Contingency/Discretionary Allowancels8$67,500$115,000$10,000 – $185,000May 23, 2025, Open bid tab, 0000032272 ↗
Bonds And Insurances, As Per Planls7$12,000$35,000$4,900 – $35,000May 23, 2025, Open bid tab, 0000032272 ↗
Mobilizationls5$24,375$45,000$7,878 – $45,000May 23, 2025, Open bid tab, 0000032272 ↗
Marina bulkhead replacelinear foot4—$987.00$905.59 – $1,147Nov 24, 2023, Open bid tab, 232145 ↗
Excavation and remove of existing pavement, curb, & base, as per planls4—$58,036$32,000 – $70,000May 23, 2025, Open bid tab, 0000032272 ↗
Lawn Restoration Incl. Lineal Grading & Topsoil, As Per Planls4—$5,000$3,050 – $18,000Oct 20, 2023, Open bid tab, 231815 ↗
Traffic Paint, As Per Planls4—$8,500$2,800 – $9,000May 23, 2025, Open bid tab, 0000032272 ↗
Preconstruction Video Documentation, As Per Planls4—$1,000$600.00 – $1,000Jun 25, 2021, Open bid tab, 210495 ↗
Construction Layout Stakes And Surveyingls4—$30,000$4,000 – $30,000May 23, 2025, Open bid tab, 0000032272 ↗
Aggregate Basecubic yard4—$77.00$51.00 – $77.00May 23, 2025, Open bid tab, 0000032272 ↗
Excavation Including Embankment Construction, As Per Planls3—$55,407$27,000 – $55,407Oct 20, 2023, Open bid tab, 231815 ↗
Proof Rollinghour3—$300.00$150.00 – $569.37May 23, 2025, Open bid tab, 0000032272 ↗
Maintaining Traffic, As Per Planls3—$2,000$2,000 – $30,000May 23, 2025, Open bid tab, 0000032272 ↗
Curb, Type 6linear foot3—$17.50$12.00 – $30.00Oct 20, 2023, Open bid tab, 231815 ↗
Subgrade Compactionsquare yard3—$5.00$0.71 – $5.00May 23, 2025, Open bid tab, 0000032272 ↗
Tack Coatgallon3—$2.99$2.99 – $5.00Oct 20, 2023, Open bid tab, 231815 ↗
Tack Coat For Intermediate Coursegallon2—$5.00$2.50 – $5.00Jun 25, 2021, Open bid tab, 201002 ↗
4 Inch Shallow Pipe Underdrain, As Per Planlinear foot2—$21.00$14.96 – $21.00May 23, 2025, Open bid tab, 0000032272 ↗
Asphalt Concrete Intermediate Course, Type 2, Pg64-22, As Per Plancubic yard2—$211.00$132.00 – $211.00May 23, 2025, Open bid tab, 0000032272 ↗
Special - Concrete Parking Blockeach2—$170.00$160.79 – $170.00May 23, 2025, Open bid tab, 0000032272 ↗
Asphalt Concrete Surface Course, Type 1, Pg64-22, As Per Plancubic yard2—$282.00$143.00 – $282.00May 23, 2025, Open bid tab, 0000032272 ↗
Type "f" pavement replace (stone), driveway, apron, or parking lot, as per plansquare yard2—$18.00$18.00 – $25.00Jun 25, 2021, Open bid tab, 210495 ↗
Storm Outlet Control Structure, As Per Planeach2—$10,500$3,915 – $10,500May 23, 2025, Open bid tab, 0000032272 ↗
48 Inch Storm Manhole, As Per Planeach2—$3,200$2,300 – $3,200May 23, 2025, Open bid tab, 0000032272 ↗
Rock Channel Protection, Type C With Filtercubic yard2—$250.00$235.29 – $250.00May 23, 2025, Open bid tab, 0000032272 ↗
Temporary Sediment And Erosion Control, As Per Planls2—$20,000$5,000 – $20,000May 23, 2025, Open bid tab, 0000032272 ↗
Sign, Flat Sheet, With Mounting Posteach2—$500.00$500.00 – $850.00May 23, 2025, Open bid tab, 0000032272 ↗
Geotextile Fabric, As Per Plansquare yard2—$3.00$3.00 – $3.50Oct 15, 2021, Open bid tab, 190624 ↗
Preconstruction Video Documentationls2—$1,000$1,000 – $1,975May 23, 2025, Open bid tab, 0000032272 ↗
Catch Basin, No. 3Aeach2—$3,050$2,546 – $3,050May 23, 2025, Open bid tab, 0000032272 ↗
Pull Box Removedeach2—$250.00$250.00Jun 25, 2021, Open bid tab, 201002 ↗
Catch Basin Adjusted To Gradeeach2—$400.00$400.00 – $500.00May 23, 2025, Open bid tab, 0000032272 ↗
15 inch conduit, type b, as per planlinear foot2—$55.00$55.00 – $150.00May 23, 2025, Open bid tab, 0000032272 ↗
Excavation, As Per Plancubic yard2—$10.00$10.00 – $41.00May 23, 2025, Open bid tab, 0000032272 ↗
Catch Basin Removedeach2—$422.26$300.00 – $422.26Oct 20, 2023, Open bid tab, 231815 ↗
Pipe removed, 24 inch and underlinear foot2—$10.55$10.00 – $10.55Oct 20, 2023, Open bid tab, 231815 ↗
Seeding And Mulching, As Per Plansquare yard2—$1.65$1.65 – $1.98Jan 8, 2025, Open bid tab, 241472 ↗
Asphalt Concrete Base, Pg64-22cubic yard2—$146.00$120.00 – $146.00Jun 25, 2021, Open bid tab, 201002 ↗
Clearing And Grubbing, As Per Planls2—$68,000$5,250 – $68,000Jan 8, 2025, Open bid tab, 241472 ↗
Ground Rodeach2—$250.00$250.00Oct 20, 2023, Open bid tab, 231815 ↗