| Install Valve Box - Water | each | 1 | — | $440.00 | $440.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Adjust Frame And Ring Casting - Sanitary With Infi-Shield | each | 1 | — | $605.00 | $605.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Construct drainage structure design 4020-60 inch | linear foot | 1 | — | $920.00 | $920.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Construct Drainage Structure Design 2'X3' | linear foot | 1 | — | $450.00 | $450.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Casting Assembly (Neenah R-3067) | each | 1 | — | $1,055 | $1,055 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Casting Assembly (Neenah R-1733) - Storm | each | 1 | — | $745.00 | $745.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Casting Assembly (Neenah R-1733) - Sanitary With Infi-Shield | each | 1 | — | $1,015 | $1,015 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Connect To Existing Storm | each | 1 | — | $740.00 | $740.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Connect To Existing Tile | each | 1 | — | $95.00 | $95.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 6 inch perforated pvc pipe drain (sdr 35) | linear foot | 1 | — | $26.00 | $26.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Type Sp 12.5 Non-Wearing Course Mix (3,C) | ton | 1 | — | $86.80 | $86.80 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Milling asphalt surface (special) | square yard | 1 | — | $1.65 | $1.65 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Milling asphalt surface (full deep) | square yard | 1 | — | $2.45 | $2.45 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Stabilizing Aggregate (Cv) | cubic yard | 1 | — | $36.50 | $36.50 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Concrete Curb Design V | linear foot | 1 | — | $68.85 | $68.85 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Adjust Frame And Ring Casting (Storm) | each | 1 | — | $225.00 | $225.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Turf Establishment | square yard | 1 | — | $8.90 | $8.90 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 12 inch solid line paint | linear foot | 1 | — | $1.10 | $1.10 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 6 inch solid line paint | linear foot | 1 | — | $0.4 | $0.4 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Adjust Valve Box-water | each | 1 | — | $215.00 | $215.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 12 inch rc pipe sewer design 3006 class v | linear foot | 1 | — | $60.00 | $60.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Type Sp 9.5 Wearing Course Mix (3,C) | ton | 1 | — | $82.75 | $82.75 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Drill & grout reinforced bar (epoxy coated) | each | 1 | — | $16.35 | $16.35 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 18 inch rc pipe sewer design 3006 class iii | linear foot | 1 | — | $74.00 | $74.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Remove Sewer Pipe (Storm) | linear foot | 1 | — | $15.00 | $15.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Remove Drainage Structure | each | 1 | — | $445.00 | $445.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 15 inch rc pipe sewer design 3006 class v | linear foot | 1 | — | $70.00 | $70.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Excavation - Subgrade | cubic yard | 1 | — | $14.50 | $14.50 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Remove Concrete Walk | square foot | 1 | — | $1.55 | $1.55 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 4 inch broken line paint | linear foot | 1 | — | $0.3 | $0.3 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Aggregate Base (Cv) Class 5 | cubic yard | 1 | — | $48.75 | $48.75 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 6 inch concrete driveway pavement | square yard | 1 | — | $111.60 | $111.60 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Asphalt material for tack coat | gallon | 1 | — | $2.35 | $2.35 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Concrete Curb and Gutter Design B618 | linear foot | 1 | — | $35.50 | $35.50 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| 6 inch concrete walk | square foot | 1 | — | $10.25 | $10.25 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Milling asphalt surface (1.5 inch) | square yard | 1 | — | $1.95 | $1.95 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Remove asphalt pavement | square yard | 1 | — | $2.00 | $2.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Truncated Domes | square foot | 1 | — | $85.00 | $85.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Storm Drain Inlet Protection | each | 1 | — | $125.00 | $125.00 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |
| Excavation Common | cubic yard | 1 | — | $15.60 | $15.60 | Mar 27, 2025, Open bid tab, 2025-02 ↗ |