| Catch Basin Reconstruced To Grade | each | 1 | — | $2,130 | $2,130 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Secondary Clarifier Rehabilitation | each | 1 | — | $185,000 | $185,000 | Dec 13, 2022, Open bid tab, bidtabclanca2104pdf ↗ |
| Primary Clarifier Rehabilitation | each | 1 | — | $200,000 | $200,000 | Dec 13, 2022, Open bid tab, bidtabclanca2104pdf ↗ |
| Type 6 Barrier Curb, As Per Plan | linear foot | 1 | — | $65.00 | $65.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| 9 inch non-reinforced concrete pavement, as per plan | square yard | 1 | — | $150.00 | $150.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $2,500 | $2,500 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Asphalt Concrete Surface Course, Type 1, (449), Pg64-22 | cubic yard | 1 | — | $471.00 | $471.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 1 | — | $5.00 | $5.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| 4 inch concrete walk | square foot | 1 | — | $12.00 | $12.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Low Strength Mortar Backfill | cubic yard | 1 | — | $200.00 | $200.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $25.00 | $25.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $25.00 | $25.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $25.00 | $25.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Curb Removed | linear foot | 1 | — | $12.00 | $12.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Subgrade Compaction | square yard | 1 | — | $2.00 | $2.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 1 | — | $1,500 | $1,500 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Valve Box Adjusted To Grade | each | 1 | — | $500.00 | $500.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Remove of ground mounted sign and reerection | each | 1 | — | $244.22 | $244.22 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Maintaining Traffic | ls | 1 | — | $19,631 | $19,631 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Walkway Misc.: Brick Walk | square foot | 1 | — | $50.00 | $50.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Curb Ramp, As Per Plan | square foot | 1 | — | $26.00 | $26.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 1 | — | $42.00 | $42.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 1 | — | $2.00 | $2.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Excavation, Including Embankment Construction, As Per Plan | cubic yard | 1 | — | $96.20 | $96.20 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Walk Removed | square foot | 1 | — | $9.00 | $9.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $4,500 | $4,500 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |
| Aggregate Base | cubic yard | 1 | — | $110.00 | $110.00 | May 25, 2023, Open bid tab, bidtabclanca2206pdf ↗ |