| Traffic Control | ls | 9 | $6,000 | $22,365 | $3,100 – $29,000 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Mobilization | ls | 9 | $55,000 | $142,536 | $4,000 – $318,000 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Curb & Gutter | linear foot | 8 | $6.35 | $10.25 | $3.25 – $10.25 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| 6 inch concrete walk | square foot | 8 | $14.05 | $12.05 | $9.40 – $36.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Truncated Domes | square foot | 8 | $57.50 | $68.00 | $50.00 – $70.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Storm Drain Inlet Protection | each | 8 | $198.50 | $175.00 | $100.00 – $300.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Street Sweeper (With Pickup Broom) | hour | 7 | $190.00 | $190.00 | $25.00 – $270.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Grubbing | each | 7 | $120.00 | $120.00 | $100.00 – $500.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Clearing | each | 7 | $450.00 | $235.00 | $150.00 – $735.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Random Riprap Class III | cubic yard | 7 | $100.00 | $215.00 | $70.00 – $215.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Asphalt material for tack coat | gallon | 7 | $2.00 | $3.82 | $0.01 – $3.82 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Concrete Curb & Gutter Design B618 | linear foot | 7 | $29.00 | $30.51 | $24.00 – $51.50 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Silt Fence, Type MS | linear foot | 7 | $2.60 | $1.95 | $1.80 – $7.50 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| 4 inch concrete walk | square foot | 7 | $8.50 | $9.68 | $6.85 – $13.50 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Sediment Control Log Type Wood Fiber | linear foot | 6 | $4.10 | $3.30 | $3.30 – $5.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Type SP 9.5 Wearing Course Mixture (3,C) | ton | 6 | $88.21 | $86.42 | $82.50 – $230.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Common Laborers | hour | 6 | $96.00 | $96.00 | $25.00 – $120.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Sawing asphalt pavement (full deep) | linear foot | 6 | $2.75 | $3.50 | $1.95 – $5.75 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Sewer Pipe (Storm) | linear foot | 6 | $15.00 | $20.00 | $12.00 – $38.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Hydrant | each | 6 | $540.00 | $1,600 | $50.00 – $1,600 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| 6 inch concrete driveway pavement | square yard | 6 | $93.50 | $96.48 | $78.85 – $123.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Sawing concrete pavement (full deep) | linear foot | 6 | $4.50 | $4.00 | $1.00 – $8.00 | Feb 5, 2026, Open bid tab, 2026STRT-A84 - Sprin ↗ |
| Hydrant | each | 6 | $7,544 | $7,587 | $6,750 – $9,135 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Landscaping Restoration Allowance | dol | 5 | $1.00 | $1.00 | $0.01 – $1.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Construct Drainage Structure Design 48-4022 | linear foot | 5 | $665.00 | $1,067 | $625.00 – $1,067 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Stabilizing Aggregate (Cv) | cubic yard | 5 | $35.00 | $52.56 | $1.00 – $52.56 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| 4 inch concrete walk special (poetry) | square foot | 5 | $9.50 | $10.35 | $7.85 – $19.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Sign Panels Type C | square foot | 5 | $90.00 | $90.00 | $48.00 – $109.00 | Feb 5, 2026, Open bid tab, 2026STRT-A84 - Sprin ↗ |
| 6 inch watermain ductile iron class 52 | linear foot | 5 | $80.00 | $225.00 | $65.00 – $225.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Concrete Driveway Pavement | square yard | 5 | $10.00 | $11.30 | $6.00 – $20.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Water Main | linear foot | 5 | $21.00 | $120.00 | $5.00 – $120.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Gate Valve & Box | each | 5 | $265.00 | $1,325 | $50.00 – $1,325 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| 6 inch gate valve & box | each | 5 | $3,300 | $3,788 | $2,800 – $3,800 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Common Embankment (Cv) (P) | cubic yard | 5 | $16.30 | $16.30 | $6.00 – $33.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Connect to Existing Storm Sewer | each | 5 | $1,150 | $890.00 | $890.00 – $1,500 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Concrete Walk | square foot | 5 | $1.00 | $0.46 | $0.46 – $2.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Rapid Stabilization Method 3 | thousand gallons | 5 | $685.00 | $685.00 | $300.00 – $1,110 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Stabilized Construction Exit | ls | 5 | $5,000 | $1,500 | $1,500 – $8,850 | Feb 5, 2026, Open bid tab, 2026STRT-A84 - Sprin ↗ |
| Connect to Existing Water Main | each | 5 | $1,500 | $1,425 | $1,150 – $2,000 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |
| Remove Sign | each | 5 | $42.00 | $42.00 | $28.00 – $50.00 | Mar 12, 2026, Open bid tab, 2026STRT-A83 - 2026 ↗ |