| Maintaining Traffic | ls | 14 | — | $30,000 | $1,280 – $30,000 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Removed, As Per Plan | ls | 13 | $5,000 | $5,000 | $500.00 – $17,500 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 11 | $5,564 | $6,000 | $975.00 – $10,000 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 10 | $10,028 | $5,000 | $500.00 – $27,600 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 9 | $4.00 | $4.00 | $1.00 – $10.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Walk Removed | square foot | 8 | $4.00 | $3.00 | $0.1 – $10.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Curb Removed | linear foot | 7 | $9.11 | $20.00 | $5.00 – $50.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Remove of ground mounted sign and reerection | each | 7 | $50.00 | $250.00 | $20.00 – $250.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Curb And Gutter Removed | linear foot | 7 | $10.00 | $20.00 | $1.00 – $75.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Mobilization | ls | 7 | — | $23,220 | $1,200 – $40,000 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |
| 7 inch non-reinforced concrete pavement, as per plan | square yard | 6 | $102.50 | $95.00 | $94.00 – $177.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Type 6 Barrier Curb, As Per Plan | linear foot | 6 | $32.50 | $28.00 | $28.00 – $37.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Pipe removed, 24 inch and under | linear foot | 6 | $30.00 | $30.00 | $10.00 – $44.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 6 | $24.90 | $55.00 | $4.00 – $55.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 6 | $20.66 | $45.00 | $3.00 – $45.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 6 | $15.00 | $35.00 | $3.00 – $35.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 6 | $74.00 | $95.00 | $40.00 – $95.00 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 6 | $2.50 | $4.00 | $1.00 – $5.00 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |
| 5 inch concrete walk, as per plan | square foot | 5 | $10.00 | $10.00 | $10.00 – $11.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair, as per plan | linear foot | 5 | $10.00 | $10.00 | $5.00 – $46.55 | Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗ |
| Remove of ground mounted post support and reerection | each | 5 | $75.00 | $50.00 | $20.00 – $294.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Valve Box Removed | each | 5 | $225.00 | $250.00 | $5.00 – $250.00 | Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗ |
| Type 1 Catch Basin, As Per Plan | each | 5 | $2,800 | $2,500 | $1,850 – $3,250 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Aggregate Base | cubic yard | 5 | $90.00 | $90.00 | $60.00 – $131.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Embankment | cubic yard | 5 | $35.00 | $25.00 | $20.00 – $70.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| 3/4 inch water service branch, as per plan | linear foot | 4 | — | $95.00 | $10.00 – $95.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Curb And Gutter Replaced (In-Kind) | linear foot | 4 | — | $60.00 | $40.00 – $60.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| 12 inch storm sewer, as per plan | linear foot | 4 | — | $130.00 | $41.00 – $140.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Curb Ramp | square foot | 4 | — | $27.00 | $15.00 – $27.00 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |
| Stop Line | linear foot | 4 | — | $15.00 | $2.00 – $26.00 | Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗ |
| Ground Mounted Support, No. 3 Post | linear foot | 4 | — | $45.00 | $11.00 – $45.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 4 | — | $60.00 | $40.50 – $75.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 4 | — | $35.00 | $10.50 – $44.00 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Excavation | cubic yard | 4 | — | $25.00 | $10.00 – $70.00 | Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗ |
| Cut, Plug And Abandon, As Per Plan | each | 3 | — | $1,500 | $300.00 – $1,800 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| 8 inchx8 inch tapping sleeve and valve | each | 3 | — | $3,500 | $3,500 – $5,200 | Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗ |
| 5 inch concrete walk | square foot | 3 | — | $14.00 | $5.00 – $14.00 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |
| 18 inch storm sewer, as per plan | linear foot | 3 | — | $382.00 | $62.00 – $382.00 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |
| Yard Drain, As Per Plan | each | 3 | — | $1,500 | $1,500 – $2,500 | Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗ |
| Type 2-2B Catch Basin, As Per Plan | each | 3 | — | $2,200 | $1,850 – $2,200 | Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗ |