| Gravity Dewatering | ls | 1 | — | $2,305 | $2,305 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Connect TO Existing Pipe Drain | each | 1 | — | $1,287 | $1,287 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| 8 inch perf pvc pipe drain | linear foot | 1 | — | $44.31 | $44.31 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Iron-Enhanced Filter Media | cubic yard | 1 | — | $165.90 | $165.90 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Plastic Liner | square yard | 1 | — | $21.63 | $21.63 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Fine Filter Aggregate (cv) | cubic yard | 1 | — | $92.84 | $92.84 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Remove Pipe Drain | linear foot | 1 | — | $6.33 | $6.33 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Coarse Filter Aggregate (Cv) | cubic yard | 1 | — | $158.25 | $158.25 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Street Sweeper (With Pickup Broom) | hour | 1 | — | $200.45 | $200.45 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Sediment Control Log Type Compost | linear foot | 1 | — | $5.28 | $5.28 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Alternate Pedestrian Route | ls | 1 | — | $1,055 | $1,055 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Stabilized Construction Exit | ls | 1 | — | $1,688 | $1,688 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Storm Drain Inlet Protection | each | 1 | — | $263.75 | $263.75 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Landscape Restoration | ls | 1 | — | $5,990 | $5,990 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Excavation Common | cubic yard | 1 | — | $46.42 | $46.42 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Traffic Control | ls | 1 | — | $2,110 | $2,110 | Aug 27, 2026, Open bid tab, 26-10A ↗ |
| Mobilization | ls | 1 | — | $15,825 | $15,825 | Aug 27, 2026, Open bid tab, 26-10A ↗ |