| Clearing And Grubbing, As Per Plan | ls | 4 | — | $94,235 | $10,000 – $94,235 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Removed, As Per Plan | ls | 4 | — | $2,232 | $2,232 – $35,000 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Aggregate Base | cubic yard | 4 | — | $63.00 | $25.00 – $63.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 3 | — | $2.00 | $2.00 – $4.44 | Aug 10, 2023, Open bid tab, bidtabaugwap2212pdf ↗ |
| Erosion Control | each | 3 | — | $1.00 | $1.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 3 | — | $9,824 | $5,205 – $9,900 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $42.00 | $32.00 – $50.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $39.00 | $25.00 – $45.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $33.00 | $18.00 – $40.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Maintaining Traffic | ls | 3 | — | $49,099 | $3,057 – $49,099 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 6-Inch Fire Hydrant Assembly, As Per Plan (Fire Hydrant #6) | each | 2 | — | $8,494 | $8,494 – $10,100 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| 6-Inch Fire Hydrant Assembly, As Per Plan (Fire Hydrant #5) | each | 2 | — | $7,820 | $7,820 – $10,100 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| 6-Inch Fire Hydrant Assembly, As Per Plan (Fire Hydrant #4) | each | 2 | — | $8,869 | $7,300 – $8,869 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| 6-Inch Fire Hydrant Assembly, As Per Plan (Fire Hydrant #3) | each | 2 | — | $8,195 | $7,300 – $8,195 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| 6-Inch Fire Hydrant Assembly, As Per Plan (Fire Hydrant #2) | each | 2 | — | $9,524 | $9,524 – $10,100 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| 6-Inch Fire Hydrant Assembly, As Per Plan (Fire Hydrant #1) | each | 2 | — | $7,820 | $7,820 – $8,650 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| 10 inchawwa c-909 pc-235 water main, as per plan | linear foot | 2 | — | $68.00 | $68.00 – $155.00 | Aug 10, 2023, Open bid tab, bidtabaugwap2212pdf ↗ |
| 6 inchawwa c-909 pc-235 water main, as per plan | linear foot | 2 | — | $43.00 | $43.00 – $78.00 | Aug 10, 2023, Open bid tab, bidtabaugwap2212pdf ↗ |
| Televising Sanitary Laterals | ls | 2 | — | $3,500 | $3,500 – $5,489 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s3 ↗ |
| Sign, Double Faced, Black Background, Street Name, As Per Plan | each | 2 | — | $275.00 | $103.78 – $275.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s0 ↗ |
| Sign, Black Background, Flat Sheet, As Per Plan | square foot | 2 | — | $31.00 | $23.06 – $31.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s0 ↗ |
| Traffic Sign Support System, As Per Plan | each | 2 | — | $450.00 | $172.96 – $450.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s0 ↗ |
| Asphalt Rejuvenating Agent | square yard | 2 | — | $2.50 | $1.14 – $2.50 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s0 ↗ |
| Final Sanitary Sewer Tv | ls | 2 | — | $7,500 | $4,843 – $7,500 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s3 ↗ |
| 6 inch sanitary sewer lateral, as per plan | linear foot | 2 | — | $82.00 | $58.79 – $82.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s3 ↗ |
| Manhole Removed | each | 2 | — | $1,150 | $366.89 – $1,150 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s3 ↗ |
| Remove of ground mounted sign and disposal | each | 2 | — | $16.50 | $11.53 – $16.50 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s0 ↗ |
| Sign, Flat Sheet | square foot | 2 | — | $30.00 | $23.06 – $30.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s0 ↗ |
| Non-Tracking Tack Coat | gallon | 2 | — | $15.75 | $3.00 – $15.75 | Aug 10, 2023, Open bid tab, bidtabaugwap2212pdf ↗ |
| Catch Basin Removed | each | 2 | — | $550.00 | $201.79 – $550.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s2 ↗ |
| Pipe removed, 24 inch and under | linear foot | 2 | — | $15.00 | $9.78 – $15.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s2 ↗ |
| 6-Inch Watch Valve, As Per Plan | each | 2 | — | $3,526 | $825.00 – $3,526 | Jun 11, 2026, Open bid tab, bidtabaugwap2607pdf ↗ |
| Fire Hydrant Removed | each | 2 | — | $750.00 | $366.89 – $750.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s1 ↗ |
| 3/4 inch water service branch, as per plan | linear foot | 2 | — | $86.00 | $40.98 – $86.00 | May 18, 2023, Open bid tab, bidtabaugwap1914pdf-s1 ↗ |
| Videotaping Of Construction Area | ls | 2 | — | $1,786 | $1,500 – $1,786 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 12 inch gate valve | each | 2 | — | $4,136 | $3,291 – $4,136 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| 12 inch awwa c-909 pc-235 water main, as per plan | linear foot | 2 | — | $73.50 | $73.50 – $205.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Valve Box Removed | each | 2 | — | $413.00 | $250.00 – $413.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Curb Removed | linear foot | 2 | — | $7.00 | $2.14 – $7.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 2 | — | $576.00 | $171.81 – $576.00 | Apr 10, 2025, Open bid tab, 1bidtabaugwap2214pdf ↗ |