1 (brick), AS PER PLANeach7$650.00$1,100$225.00 – $1,100Aug 5, 2026, Open bid tab, 0000049899 ↗
Asphalt Concrete Surface Course, Type 1, (448), Pg64-22, As Per Plancubic yard7$240.00$240.00$143.00 – $270.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Preconstruction Video Documentationls7$1,800$735.00$525.00 – $21,000May 15, 2026, Open bid tab, 0000032628 ↗
Tack Coat, Trackless Tackgallon7$3.00$2.00$2.00 – $5.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Mobilizationls7$49,500$9,100$2,500 – $149,469May 15, 2026, Open bid tab, 0000032628 ↗
Clearing and Grubbingls7$7,549$1,000$1,000 – $18,500May 15, 2026, Open bid tab, 0000032628 ↗
CATCH BASIN ADJUSTED TO GRADE, METHOD D.1 (brick), AS PER PLANeach6$925.00$1,200$700.00 – $1,200Aug 5, 2026, Open bid tab, 0000049899 ↗
Special - Miscellaneous Metalpound6$2.00$4.00$1.50 – $4.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Excavation Of Subgrade And Embankment With Granular Material, Ccs, Fabric, As Per Plancubic yard5$70.00$70.00$50.00 – $140.50Aug 5, 2026, Open bid tab, 0000049899 ↗
4 inch concrete walk, including remove, as per plansquare foot5$13.30$17.00$8.90 – $17.00Oct 31, 2025, Open bid tab, 230264 ↗
Lawn Restoration Incl. Lineal Grading & Topsoil, As Per Planls5$11,375$10,000$4,750 – $15,500May 15, 2026, Open bid tab, 0000032628 ↗
Single Chip Seal, Type A, As Per Plansquare yard5$2.00$2.00$1.65 – $2.88Aug 5, 2026, Open bid tab, 0000049899 ↗
Asphalt Concrete Intermediate Course, Type 1, (448), As Per Plancubic yard5$215.00$230.00$142.00 – $270.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Partial deep pavement repair, as per plansquare yard5$40.00$75.00$26.20 – $75.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Construction Layout Stakes And Surveying, As Per Planls5—$3,700$3,700 – $35,000May 15, 2026, Open bid tab, 0000032628 ↗
Asphalt concrete curb, including remove, as per planlinear foot4—$25.00$18.00 – $38.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Full deep pavement remove and rigid replace, class qc ms, t=9 inch, as per plansquare yard4—$195.00$90.00 – $195.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Curb, type 6, qcms concrete, including remove, as per planlinear foot4—$55.00$25.00 – $55.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Pavement milling, asphalt concrete, as per plansquare yard4—$3.00$2.40 – $18.50Aug 5, 2026, Open bid tab, 0000049899 ↗
6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, Type A, As Per Planeach4—$11,234$4,850 – $11,234Mar 14, 2025, Open bid tab, 150772 ↗
Temporary Sediment And Erosion Control, As Per Planls4—$1,000$1,000 – $2,995May 15, 2026, Open bid tab, 0000032628 ↗
Utility Company Charges Allowancels4—$30,000$3,500 – $30,000Oct 31, 2025, Open bid tab, 230264 ↗
Pavement Repair, As Per Plancubic yard4—$385.00$205.00 – $385.00Aug 5, 2026, Open bid tab, 0000049899 ↗
Embankmentcubic yard4—$30.00$10.00 – $50.00Sep 1, 2025, Open bid tab, 240113501 ↗
Tack Coatgallon4—$2.00$2.00 – $4.40Sep 1, 2025, Open bid tab, 240113501 ↗
Pipe Removed, 24 Inch And Under, As Per Planlinear foot3—$10.00$10.00 – $20.00Mar 14, 2025, Open bid tab, 150772 ↗
Monument Box Reconstructed To Gradeeach3—$800.00$100.00 – $800.00Jul 7, 2026, Open bid tab, 0000047809 ↗
6 inch curb ramp, including remove, as per plansquare foot3—$36.00$10.95 – $36.00May 22, 2026, Open bid tab, 0000045671 ↗
Special - concrete seal surface treatment, sinak, as per plansquare yard3—$10.00$5.50 – $12.00May 15, 2026, Open bid tab, 0000032628 ↗
6 inch concrete walk, including remove, as per plansquare foot3—$9.00$9.00 – $15.75Mar 14, 2025, Open bid tab, 150772 ↗
8 Inch Gate Valve And Valve Box, As Per Planeach3—$2,150$2,150 – $2,674Nov 1, 2024, Open bid tab, 231956 ↗
Connect New Water Main To Existing Water Main, As Per Planeach3—$1,000$1,000 – $3,000Nov 1, 2024, Open bid tab, 231956 ↗
Curb, type 6, including remove, as per planlinear foot3—$50.00$23.50 – $50.00May 22, 2026, Open bid tab, 0000045671 ↗
Erosion Control Mat, Type Csquare yard3—$4.00$3.00 – $15.00Mar 14, 2025, Open bid tab, 150772 ↗
Concrete apron or drive replace, as per plansquare yard3—$200.00$96.00 – $252.68Sep 1, 2025, Open bid tab, 240113501 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.