| Traffic Control | ls | 13 | — | $1.00 | $1.00 – $49,000 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Rolled Erosion Prevention Category 20 | square yard | 12 | $1.84 | $2.80 | $1.40 – $4.54 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Excavation Common **P** | cubic yard | 12 | $8.68 | $28.50 | $4.20 – $28.50 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Common Embankment (Cv) (P) | cubic yard | 11 | $9.95 | $21.50 | $1.00 – $26.25 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Mobilization | ls | 11 | — | $1,725,000 | $10,101 – $1,725,000 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Remove asphalt pavement | square yard | 9 | $5.00 | $5.83 | $1.20 – $10.50 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Silt Fence, Type MS | linear foot | 9 | $2.35 | $4.00 | $2.00 – $4.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Stabilized Construction Exit | ls | 8 | $1,171 | $8,000 | $525.00 – $8,000 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Flotation Silt Curtain Type Moving Water | linear foot | 7 | $21.00 | $28.00 | $15.00 – $35.70 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Remove pipe culvert | linear foot | 7 | $8.00 | $40.00 | $5.00 – $40.00 | Apr 29, 2026, Open bid tab, 267052 ↗ |
| Casting Assembly | each | 7 | $1,166 | $1,102 | $708.75 – $1,343 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Turf Establishment | ls | 7 | $2,128 | $2,158 | $1,500 – $4,400 | Feb 11, 2026, Open bid tab, 260226 ↗ |
| Random Riprap Class III | cubic yard | 7 | $76.65 | $93.50 | $15.20 – $100.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Storm Drain Inlet Protection | each | 7 | $165.00 | $200.00 | $90.00 – $200.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Grubbing | acre | 7 | $10,750 | $1,250 | $1,250 – $19,688 | Apr 29, 2026, Open bid tab, 267052 ↗ |
| 18 inch cs pipe culvert | linear foot | 6 | $57.00 | $71.70 | $35.00 – $78.00 | Apr 1, 2026, Open bid tab, 265691 ↗ |
| Remove Existing Bridge | ls | 6 | $34,000 | $6,300 | $6,300 – $165,000 | Feb 11, 2026, Open bid tab, 260226 ↗ |
| Fertilizer Type 3 | pound | 6 | $1.00 | $1.50 | $0.82 – $1.50 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Rapid Stabilization Method 3 | thousand gallons | 6 | $475.00 | $450.00 | $367.50 – $650.00 | Apr 1, 2026, Open bid tab, 265691 ↗ |
| Sawing bit pavement (full deep) | linear foot | 6 | $3.81 | $2.63 | $2.00 – $8.40 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Structure Excavation | ls | 6 | — | $100,000 | $8,000 – $100,000 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Seeding | acre | 6 | — | $2,000 | $1.00 – $2,000 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Clearing | acre | 6 | $17,062 | $5,000 | $5,000 – $30,000 | Apr 29, 2026, Open bid tab, 267052 ↗ |
| Aggregate Surfacing Class 2 | ton | 5 | $30.00 | $29.85 | $28.81 – $42.00 | Apr 29, 2026, Open bid tab, 267052 ↗ |
| Soil Bed Preparation | acre | 5 | $200.00 | $850.00 | $1.00 – $850.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| 4 inch perf tp pipe drain | linear foot | 5 | $11.15 | $18.00 | $7.85 – $18.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Grubbing | each | 5 | $175.02 | $350.00 | $150.00 – $515.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Clearing | each | 5 | $300.00 | $800.00 | $150.00 – $1,550 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Connect to Existing Storm Sewer | each | 5 | $1,070 | $577.50 | $577.50 – $2,000 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Aggregate Base (Cv) Class 5 (P) | cubic yard | 5 | $29.00 | $60.00 | $16.98 – $60.00 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Random Riprap Class V | cubic yard | 4 | — | $94.00 | $80.00 – $96.75 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Granular Filter | cubic yard | 4 | — | $100.00 | $48.00 – $100.00 | Oct 15, 2025, Open bid tab, 252041 ↗ |
| Random Riprap Class IV | cubic yard | 4 | — | $84.95 | $76.65 – $96.75 | Apr 29, 2026, Open bid tab, 267052 ↗ |
| Sediment Control Log Type Straw | linear foot | 4 | — | $3.45 | $3.06 – $5.00 | Apr 1, 2026, Open bid tab, 265691 ↗ |
| Type Sp 12.5 Non Wear Course Mix (2,B) | ton | 4 | — | $79.95 | $76.60 – $100.80 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Drainage System Type (B910) | ls | 4 | — | $4,500 | $3,000 – $4,500 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Bridge Slab Concrete (3Yhpc-M) (P) | square foot | 4 | — | $43.00 | $42.00 – $55.55 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Reinforced bars (epoxy coated) (p) | pound | 4 | — | $1.62 | $1.26 – $1.62 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Structure concrete (3b52) (p) | cubic yard | 4 | — | $1,100 | $1,000 – $1,300 | Aug 26, 2026, Open bid tab, 262092 ↗ |
| Mail Box Support | each | 4 | — | $475.00 | $262.50 – $475.00 | Apr 29, 2026, Open bid tab, 267052 ↗ |