| Construction Layout Stakes And Surveying, As Per Plan | ls | 2 | — | $7,500 | $2,000 – $7,500 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Maintaining Traffic | ls | 2 | — | $150,000 | $2,500 – $150,000 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Walk Removed | square foot | 2 | — | $5.00 | $5.00 – $12.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Existing pipe remove lin. | linear foot | 1 | — | $5.00 | $5.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Sheeting And Bracing Ordered Left In Place | mfbm | 1 | — | $1.00 | $1.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Brick Masonry Cu. | yds | 1 | — | $1.00 | $1.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Fire Hydrant Flow Testing (Existing) | each | 1 | — | $291.00 | $291.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Fire Hydrant Flow Testing (New) | each | 1 | — | $291.00 | $291.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Resetting Existing Valve Box, Complete | each | 1 | — | $5.00 | $5.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Remove curb and roadway box | each | 1 | — | $5.00 | $5.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Relocating existing 5/8 inch frost-proof meter setting | each | 1 | — | $851.00 | $851.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing And Installing Curb And Roadway Box (Reconnect) | each | 1 | — | $200.00 | $200.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Reconnecting existing 1 inch service branch | each | 1 | — | $989.00 | $989.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Reconnecting existing 3/4 inch service branch | each | 1 | — | $937.50 | $937.50 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and installing 1 1/2 inch copper service pipe w/ aqua shield lin. | linear foot | 1 | — | $137.75 | $137.75 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and installing 3/4 inch copper service pipe w/ aqua shield lin. | linear foot | 1 | — | $69.75 | $69.75 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Changing 10 inch thru 24 inch pipe sewer lin. | linear foot | 1 | — | $25.00 | $25.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Changing 8 inch and under pipe sewer lin. | linear foot | 1 | — | $25.00 | $25.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Remove existing valve box | each | 1 | — | $5.00 | $5.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Remove existing manhole curb and cover | each | 1 | — | $275.00 | $275.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Exploratory Excavation Cu. | yds | 1 | — | $25.00 | $25.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Additional Excavation Cu. | yds | 1 | — | $25.00 | $25.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and installing valve box with 1 inch air release complete | each | 1 | — | $1,376 | $1,376 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing And Installing Valve Box Complete | each | 1 | — | $251.00 | $251.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and installing fire hydrant extension, 12 inch long | each | 1 | — | $1,583 | $1,583 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and installing fire hydrant extension, 6 inch long | each | 1 | — | $1,423 | $1,423 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Remove fire hydrant | each | 1 | — | $75.00 | $75.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Hauling And Installing Fire Hydrant | each | 1 | — | $993.00 | $993.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Concrete, Class "C" Cu. | yds | 1 | — | $125.00 | $125.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and laying 8 inch ductile iron pipe and fitting lin. | linear foot | 1 | — | $289.50 | $289.50 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Furnishing and laying 6 inch ductile iron pipe and fitting lin. | linear foot | 1 | — | $191.50 | $191.50 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Prefabricated Modular Retaining Wall | square foot | 1 | — | $99.00 | $99.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| 4 inch topsoil | cubic yard | 1 | — | $50.00 | $50.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Raised Pavement Marking Removed | each | 1 | — | $10.00 | $10.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Rpm (White) | each | 1 | — | $50.66 | $50.66 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Rpm (Yellow/Yellow) | each | 1 | — | $50.66 | $50.66 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| 18 inch conduit, type b | linear foot | 1 | — | $100.00 | $100.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| 12 inch conduit, type d | linear foot | 1 | — | $60.00 | $60.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| 4 inch conduit, type f | linear foot | 1 | — | $35.00 | $35.00 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |
| Anchor Assembly, Mgs Type T | each | 1 | — | $1,250 | $1,250 | Mar 2, 2026, Open bid tab, bidtabhamsha2404pdf ↗ |