| Contingency/Discretionary Allowance | ls | 8 | — | $80,000 | $4,000 – $161,000 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Bonds And Insurances, As Per Plan | ls | 7 | $5,850 | $2,500 | $2,500 – $20,000 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Maintaining Traffic, As Per Plan | ls | 7 | $15,000 | $23,000 | $500.00 – $46,000 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Mobilization | ls | 7 | $25,000 | $30,000 | $500.00 – $74,400 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Special - Miscellaneous Metal | pound | 6 | $1.15 | $2.00 | $0.8 – $2.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Valve Box Adjusted To Grade, As Per Plan | each | 6 | — | $500.00 | $50.00 – $800.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| MANHOLE ADJUSTED TO GRADE, METHOD D.1 (brick), AS PER PLAN | each | 6 | $900.00 | $1,100 | $100.00 – $1,100 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Geotextile Fabric, As Per Plan | square yard | 5 | $1.00 | $2.00 | $1.00 – $2.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Full deep pavement remove and rigid replace, class qc ms, t=8 inch, as per plan | square yard | 4 | — | $130.00 | $69.00 – $130.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| CATCH BASIN ADJUSTED TO GRADE, METHOD D.1 (brick), AS PER PLAN | each | 4 | — | $1,200 | $300.00 – $1,400 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Preconstruction Video Documentation, As Per Plan | ls | 4 | — | $500.00 | $500.00 – $3,000 | Sep 28, 2021, Open bid tab, 210747 ↗ |
| Temporary Sediment And Erosion Control, As Per Plan | ls | 4 | — | $5,000 | $300.00 – $5,000 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Preconstruction Video Documentation | ls | 4 | — | $500.00 | $500.00 – $762.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Tack Coat, Trackless Tack | gallon | 4 | — | $2.50 | $2.50 – $4.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Special - Void Reducing Asphalt Membrane (Vram) | linear foot | 3 | — | $3.50 | $1.90 – $3.50 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| CATCH BASIN, DOUBLE, ADJUSTED TO GRADE, METHOD D.1 (brick), AS PER PLAN | each | 3 | — | $50.00 | $50.00 – $800.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Excavation Of Subgrade And Embankment With Granular Material, Ccs, As Per Plan, Contingency | cubic yard | 3 | — | $52.00 | $40.00 – $52.00 | Apr 5, 2024, Open bid tab, 232525 ↗ |
| Lawn Restoration Incl. Lineal Grading & Topsoil, As Per Plan | ls | 3 | — | $7,000 | $1,000 – $18,000 | Apr 5, 2024, Open bid tab, 232528 ↗ |
| Asphalt Concrete Intermediate Course, Type 1, (448), As Per Plan | cubic yard | 3 | — | $200.00 | $165.00 – $200.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Curb, type 6, including remove, as per plan | linear foot | 3 | — | $70.00 | $15.00 – $70.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Stop Line | linear foot | 3 | — | $31.00 | $19.00 – $50.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Clearing and Grubbing | ls | 3 | — | $1,000 | $1,000 – $18,500 | Sep 28, 2021, Open bid tab, 210747 ↗ |
| Loop detector replace | each | 2 | — | $1,600 | $1,300 – $1,600 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Monument Assembly Adjusted To Grade | each | 2 | — | $500.00 | $400.00 – $500.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Portable Changeable Message Sign, As Per Plan | each | 2 | — | $900.00 | $900.00 – $1,200 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| 4 Inch Unclassified Pipe Underdrains, With Geotextile Fabric, As Per Plan | linear foot | 2 | — | $10.00 | $10.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg 70-22M, As Per Plan | cubic yard | 2 | — | $225.00 | $225.00 – $230.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Special - Asphalt Preservative Seal | square yard | 2 | — | $1.35 | $1.22 – $1.35 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Partial deep pavement joint repair, as per plan | cubic yard | 2 | — | $1,000 | $350.00 – $1,000 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Geotextile Fabric, 712.09 Type B | square yard | 2 | — | $5.00 | $4.00 – $5.00 | Sep 28, 2021, Open bid tab, 210747 ↗ |
| Dumped Rock Fill, Type C, As Per Plan | cubic yard | 2 | — | $100.00 | $95.00 – $100.00 | Sep 28, 2021, Open bid tab, 210747 ↗ |
| Dumped Rock Fill, Type B, As Per Plan | cubic yard | 2 | — | $100.00 | $100.00 | Sep 28, 2021, Open bid tab, 210747 ↗ |
| Armor Stone, As Per Plan | cubic yard | 2 | — | $140.00 | $120.00 – $140.00 | Sep 28, 2021, Open bid tab, 210747 ↗ |
| Excavation Of Subgrade And Embankment With Granular Material, Ccs, As Per Plan, Contin | cubic yard | 2 | — | $50.00 | $50.00 – $100.00 | Aug 22, 2025, Open bid tab, 0000034541 ↗ |
| Special - Gas Valve Box Adjusted To Grade | each | 2 | — | $50.00 | $50.00 – $300.00 | Apr 5, 2024, Open bid tab, 232528 ↗ |
| Special - concrete seal surface treatment, sinak, as per plan | square yard | 2 | — | $5.00 | $3.50 – $5.00 | Apr 5, 2024, Open bid tab, 232528 ↗ |
| Excavation and remove of existing pavement, curb, & base, as per plan | ls | 2 | — | $24,000 | $24,000 – $110,000 | Apr 5, 2024, Open bid tab, 232528 ↗ |
| 4 inch concrete walk, including remove, as per plan | square foot | 2 | — | $8.00 | $5.00 – $8.00 | Apr 5, 2024, Open bid tab, 232528 ↗ |
| Curb Ramp, As Per Plan - Additional Labor For Forming/Pouring And Truncated Dome Plat | each | 2 | — | $125.00 | $125.00 – $200.00 | Apr 5, 2024, Open bid tab, 232528 ↗ |
| Traffic Paint, As Per Plan | ls | 2 | — | $7,000 | $2,500 – $7,000 | Sep 23, 2022, Open bid tab, 200598 ↗ |