Agency · awarded bid prices

City of Peoria: awarded unit prices

1,157 winning bid prices read from 36 source documents, 2020–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Peoria

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Mobilizationls22—$19,000$1,816 – $533,822Jul 23, 2026, Bid tabulation p. 1
Sidewalk removesquare foot20$2.70$2.70$1.64 – $4.77Feb 10, 2025, Bid tabulation p. 1
Traffic Control And Protection, (Special)ls18—$13,100$3,500 – $150,000Jul 23, 2026, Bid tabulation p. 1
Earth Excavationcubic yard17$55.83$92.43$23.00 – $176.65Apr 22, 2025, Bid tabulation p. 1
Detectable Warningssquare foot16$30.50$38.09$22.93 – $40.00Apr 22, 2025, Bid tabulation p. 1
Driveway pavement removesquare yard15$22.59$61.92$14.00 – $77.00Feb 10, 2025, Bid tabulation p. 1
Construction Layoutls14—$25,601$2,248 – $175,540Apr 22, 2025, Bid tabulation p. 1
Pavement removesquare yard14$22.93$17.95$15.00 – $66.99Feb 10, 2025, Bid tabulation p. 1
Combination curb and gutter removelinear foot13$14.00$22.11$8.00 – $78.84Feb 10, 2025, Bid tabulation p. 1
Inlet Filterseach13$200.00$264.17$99.38 – $1,167Apr 22, 2025, Bid tabulation p. 1
Portland cement concrete sidewalk, 4 inchsquare foot12$11.05$13.04$6.45 – $27.71Feb 10, 2025, Bid tabulation p. 1
Topsoil furnish and place, 4 inchsquare yard11$10.47$11.68$5.00 – $13.43Feb 10, 2025, Bid tabulation p. 1
Curb removelinear foot10$13.25$25.26$10.61 – $113.89Mar 25, 2024, Bid tabulation p. 1
Inlet to be adjustedeach10$821.05$842.10$601.94 – $2,393Feb 10, 2025, Bid tabulation p. 1
Supplemental Wateringunit10$163.13$166.84$1.00 – $312.00Feb 10, 2025, Bid tabulation p. 1
Potassium Fertilizer Nutrientpound10$7.79$3.06$3.00 – $11.27Feb 10, 2025, Bid tabulation p. 1
Nitrogen Fertilizer Nutrientpound10$7.79$3.06$3.00 – $11.27Feb 10, 2025, Bid tabulation p. 1
Combination Concrete Curb And Gutter, Type B-6.12linear foot10$62.44$63.25$30.00 – $107.07Jul 23, 2026, Bid tabulation p. 1
Soddingsquare yard10$20.69$37.87$16.83 – $65.04Apr 22, 2025, Bid tabulation p. 1
Portland Cement Concrete Driveway Pavement, 6 Inchsquare yard9$87.58$102.15$63.00 – $148.50Feb 10, 2025, Bid tabulation p. 1
Phosphorus Fertilizer Nutrientpound9$7.60$3.06$3.00 – $11.27Feb 10, 2025, Bid tabulation p. 1
Concrete Curb, Type Blinear foot9$55.00$109.27$32.81 – $155.63Feb 22, 2024, Bid tabulation p. 1
Portland Cement Concrete Driveway Pavement, 8 Inchsquare yard8$88.00$148.34$68.00 – $148.34Mar 25, 2024, Bid tabulation p. 1
Trench Backfillcubic yard7$43.69$56.40$33.24 – $58.99Apr 22, 2025, Bid tabulation p. 1
Asphalt materials (tack coat)pound6$1.89$1.69$1.69 – $2.63Feb 22, 2024, Bid tabulation p. 1
Storm sewers, type 1, water main quality pipe, 12 inchlinear foot6$112.99$109.87$109.87 – $130.36Feb 10, 2025, Bid tabulation p. 2
Combination Concrete Curb And Gutter, Type B-6.18linear foot6$46.81$78.48$32.76 – $78.48Feb 10, 2025, Bid tabulation p. 1
Sodding Salt Tolerantsquare yard6$15.85$16.74$11.00 – $94.30Jan 10, 2023, Bid tabulation p. 1
Hot-Mix Asphalt Surface Course, Il-9.5, Mix "C", N50ton5$154.50$131.44$114.17 – $165.44Mar 25, 2024, Bid tabulation p. 1
Aggregate For Temporary Accesston5$46.33$48.27$27.32 – $50.00Mar 25, 2024, Bid tabulation p. 1
Inlet, type g-1each5$3,973$4,981$2,200 – $4,981Feb 10, 2025, Bid tabulation p. 2
Hot-mix asphalt surface remove, variable deepsquare yard5$16.68$16.68$5.35 – $37.75Feb 10, 2025, Bid tabulation p. 1
Pavement patch (special)square yard5$140.50$244.20$133.89 – $244.20Mar 23, 2023, Bid tabulation p. 1
Manhole to be adjustedeach5$1,210$1,274$545.07 – $2,000Feb 10, 2025, Bid tabulation p. 1
Protective Coatsquare yard5—$0.01$0.01 – $2.00Jan 10, 2023, Bid tabulation p. 1
Bit Matls Tack Ctpound5$1.10$2.13$1.00 – $2.13Apr 22, 2025, Bid tabulation p. 1
P.c.c. sidewalk, 4 inchsquare foot5$13.70$23.60$6.75 – $23.60Sep 13, 2022, Bid tabulation p. 1
Remove And Reset Brick Sidewalksquare foot4—$20.00$10.00 – $150.00Sep 21, 2021, Bid tabulation p. 1
P.c.c. driveway pavement, 8 inchsquare yard4—$110.00$80.00 – $110.00Sep 21, 2021, Bid tabulation p. 1
P.c.c. driveway pavement, 6 inchsquare yard4—$92.00$70.00 – $92.00Sep 21, 2021, Bid tabulation p. 1

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Illinois: statewide figures.