Ashtabula Co. Bd. of Commissioners: awarded unit prices

108 winning bid prices read from 8 source documents, 2020–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Ashtabula Co. Bd. of Commissioners

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Connect New Water Main To Existing Water Main, As Per Planeach6$3,362$30,000$825.00 – $30,000Oct 3, 2025, Open bid tab, 200426 ↗
Type "c" pavement replace (asphalt), roadway, as per plansquare yard6$140.00$325.00$83.59 – $389.95Oct 3, 2025, Open bid tab, 200426 ↗
8 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per planlinear foot5$60.00$74.85$20.51 – $105.00Oct 3, 2025, Open bid tab, 241222 ↗
Type "c" pavement replace (asphalt), driveway, apron, or parking lot, as per plansquare yard5$130.00$216.26$72.00 – $216.26Oct 3, 2025, Open bid tab, 241222 ↗
Lawn Restoration (Grading, Seeding, & Mulching)ls5$12,000$39,910$900.00 – $39,910Oct 3, 2025, Open bid tab, 241222 ↗
Bonds And Insurances, As Per Planls5$25,000$45,000$5,400 – $60,000Oct 3, 2025, Open bid tab, 200426 ↗
6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, Type B, As Per Planeach4—$7,739$7,739 – $12,455Oct 3, 2025, Open bid tab, 241222 ↗
Preconstruction Video Documentationls4—$1,000$500.00 – $1,000Oct 3, 2025, Open bid tab, 200426 ↗
8 Inch Gate Valve and Valve Boxeach4—$2,838$2,838 – $4,000Oct 3, 2025, Open bid tab, 241222 ↗
Clearing And Grubbing, As Per Planls4—$5,000$500.00 – $5,000Oct 3, 2025, Open bid tab, 200426 ↗
Maintaining Trafficls4—$3,000$3,000 – $8,400Sep 5, 2024, Open bid tab, 232009 ↗
Mobilizationls4—$2.00$2.00 – $55,000Oct 3, 2025, Open bid tab, 200426 ↗
Type "a" pavement replace (concrete), driveway, apron, or parking lot, as per plansquare yard3—$200.00$108.00 – $200.00Sep 5, 2024, Open bid tab, 232009 ↗
Type "f" pavement replace (stone), driveway, apron, or parking lot, as per plansquare yard2—$16.75$16.75 – $24.59Oct 3, 2025, Open bid tab, 241222 ↗
Water Meter Vault, Water Meter And Backflow Preventor, As Per Planeach2—$6,750$6,750 – $11,000Sep 5, 2024, Open bid tab, 232009 ↗
2 Inch Curb Stop And Valve Box, As Per Planeach2—$1,475$1,475 – $4,000Sep 5, 2024, Open bid tab, 232009 ↗
2 Inch Corp Stop And Saddle, As Per Planeach2—$1,200$1,200 – $3,600Sep 5, 2024, Open bid tab, 232009 ↗
6 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per planlinear foot2—$55.43$26.45 – $55.43Oct 3, 2025, Open bid tab, 241222 ↗
2 inch water main polyvinyl chloride pipe and fitting, sdr-21, as per planlinear foot2—$19.00$19.00 – $100.00Sep 5, 2024, Open bid tab, 232009 ↗
Water Booster Stationeach2—$810,000$810,000Sep 5, 2024, Open bid tab, 232009 ↗
Fence, Chain Link, Galvanized, 8' Height, As Per Planlinear foot2—$122.00$122.00Sep 5, 2024, Open bid tab, 232009 ↗
6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, As Per Planeach2—$13,000$3,780 – $13,000Oct 3, 2025, Open bid tab, 200426 ↗
Contingency/Discretionary Allowancels2—$10,000$10,000 – $20,000May 29, 2020, Open bid tab, 20000101 ↗
12 Inch X 8 Inch Tapping Sleeve, Valve And Valve Boxeach2—$12,500$12,500Sep 5, 2024, Open bid tab, 232009 ↗
8 Inch X 8 Inch Tapping Sleeve, Valve And Valve Boxeach2—$12,000$12,000Sep 5, 2024, Open bid tab, 232009 ↗
6 Inch Gate Valve and Valve Boxeach2—$2,200$2,200 – $3,400Sep 5, 2024, Open bid tab, 232009 ↗
8 Inch Conduit Directionally Bored Without Casing, As Per Planlinear foot1—$125.24$125.24May 6, 2020, Open bid tab, 190709 ↗
8 Inch Gate Valve And Valve Box, As Per Planeach1—$1,308$1,308May 6, 2020, Open bid tab, 190709 ↗
General Constructionls1—$73,881$73,881May 29, 2020, Open bid tab, 20000101 ↗
Instrumentation And Control (Scada) System Integration Allowancels1—$15,000$15,000Oct 3, 2025, Open bid tab, 200426 ↗
Lawn Restoration, As Per Planls1—$7,500$7,500Oct 3, 2025, Open bid tab, 200426 ↗
12 inch water main ductile iron pipe ansi class 52, push-on joint and cast iron mechanicallinear foot1—$240.00$240.00Oct 3, 2025, Open bid tab, 200426 ↗
12 inch conduit, type a, as per planlinear foot1—$125.00$125.00Oct 3, 2025, Open bid tab, 200426 ↗
Double Gate, As Per Planeach1—$13,000$13,000Oct 3, 2025, Open bid tab, 200426 ↗
Rock Channel Protection, Type C With Fabric Filter, As Per Plancubic yard1—$700.00$700.00Oct 3, 2025, Open bid tab, 200426 ↗
General Construction, As Per Planls1—$3,250,000$3,250,000Oct 3, 2025, Open bid tab, 200426 ↗
Utility Company Coordination Allowancels1—$10,000$10,000Sep 5, 2024, Open bid tab, 232009 ↗
8 Inch Water Main Polyvinyl Chloride Pipe, Awwa C900 Pvc, As Per Planlinear foot1—$54.00$54.00Sep 5, 2024, Open bid tab, 232009 ↗
6 inch water main polyvinyl chloride pipe and fitting, awwa c900 pvc or c909 pvco, as per plinear foot1—$71.00$71.00Sep 5, 2024, Open bid tab, 232009 ↗
6 Inch Gate Valve And Valve Box, As Per Planeach1—$2,127$2,127Oct 3, 2025, Open bid tab, 241222 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.