594 winning bid prices read from 14 source documents, 2019–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Loveland

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Maintaining Trafficls14—$30,000$1,280 – $30,000Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Removed, As Per Planls13$5,000$5,000$500.00 – $17,500Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Construction Layout Stakes And Surveying, As Per Planls11$5,564$6,000$975.00 – $10,000Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Clearing And Grubbing, As Per Planls10$10,028$5,000$500.00 – $27,600Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Seeding And Mulching, Class 1, As Per Plansquare yard9$4.00$4.00$1.00 – $10.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Walk Removedsquare foot8$4.00$3.00$0.1 – $10.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Curb Removedlinear foot7$9.11$20.00$5.00 – $50.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Remove of ground mounted sign and reerectioneach7$50.00$250.00$20.00 – $250.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Curb And Gutter Removedlinear foot7$10.00$20.00$1.00 – $75.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Mobilizationls7—$23,220$1,200 – $40,000Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗
7 inch non-reinforced concrete pavement, as per plansquare yard6$102.50$95.00$94.00 – $177.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Type 6 Barrier Curb, As Per Planlinear foot6$32.50$28.00$28.00 – $37.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Pipe removed, 24 inch and underlinear foot6$30.00$30.00$10.00 – $44.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
8 inch conduit, type b, 707.45, storm repairlinear foot6$24.90$55.00$4.00 – $55.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot6$20.66$45.00$3.00 – $45.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot6$15.00$35.00$3.00 – $35.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Aggregate Base, As Per Plancubic yard6$74.00$95.00$40.00 – $95.00Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗
Subgrade Compaction, As Per Plansquare yard6$2.50$4.00$1.00 – $5.00Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗
5 inch concrete walk, as per plansquare foot5$10.00$10.00$10.00 – $11.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
6 inch conduit, type b, 707.45, storm repair, as per planlinear foot5$10.00$10.00$5.00 – $46.55Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗
Remove of ground mounted post support and reerectioneach5$75.00$50.00$20.00 – $294.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Valve Box Removedeach5$225.00$250.00$5.00 – $250.00Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗
Type 1 Catch Basin, As Per Planeach5$2,800$2,500$1,850 – $3,250Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Aggregate Basecubic yard5$90.00$90.00$60.00 – $131.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Embankmentcubic yard5$35.00$25.00$20.00 – $70.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
3/4 inch water service branch, as per planlinear foot4—$95.00$10.00 – $95.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Curb And Gutter Replaced (In-Kind)linear foot4—$60.00$40.00 – $60.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
12 inch storm sewer, as per planlinear foot4—$130.00$41.00 – $140.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Curb Rampsquare foot4—$27.00$15.00 – $27.00Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗
Stop Linelinear foot4—$15.00$2.00 – $26.00Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗
Ground Mounted Support, No. 3 Postlinear foot4—$45.00$11.00 – $45.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Stabilized Crushed Aggregatecubic yard4—$60.00$40.50 – $75.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Non-Tracking Tack Coat, 0.06 Gal/S.Y.gallon4—$35.00$10.50 – $44.00Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Excavationcubic yard4—$25.00$10.00 – $70.00Apr 9, 2026, Open bid tab, bidtabclelov2510pdf ↗
Cut, Plug And Abandon, As Per Planeach3—$1,500$300.00 – $1,800Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
8 inchx8 inch tapping sleeve and valveeach3—$3,500$3,500 – $5,200Mar 26, 2024, Open bid tab, bidtabclelov2315pdf ↗
5 inch concrete walksquare foot3—$14.00$5.00 – $14.00Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗
18 inch storm sewer, as per planlinear foot3—$382.00$62.00 – $382.00Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗
Yard Drain, As Per Planeach3—$1,500$1,500 – $2,500Apr 29, 2025, Open bid tab, bidtabclelov2403pdf ↗
Type 2-2B Catch Basin, As Per Planeach3—$2,200$1,850 – $2,200Jul 21, 2023, Open bid tab, bidtabclelov2301pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.