Skip to content
Hubstake

Agency · awarded bid prices

City of Greenville: awarded unit prices

295 winning bid prices read from 3 source documents, 2020–2022. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › City of Greenville

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
8 inch conduit, type b, 707.45, storm repairlinear foot3—$25.00$4.00 – $25.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
6 inch conduit, type b, 707.45, storm repairlinear foot3—$19.00$3.00 – $19.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
4 inch conduit, type b, 707.45, storm repairlinear foot3—$15.00$2.00 – $15.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Sanitary Manhole Reconstructed To Gradeeach2—$2,000$800.00 – $2,000Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Pavement milling, asphalt concretesquare yard2—$8.00$2.50 – $8.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Combination Curb And Gutter, Type 2linear foot2—$36.00$20.00 – $36.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Remove of ground mounted sign and disposaleach2—$50.00$50.00 – $75.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Sign, Flat Sheetsquare foot2—$30.00$25.00 – $30.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Non-Tracking Tack Coatgallon2—$15.00$6.50 – $15.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Catch Basin Removedeach2—$400.00$400.00 – $450.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
1 inch water service branch, as per planlinear foot2—$215.00$100.00 – $215.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
4 inch concrete walksquare foot2—$8.00$5.00 – $8.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Erosion Controleach2—$1.00$1.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Low Strength Mortar Backfillcubic yard2—$140.00$140.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Subgrade Compactionsquare yard2—$1.00$1.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Lane Arroweach2—$100.00$100.00 – $105.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Channelizing line, 8 inchlinear foot2—$2.00$1.80 – $2.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Center Linemile2—$12,000$4,500 – $12,000Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Power Service, As Per Planeach2—$800.00$800.00 – $9,000Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Remove of ground mounted sign and reerectioneach2—$125.00$125.00 – $150.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Ground Mounted Support, No. 3 Postlinear foot2—$20.00$11.00 – $20.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Ground Rodeach2—$300.00$60.00 – $300.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Conduit, 2 inch, 725.051, as per planlinear foot2—$35.00$12.00 – $35.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Maintaining Trafficls2—$11,936$11,936 – $15,000Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Stabilized Crushed Aggregatecubic yard2—$64.00$30.00 – $64.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Geogrid, As Per Plansquare yard2—$3.00$3.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Walk Removedsquare foot2—$1.00$1.00 – $2.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Removed, As Per Planls2—$26,185$20,000 – $26,185Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Aggregate Basecubic yard2—$50.00$34.00 – $50.00Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Mobilizationls2—$15,000$15,000 – $20,416Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Clearing and Grubbingls2—$5,000$5,000Sep 29, 2022, Open bid tab, bidtabdargre1909pdf ↗
Allowance For Material Surchargeallow1—$300,000$300,000Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Railroad Associated Cost For Flagman, Right-Of-Entry, Insurance & Other Unknownsallow1—$12,000$12,000Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Erosion Control Mat, Type Bsquare yard1—$7.00$7.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Seeding And Muching, Class 1, As Per Plansquare yard1—$2.20$2.20Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
Stop line, 24 inchlinear foot1—$35.00$35.00Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
6 inch double yellow centerlinemile1—$22,000$22,000Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
6 inch edge linemile1—$16,500$16,500Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
30 inch and 16 inch line stop w/ bypass, complete, as per planls1—$71,250$71,250Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗
12 inch line stop, as per planeach1—$11,500$11,500Oct 6, 2022, Open bid tab, bidtabdargre2201pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.