| Sharrow Bike Lane Lane Symbol Marking, Type A1 | each | 1 | — | $525.00 | $525.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Bike Lane Symbol Marking, Type A1 | each | 1 | — | $225.00 | $225.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Portable Changeable Message Sign, As Per Plan | mnth | 1 | — | $900.00 | $900.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Law Enforcement Officer With Patrol Car For Enforcement, As Per Plan | hour | 1 | — | $100.00 | $100.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Guardrail and rubrail rebuilt, type 5, using 9 foot post | linear foot | 1 | — | $49.20 | $49.20 | May 9, 2025, Open bid tab, 241484 ↗ |
| Guardrail Rubrail Rebuilt | linear foot | 1 | — | $21.60 | $21.60 | May 9, 2025, Open bid tab, 241484 ↗ |
| Guardrail, type 5, rail replace | linear foot | 1 | — | $17.20 | $17.20 | May 9, 2025, Open bid tab, 241484 ↗ |
| Dumped Rock Fill, Type D | cubic yard | 1 | — | $158.00 | $158.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Partial deep pavement joint repair, as per plan | linear foot | 1 | — | $10.00 | $10.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Partial deep pavement repair (asphalt concrete base) | cubic yard | 1 | — | $600.00 | $600.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Rub Rail Removed | linear foot | 1 | — | $6.40 | $6.40 | May 9, 2025, Open bid tab, 241484 ↗ |
| Guardrail And Rubrail Removed For Reuse, As Per Plan | linear foot | 1 | — | $7.60 | $7.60 | May 9, 2025, Open bid tab, 241484 ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (448), As Per Plan | cubic yard | 1 | — | $186.00 | $186.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Valve Box Adjusted To Grade, As Per Plan | each | 1 | — | $1,000 | $1,000 | May 9, 2025, Open bid tab, 241484 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22, As Per Plan | cubic yard | 1 | — | $192.00 | $192.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Pavement milling, asphalt concrete, as per plan | square yard | 1 | — | $2.55 | $2.55 | May 9, 2025, Open bid tab, 241484 ↗ |
| Contingency/Discretionary Allowance | ls | 1 | — | $10,000 | $10,000 | May 9, 2025, Open bid tab, 241484 ↗ |
| Bonds And Insurances, As Per Plan | ls | 1 | — | $2,000 | $2,000 | May 9, 2025, Open bid tab, 241484 ↗ |
| Preconstruction Video Documentation | ls | 1 | — | $600.00 | $600.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Tack Coat, Trackless Tack | gallon | 1 | — | $2.75 | $2.75 | May 9, 2025, Open bid tab, 241484 ↗ |
| Guardrail Removed, As Per Plan | linear foot | 1 | — | $4.60 | $4.60 | May 9, 2025, Open bid tab, 241484 ↗ |
| Manhole Adjusted To Grade, As Per Plan | each | 1 | — | $1,000 | $1,000 | May 9, 2025, Open bid tab, 241484 ↗ |
| Edge line, 6 inch | mile | 1 | — | $1,025 | $1,025 | May 9, 2025, Open bid tab, 241484 ↗ |
| Edge line, 4 inch | mile | 1 | — | $725.00 | $725.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 1 | — | $198.00 | $198.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Center Line | mile | 1 | — | $1,300 | $1,300 | May 9, 2025, Open bid tab, 241484 ↗ |
| Maintaining Traffic | ls | 1 | — | $18,000 | $18,000 | May 9, 2025, Open bid tab, 241484 ↗ |
| Aggregate Base | cubic yard | 1 | — | $146.00 | $146.00 | May 9, 2025, Open bid tab, 241484 ↗ |
| Mobilization | ls | 1 | — | $20,000 | $20,000 | May 9, 2025, Open bid tab, 241484 ↗ |
| Excavation | cubic yard | 1 | — | $88.00 | $88.00 | May 9, 2025, Open bid tab, 241484 ↗ |