| Connect New Water Main To Existing Water Main, As Per Plan | each | 6 | $3,362 | $30,000 | $825.00 – $30,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Type "c" pavement replace (asphalt), roadway, as per plan | square yard | 6 | $140.00 | $325.00 | $83.59 – $389.95 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| 8 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per plan | linear foot | 5 | $60.00 | $74.85 | $20.51 – $105.00 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| Type "c" pavement replace (asphalt), driveway, apron, or parking lot, as per plan | square yard | 5 | $130.00 | $216.26 | $72.00 – $216.26 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| Lawn Restoration (Grading, Seeding, & Mulching) | ls | 5 | $12,000 | $39,910 | $900.00 – $39,910 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| Bonds And Insurances, As Per Plan | ls | 5 | $25,000 | $45,000 | $5,400 – $60,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| 6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, Type B, As Per Plan | each | 4 | — | $7,739 | $7,739 – $12,455 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| Preconstruction Video Documentation | ls | 4 | — | $1,000 | $500.00 – $1,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| 8 Inch Gate Valve and Valve Box | each | 4 | — | $2,838 | $2,838 – $4,000 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| Clearing And Grubbing, As Per Plan | ls | 4 | — | $5,000 | $500.00 – $5,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Maintaining Traffic | ls | 4 | — | $3,000 | $3,000 – $8,400 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| Mobilization | ls | 4 | — | $2.00 | $2.00 – $55,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Type "a" pavement replace (concrete), driveway, apron, or parking lot, as per plan | square yard | 3 | — | $200.00 | $108.00 – $200.00 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| Type "f" pavement replace (stone), driveway, apron, or parking lot, as per plan | square yard | 2 | — | $16.75 | $16.75 – $24.59 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| Water Meter Vault, Water Meter And Backflow Preventor, As Per Plan | each | 2 | — | $6,750 | $6,750 – $11,000 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 2 Inch Curb Stop And Valve Box, As Per Plan | each | 2 | — | $1,475 | $1,475 – $4,000 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 2 Inch Corp Stop And Saddle, As Per Plan | each | 2 | — | $1,200 | $1,200 – $3,600 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 6 inch water main polyvinyl chloride pipe and fitting, awwa c909 pvco, as per plan | linear foot | 2 | — | $55.43 | $26.45 – $55.43 | Oct 3, 2025, Open bid tab, 241222 ↗ |
| 2 inch water main polyvinyl chloride pipe and fitting, sdr-21, as per plan | linear foot | 2 | — | $19.00 | $19.00 – $100.00 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| Water Booster Station | each | 2 | — | $810,000 | $810,000 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| Fence, Chain Link, Galvanized, 8' Height, As Per Plan | linear foot | 2 | — | $122.00 | $122.00 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, As Per Plan | each | 2 | — | $13,000 | $3,780 – $13,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Contingency/Discretionary Allowance | ls | 2 | — | $10,000 | $10,000 – $20,000 | May 29, 2020, Open bid tab, 20000101 ↗ |
| 12 Inch X 8 Inch Tapping Sleeve, Valve And Valve Box | each | 2 | — | $12,500 | $12,500 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 8 Inch X 8 Inch Tapping Sleeve, Valve And Valve Box | each | 2 | — | $12,000 | $12,000 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 6 Inch Gate Valve and Valve Box | each | 2 | — | $2,200 | $2,200 – $3,400 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 8 Inch Conduit Directionally Bored Without Casing, As Per Plan | linear foot | 1 | — | $125.24 | $125.24 | May 6, 2020, Open bid tab, 190709 ↗ |
| 8 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $1,308 | $1,308 | May 6, 2020, Open bid tab, 190709 ↗ |
| General Construction | ls | 1 | — | $73,881 | $73,881 | May 29, 2020, Open bid tab, 20000101 ↗ |
| Instrumentation And Control (Scada) System Integration Allowance | ls | 1 | — | $15,000 | $15,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Lawn Restoration, As Per Plan | ls | 1 | — | $7,500 | $7,500 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| 12 inch water main ductile iron pipe ansi class 52, push-on joint and cast iron mechanical | linear foot | 1 | — | $240.00 | $240.00 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| 12 inch conduit, type a, as per plan | linear foot | 1 | — | $125.00 | $125.00 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Double Gate, As Per Plan | each | 1 | — | $13,000 | $13,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Rock Channel Protection, Type C With Fabric Filter, As Per Plan | cubic yard | 1 | — | $700.00 | $700.00 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| General Construction, As Per Plan | ls | 1 | — | $3,250,000 | $3,250,000 | Oct 3, 2025, Open bid tab, 200426 ↗ |
| Utility Company Coordination Allowance | ls | 1 | — | $10,000 | $10,000 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 8 Inch Water Main Polyvinyl Chloride Pipe, Awwa C900 Pvc, As Per Plan | linear foot | 1 | — | $54.00 | $54.00 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 6 inch water main polyvinyl chloride pipe and fitting, awwa c900 pvc or c909 pvco, as per p | linear foot | 1 | — | $71.00 | $71.00 | Sep 5, 2024, Open bid tab, 232009 ↗ |
| 6 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $2,127 | $2,127 | Oct 3, 2025, Open bid tab, 241222 ↗ |