| Special - Asbestos Abatement | ls | 1 | — | $7,000 | $7,000 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Slope Erosion Protection Mat, Type B | square yard | 1 | — | $2.00 | $2.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Pruning Existing Tree, 8 To 16-Inch Diameter | each | 1 | — | $150.00 | $150.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Seeding And Mulching, Class 3B, As Per Plan | square yard | 1 | — | $6.00 | $6.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Conduit, Misc.: Valve Vault Piping Retrofit | ls | 1 | — | $6,600 | $6,600 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| 4 inch conduit, type b, type 1, as per plan | linear foot | 1 | — | $165.00 | $165.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Curb, Type 2-B, As Per Plan | linear foot | 1 | — | $65.00 | $65.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Fence, type class, as per plan | linear foot | 1 | — | $106.00 | $106.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Rounded End Section | each | 1 | — | $1,605 | $1,605 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Guardrail, Type Mgs, As Per Plan | linear foot | 1 | — | $98.00 | $98.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| 6 Inch Unclassified Pipe Underdrain | linear foot | 1 | — | $18.00 | $18.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Approach Slab Removed, As Per Plan | square yard | 1 | — | $18.00 | $18.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Portions Of Structure Removed, Over 20 Foot Span, As Per Plan | ls | 1 | — | $94,000 | $94,000 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| General Construction | ls | 1 | — | $603,900 | $603,900 | Oct 1, 2025, Open bid tab, 0000034041 ↗ |
| Preconstruction Video Documentation, As Per Plan | ls | 1 | — | $650.00 | $650.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Dowel Holes With Non-Shrink, Non-Metalic Grout | each | 1 | — | $25.00 | $25.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Bonds And Insurances, As Per Plan | ls | 1 | — | $2,200 | $2,200 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Full deep pavement sawing | linear foot | 1 | — | $4.00 | $4.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Erosion Control, As Per Plan | each | 1 | — | $1.00 | $1.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Repair Seeding And Mulching | square yard | 1 | — | $1.00 | $1.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Pavement Repair, As Per Plan | square yard | 1 | — | $164.00 | $164.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Manhole Adjusted To Grade, As Per Plan | each | 1 | — | $800.00 | $800.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Pavement Removed | square yard | 1 | — | $14.00 | $14.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Topsoil, As Per Plan | cubic yard | 1 | — | $80.00 | $80.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $2,600 | $2,600 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Detour Signing | ls | 1 | — | $5,000 | $5,000 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Pipe removed, 24 inch and under | linear foot | 1 | — | $5.00 | $5.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 1 | — | $6.00 | $6.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| 4 inch concrete walk | square foot | 1 | — | $7.00 | $7.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Curb Removed | linear foot | 1 | — | $5.00 | $5.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Maintaining Traffic | ls | 1 | — | $5,000 | $5,000 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Walk Removed | square foot | 1 | — | $0.75 | $0.75 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Aggregate Base | cubic yard | 1 | — | $100.00 | $100.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Embankment | cubic yard | 1 | — | $25.00 | $25.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Water | thousand gallons | 1 | — | $5.00 | $5.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Topsoil | cubic yard | 1 | — | $50.00 | $50.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Mobilization | ls | 1 | — | $10,000 | $10,000 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Epoxy coated reinforced steel | pound | 1 | — | $10.00 | $10.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |
| Excavation | cubic yard | 1 | — | $20.00 | $20.00 | Oct 22, 2021, Open bid tab, 180953 ↗ |