| Removed, As Per Plan | ls | 6 | $10,000 | $10,000 | $2,500 – $26,300 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 5 | — | $2.00 | $2.00 – $23.50 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| Maintaining Traffic | ls | 5 | $15,000 | $18,500 | $1,000 – $30,000 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| Aggregate Base | cubic yard | 5 | $38.78 | $47.50 | $30.00 – $50.00 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| 6 inch fire hydrant assembly, as per plan | each | 4 | — | $7,750 | $5,320 – $9,356 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| 8 inch gate valve | each | 4 | — | $2,600 | $1,700 – $3,269 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| 3/4 inch type k copper water service branch, as per plan | linear foot | 3 | — | $75.00 | $75.00 – $78.51 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| Non-Tracking Tack Coat, 0.10 Gal/S.Y. | gallon | 3 | — | $3.00 | $3.00 – $8.17 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Cut And Plug, As Per Plan | each | 3 | — | $724.00 | $724.00 – $3,500 | Apr 6, 2023, Open bid tab, bidtabharken2105pdf-s0 ↗ |
| Valve Box Removed | each | 3 | — | $109.00 | $50.00 – $450.00 | Apr 6, 2023, Open bid tab, bidtabharken2105pdf-s1 ↗ |
| Clearing and Grubbing | ls | 3 | — | $1,000 | $1,000 – $6,000 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| 3/4 inch curb stop valve and valve box | each | 2 | — | $666.82 | $650.00 – $666.82 | Apr 6, 2023, Open bid tab, bidtabharken2105pdf-s0 ↗ |
| Manhole Removed | each | 2 | — | $1,750 | $200.00 – $1,750 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Asphalt Concrete Intermediate Course, Type 2, (449) | cubic yard | 2 | — | $325.00 | $245.00 – $325.00 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| Concrete Walk, In Kind | square foot | 2 | — | $18.66 | $18.66 – $30.00 | Apr 6, 2023, Open bid tab, bidtabharken2105pdf-s0 ↗ |
| Sanitary Sewer Lateral Repair, As Per Plan | linear foot | 2 | — | $120.00 | $26.64 – $120.00 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| 10 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $48.95 | $45.00 – $48.95 | Apr 6, 2023, Open bid tab, bidtabharken2105pdf-s0 ↗ |
| Fire Hydrant Removed | each | 2 | — | $350.00 | $350.00 – $1,000 | Nov 26, 2025, Open bid tab, bidtabharken2310pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 2 | — | $37.08 | $30.00 – $37.08 | Apr 6, 2023, Open bid tab, bidtabharken2105pdf-s0 ↗ |
| Curb Ramp | square foot | 2 | — | $19.00 | $18.00 – $19.00 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 2 | — | $36.00 | $36.00 – $40.00 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| 1 inch private water service branch, as per plan | linear foot | 1 | — | $90.00 | $90.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| Curb Replaced, In-Kind (Outside Of R/W) | linear foot | 1 | — | $50.00 | $50.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| 4 inch concrete walk (outside of r/w) | square foot | 1 | — | $20.00 | $20.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| Fence, Remove And Replace, In Kind | linear foot | 1 | — | $5.00 | $5.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| Fence, Rebuilt, Type Brick | linear foot | 1 | — | $100.00 | $100.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| 2-1/2 inch asphalt concrete intermediate course, 19mm, type a, (449) | cubic yard | 1 | — | $500.00 | $500.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| 1-1/2 inch asphalt concrete surface course, 12.5mm, type a, (449) | cubic yard | 1 | — | $600.00 | $600.00 | Mar 6, 2025, Open bid tab, bidtabharken2501pdf ↗ |
| Railroad Crossing ($40,000 Allowance) | ls | 1 | — | $40,000 | $40,000 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| 12 inch steel casing pipe install by jack and bore | linear foot | 1 | — | $1,000 | $1,000 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Plug and fill existing 24 inch sanitary sewer | linear foot | 1 | — | $30.00 | $30.00 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Cut And Plug Existing Sanitary Sewer, As Per Plan | each | 1 | — | $1,675 | $1,675 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Restore existing pavement marking in-kind | ls | 1 | — | $2,000 | $2,000 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Remove of temporary pavement marking | linear foot | 1 | — | $4.00 | $4.00 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Stop Line (Replace Removals) | linear foot | 1 | — | $20.00 | $20.00 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Center Line (Replace Removals) | mile | 1 | — | $11,000 | $11,000 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| Temporary line stop, as per plan (6 inch) | ls | 1 | — | $9,600 | $9,600 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| 6 inchx6 inch solid sleeve adapter with mechanical joint fitting | each | 1 | — | $2,700 | $2,700 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| 12 inch gate valve and valve box assembly | each | 1 | — | $4,750 | $4,750 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |
| 12 inch tee with mechanical joint fitting | each | 1 | — | $2,000 | $2,000 | Nov 20, 2025, Open bid tab, bidtabharken2405pdf ↗ |