| Pavement Marking, As Per Plan | ls | 1 | — | $5,500 | $5,500 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box - Hydrant, Valve, An | each | 1 | — | $8,908 | $8,908 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 12 Inch Inserting Valve And Valve Box | each | 1 | — | $20,900 | $20,900 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 1 Inch Curb Stop And Valve Box, As Per Plan | each | 1 | — | $4,177 | $4,177 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 12 Inch Water Main, As Per Plan | linear foot | 1 | — | $171.51 | $171.51 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Connect New Water Main To Existing Water Main W/O Tapping Sleeve Or Cut-In-Tee, As Per | each | 1 | — | $13,462 | $13,462 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Abandon existing water main, up to 12 inch, as per plan | linear foot | 1 | — | $3.48 | $3.48 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Remove of pole mounted sign and disposal | each | 1 | — | $55.00 | $55.00 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Manhole, Misc.: Connection To Existing Manhole | each | 1 | — | $1,373 | $1,373 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 6 inch curb ramp, including remove, as per plan | square foot | 1 | — | $27.93 | $27.93 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Asphalt pavement replace, roadway, as per plan | square yard | 1 | — | $46.90 | $46.90 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Sanitary Sewer Abandoned, Grout Filled, As Per Plan | linear foot | 1 | — | $11.77 | $11.77 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 6 inch sanitary sewer lateral replace, as per plan | each | 1 | — | $7,082 | $7,082 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Storm Sewer Abandoned, Grout Filled, As Per Plan | linear foot | 1 | — | $15.64 | $15.64 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 1 Inch Copper Service Branch | linear foot | 1 | — | $59.35 | $59.35 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Concrete walk, including remove, as per plan | square foot | 1 | — | $11.40 | $11.40 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 12 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $4,651 | $4,651 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 6 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $2,071 | $2,071 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Conduit, Misc.: Concrete Encasement - Single Conduit | cubic yard | 1 | — | $510.00 | $510.00 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Curb, type 6, including remove, as per plan | linear foot | 1 | — | $41.65 | $41.65 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Temporary Sediment And Erosion Control, As Per Plan | ls | 1 | — | $4,500 | $4,500 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Utility Company Charges Allowance | ls | 1 | — | $20,000 | $20,000 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Tree Removed Including Stump, As Per Plan | each | 1 | — | $2,200 | $2,200 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Seeding And Mulching, As Per Plan | ls | 1 | — | $18,000 | $18,000 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Sign, Flat Sheet, With Mounting Post | each | 1 | — | $632.50 | $632.50 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Concrete apron or drive replace, as per plan | square yard | 1 | — | $138.68 | $138.68 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Bonds And Insurances, As Per Plan | ls | 1 | — | $13,000 | $13,000 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Catch Basin, No. 3A | each | 1 | — | $4,168 | $4,168 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 6 Inch Water Main, As Per Plan | linear foot | 1 | — | $226.11 | $226.11 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 18 inch storm sewer, as per plan | linear foot | 1 | — | $232.24 | $232.24 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 10 inch sanitary sewer, as per plan | linear foot | 1 | — | $169.17 | $169.17 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Manhole, No. 3 | each | 1 | — | $4,202 | $4,202 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Catch Basin, No. 2-2B | each | 1 | — | $2,907 | $2,907 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Stormwater Pollution Prevention Plan | ls | 1 | — | $4,950 | $4,950 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Catch Basin Removed | each | 1 | — | $500.00 | $500.00 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Construction Layout Stakes And Surveying, As Per Plan | ls | 1 | — | $17,732 | $17,732 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Valve Box Removed | each | 1 | — | $300.00 | $300.00 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| 15 inch storm sewer, as per plan | linear foot | 1 | — | $203.99 | $203.99 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Maintaining Traffic | ls | 1 | — | $16,050 | $16,050 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |
| Subgrade Compaction, As Per Plan | square yard | 1 | — | $1.00 | $1.00 | Dec 12, 2025, Open bid tab, 0000036620 ↗ |