| Maintaining Traffic | ls | 3 | — | $142,038 | $6,500 – $142,038 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $50.00 | $5.00 – $50.00 | Apr 2, 2020, Open bid tab, bidtabmotriv1812pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $50.00 | $5.00 – $50.00 | Apr 2, 2020, Open bid tab, bidtabmotriv1812pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $50.00 | $5.00 – $50.00 | Apr 2, 2020, Open bid tab, bidtabmotriv1812pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 2 | — | $201.70 | $201.70 – $225.00 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Reconstruct Concrete Barrier | linear foot | 1 | — | $248.76 | $248.76 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Catch Basin Reconstructed To Grade, As Per Plan | each | 1 | — | $2,150 | $2,150 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Inlet Top, As Per Plan | each | 1 | — | $3,666 | $3,666 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Guardrail Rebuilt | each | 1 | — | $42,094 | $42,094 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Concrete barrier removed at inlet, as per plan | linear foot | 1 | — | $115.42 | $115.42 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Concrete Barrier Removed | linear foot | 1 | — | $116.10 | $116.10 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Guardrail Removed For Reuse | each | 1 | — | $850.00 | $850.00 | Jun 2, 2022, Open bid tab, bidtabmotriv2123pdf ↗ |
| Signing, Misc.: Sign (Extrusheet,) As Per Plan | square foot | 1 | — | $25.50 | $25.50 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Signing, Misc.: Sign Support Beam, As Per Plan | linear foot | 1 | — | $46.00 | $46.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Signing, Misc.: Sign Support Foundation, As Per Plan | each | 1 | — | $965.00 | $965.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Barrier Reflector | each | 1 | — | $7.50 | $7.50 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Mobilization (Emergency), As Per Plan | each | 1 | — | $1,275 | $1,275 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Mobilization, As Per Plan | each | 1 | — | $850.00 | $850.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Delineator | each | 1 | — | $65.00 | $65.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Maintenance Of Traffic, Misc.:Flagger Closure | hour | 1 | — | $72.00 | $72.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Maintenance Of Traffic, Misc.:One Lane Closure On Multilane Highway | hour | 1 | — | $175.00 | $175.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Maintenance Of Traffic, Misc.:Shoulder Closure | hour | 1 | — | $155.00 | $155.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Fence, Type 47 | linear foot | 1 | — | $17.80 | $17.80 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Impact Attenuator, Type 2 (Bidirectional) | each | 1 | — | $22,550 | $22,550 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Impact Attenuator, Type 2 (Unidirectional) | each | 1 | — | $22,350 | $22,350 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Impact Attenuator, Type 1 (Bidirectional) | each | 1 | — | $4,470 | $4,470 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Impact Attenuator, Type 1 (Unidirectional) | each | 1 | — | $4,470 | $4,470 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Bridge Terminal Assembly, Mgs Type 2 | each | 1 | — | $500.00 | $500.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Bridge Terminal Assembly, Type 2 | each | 1 | — | $500.00 | $500.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Bridge Terminal Assembly, Mgs Type 1 | each | 1 | — | $2,270 | $2,270 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Bridge Terminal Assembly, Type 1 | each | 1 | — | $1,485 | $1,485 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Anchor Assembly, Mgs Type B | each | 1 | — | $1,990 | $1,990 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Anchor Assembly, Mgs Type A | each | 1 | — | $1,285 | $1,285 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Anchor Assembly, Type T | each | 1 | — | $825.00 | $825.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Anchor Assembly, Type E | each | 1 | — | $2,375 | $2,375 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Anchor Assembly, Type B | each | 1 | — | $1,965 | $1,965 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Anchor Assembly, Type A | each | 1 | — | $1,250 | $1,250 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Guardrail Post, Mgs Long Post | each | 1 | — | $16.00 | $16.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Guardrail Post, 9 Feet | each | 1 | — | $17.50 | $17.50 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |
| Guardrail, Post | each | 1 | — | $60.00 | $60.00 | Mar 12, 2020, Open bid tab, bidtabmotriv1913pdf ↗ |