| 8 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $25.00 | $4.00 – $25.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $19.00 | $3.00 – $19.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 3 | — | $15.00 | $2.00 – $15.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Sanitary Manhole Reconstructed To Grade | each | 2 | — | $2,000 | $800.00 – $2,000 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Pavement milling, asphalt concrete | square yard | 2 | — | $8.00 | $2.50 – $8.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Combination Curb And Gutter, Type 2 | linear foot | 2 | — | $36.00 | $20.00 – $36.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Remove of ground mounted sign and disposal | each | 2 | — | $50.00 | $50.00 – $75.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Sign, Flat Sheet | square foot | 2 | — | $30.00 | $25.00 – $30.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Non-Tracking Tack Coat | gallon | 2 | — | $15.00 | $6.50 – $15.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Catch Basin Removed | each | 2 | — | $400.00 | $400.00 – $450.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| 1 inch water service branch, as per plan | linear foot | 2 | — | $215.00 | $100.00 – $215.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 4 inch concrete walk | square foot | 2 | — | $8.00 | $5.00 – $8.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Erosion Control | each | 2 | — | $1.00 | $1.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Low Strength Mortar Backfill | cubic yard | 2 | — | $140.00 | $140.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Subgrade Compaction | square yard | 2 | — | $1.00 | $1.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Lane Arrow | each | 2 | — | $100.00 | $100.00 – $105.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Channelizing line, 8 inch | linear foot | 2 | — | $2.00 | $1.80 – $2.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Center Line | mile | 2 | — | $12,000 | $4,500 – $12,000 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Power Service, As Per Plan | each | 2 | — | $800.00 | $800.00 – $9,000 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Remove of ground mounted sign and reerection | each | 2 | — | $125.00 | $125.00 – $150.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Ground Mounted Support, No. 3 Post | linear foot | 2 | — | $20.00 | $11.00 – $20.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Ground Rod | each | 2 | — | $300.00 | $60.00 – $300.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Conduit, 2 inch, 725.051, as per plan | linear foot | 2 | — | $35.00 | $12.00 – $35.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Maintaining Traffic | ls | 2 | — | $11,936 | $11,936 – $15,000 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 2 | — | $64.00 | $30.00 – $64.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Geogrid, As Per Plan | square yard | 2 | — | $3.00 | $3.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Walk Removed | square foot | 2 | — | $1.00 | $1.00 – $2.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Removed, As Per Plan | ls | 2 | — | $26,185 | $20,000 – $26,185 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Aggregate Base | cubic yard | 2 | — | $50.00 | $34.00 – $50.00 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Mobilization | ls | 2 | — | $15,000 | $15,000 – $20,416 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Clearing and Grubbing | ls | 2 | — | $5,000 | $5,000 | Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗ |
| Allowance For Material Surcharge | allow | 1 | — | $300,000 | $300,000 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Railroad Associated Cost For Flagman, Right-Of-Entry, Insurance & Other Unknowns | allow | 1 | — | $12,000 | $12,000 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Erosion Control Mat, Type B | square yard | 1 | — | $7.00 | $7.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Seeding And Muching, Class 1, As Per Plan | square yard | 1 | — | $2.20 | $2.20 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| Stop line, 24 inch | linear foot | 1 | — | $35.00 | $35.00 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 6 inch double yellow centerline | mile | 1 | — | $22,000 | $22,000 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 6 inch edge line | mile | 1 | — | $16,500 | $16,500 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 30 inch and 16 inch line stop w/ bypass, complete, as per plan | ls | 1 | — | $71,250 | $71,250 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |
| 12 inch line stop, as per plan | each | 1 | — | $11,500 | $11,500 | Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗ |