| Combination Curb And Gutter, Type 3, As Per Plan | linear foot | 1 | — | $38.00 | $38.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Asphalt Concrete Surface Course, 9.5 Mm, Type A (449) | cubic yard | 1 | — | $350.00 | $350.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $1,500 | $1,500 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Catch Basin Adjusted To Grade | each | 1 | — | $1,200 | $1,200 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Curb Removed | linear foot | 1 | — | $12.00 | $12.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Subgrade Compaction | square yard | 1 | — | $2.00 | $2.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Valve Box Adjusted To Grade | each | 1 | — | $850.00 | $850.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Maintaining Traffic | ls | 1 | — | $2,500 | $2,500 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Manhole Adjusted To Grade | each | 1 | — | $1,200 | $1,200 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Curb Ramp, As Per Plan | square foot | 1 | — | $30.00 | $30.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| 4 inch concrete walk, as per plan | square foot | 1 | — | $11.00 | $11.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Stabilized Crushed Aggregate | cubic yard | 1 | — | $65.00 | $65.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Non-Tracking Tack Coat, 0.06 Gal/S.Y. | gallon | 1 | — | $12.00 | $12.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 1 | — | $65.00 | $65.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Excavation, Including Embankment Construction, As Per Plan | cubic yard | 1 | — | $75.00 | $75.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Walk Removed | square foot | 1 | — | $5.00 | $5.00 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Removed, As Per Plan | ls | 1 | — | $6,500 | $6,500 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |
| Clearing and Grubbing | ls | 1 | — | $7,200 | $7,200 | Jul 25, 2024, Open bid tab, bidtabaugmin2402pdf ↗ |