| 4 inch shallow pipe underdrains, 707.31 (perforated), as per plan | linear foot | 1 | — | $10.00 | $10.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Seeding And Mulching, Class I, As Per Plan | square yard | 1 | — | $2.00 | $2.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 1 | — | $240.00 | $240.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 | cubic yard | 1 | — | $260.00 | $260.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Sign, Flat Sheet | square foot | 1 | — | $30.00 | $30.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Excavation of subgrade and structure embankment, as per plan | cubic yard | 1 | — | $10.00 | $10.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 1 | — | $2,500 | $2,500 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| 8 inch conduit, type b, 707.45, as per plan | linear foot | 1 | — | $15.00 | $15.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| 6 inch conduit, type b, 707.45, as per plan | linear foot | 1 | — | $10.00 | $10.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| 4 inch conduit, type b, 707.45, as per plan | linear foot | 1 | — | $5.00 | $5.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 1 | — | $100.00 | $100.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Ground Mounted Support, No. 3 Post | linear foot | 1 | — | $10.00 | $10.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Maintaining Traffic | ls | 1 | — | $100.00 | $100.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 1 | — | $10.00 | $10.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 1 | — | $50.00 | $50.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 1 | — | $1.00 | $1.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Excavation, Including Embankment Construction, As Per Plan | cubic yard | 1 | — | $10.00 | $10.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $100.00 | $100.00 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |
| Mobilization | ls | 1 | — | $1,000 | $1,000 | Dec 7, 2023, Open bid tab, bidtabfaywco2302pdf ↗ |