ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Traffic Controlls19$4,900$4,800$500.00 – $17,000Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Remove Curb & Gutterlinear foot17$9.00$13.00$2.67 – $19.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
6 inch concrete walksquare foot16$12.28$12.00$8.00 – $22.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Truncated Domessquare foot14$69.00$60.00$60.00 – $100.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
4 inch concrete walksquare foot14$9.52$7.15$5.65 – $17.00Apr 10, 2026, Open bid tab, ST-020 ↗
Sawing concrete pavement (full deep)linear foot13$6.00$7.00$3.90 – $15.00Apr 10, 2026, Open bid tab, ST-020 ↗
Adjust Frame & Ring Castingeach13$600.00$1,050$250.00 – $1,075Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Concrete Curb & Gutter Design B618linear foot13$42.20$43.50$21.15 – $83.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Storm Drain Inlet Protectioneach13$175.00$140.00$75.00 – $400.00Apr 10, 2026, Open bid tab, ST-020 ↗
Mobilizationls13$45,535$57,500$5,000 – $310,000Apr 21, 2026, Open bid tab, 139-109-006 - ST-002 ↗
Boulevard Topsoil Borrowcubic yard12$45.00$55.00$18.00 – $115.00Apr 10, 2026, Open bid tab, ST-020 ↗
Stabilized Construction Exitls12$1,000$1,000$1.00 – $1,500Apr 10, 2026, Open bid tab, ST-020 ↗
Remove asphalt surfacingsquare yard12$4.00$11.00$2.50 – $11.00Apr 10, 2026, Open bid tab, ST-020 ↗
Common Excavation (P)cubic yard12$15.75$20.00$8.00 – $62.00Apr 10, 2026, Open bid tab, ST-020 ↗
Remove Concrete Pavementsquare yard11$11.31$15.00$8.00 – $24.00Apr 10, 2026, Open bid tab, ST-020 ↗
Remove Sidewalksquare foot10$1.88$2.00$0.98 – $10.00Apr 10, 2026, Open bid tab, ST-020 ↗
Rapid Stabilization Method 3thousand gallons10$263.14$500.00$150.00 – $850.00Apr 10, 2026, Open bid tab, ST-020 ↗
Turf Establishmentls10$4,250$4,000$1,450 – $5,750Apr 10, 2026, Open bid tab, ST-020 ↗
Sawing bit pavement (full deep)linear foot10$3.25$7.00$1.86 – $7.00Apr 10, 2026, Open bid tab, ST-020 ↗
Geotextile Fabric Type 7square yard10$3.50$4.00$1.55 – $4.25Apr 10, 2026, Open bid tab, ST-020 ↗
6 inch concrete driveway pavementsquare yard9$80.85$85.14$46.00 – $110.80Apr 10, 2026, Open bid tab, ST-020 ↗
Construction drainage structure design aeach9$3,000$800.00$800.00 – $5,578Apr 10, 2026, Open bid tab, ST-020 ↗
7 inch concrete valley guttersquare yard8$90.00$120.50$82.00 – $140.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
8 inch pvc pipe sewerlinear foot8$62.00$60.00$55.00 – $75.00Apr 10, 2026, Open bid tab, ST-020 ↗
Aggregate Foundationton8$32.50$50.00$1.00 – $50.00Apr 10, 2026, Open bid tab, ST-020 ↗
Aggregate Base (Cv) Class 5 (P)cubic yard8$37.00$40.00$26.00 – $45.00Mar 12, 2025, Open bid tab, PK-013 RRFB and Trai ↗
6 inch pvc water mainlinear foot7$52.00$40.00$40.00 – $60.00Apr 10, 2026, Open bid tab, ST-020 ↗
48 inch diameter. sanitary sewer manholelinear foot7$700.00$1,028$550.00 – $1,200Apr 10, 2026, Open bid tab, ST-020 ↗
4 inch pvc pipe sewerlinear foot7$45.00$45.00$30.00 – $75.00Apr 10, 2026, Open bid tab, ST-020 ↗
8 inchx4 inch pvc wyeeach7$450.00$275.00$275.00 – $715.00Mar 17, 2026, Open bid tab, ST-013 ↗
Subgrade Preparationsquare yard7$1.40$2.00$0.5 – $2.00Apr 10, 2026, Open bid tab, ST-020 ↗
Site Restorationeach7$600.00$600.00$571.00 – $1,500Apr 21, 2026, Open bid tab, ST-002 2026 ↗
6 inch gate valve & boxeach6$3,000$600.00$600.00 – $4,500Apr 10, 2026, Open bid tab, ST-020 ↗
4 inch perf pvc pipe drainlinear foot6$12.75$8.00$8.00 – $15.00Apr 10, 2026, Open bid tab, ST-020 ↗
8 inch pvc water mainlinear foot6$65.00$58.00$49.00 – $100.00Feb 12, 2025, Open bid tab, ST-012-2025 ↗
Remove Manholeeach6$500.00$450.00$350.00 – $1,100Apr 10, 2026, Open bid tab, ST-020 ↗
Adjust Gate Valve BOXeach6$362.50$350.00$75.00 – $450.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Asphalt material for tack coatgallon6$3.37$4.00$3.00 – $4.50Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Type Sp 9.5 Wearing Course Mix (3,B)ton6$87.06$81.00$81.00 – $225.00Apr 21, 2026, Open bid tab, ST-002 2026 ↗
Remove Catch Basineach6$425.00$250.00$250.00 – $501.75Apr 10, 2026, Open bid tab, ST-020 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Minnesota: statewide figures.