| Flexamat Erosion Control Mat | square foot | 1 | — | $50.00 | $50.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Centerline, 4 inch | mile | 1 | — | $5,185 | $5,185 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Meter And Chamber Removed And Reset | each | 1 | — | $1,500 | $1,500 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Type 2-3 Catch Basin, As Per Plan | each | 1 | — | $2,500 | $2,500 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 21 inch storm sewer, as per plan | linear foot | 1 | — | $200.00 | $200.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 18 inch storm sewer, as per plan | linear foot | 1 | — | $100.00 | $100.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Clermont County Standard Roll Curb And Gutter, As Per Plan | linear foot | 1 | — | $60.00 | $60.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Roll Curb And Gutter Replaced, In-Kind | linear foot | 1 | — | $50.00 | $50.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 2 inch asphalt concrete surface course, type 1, (448), pg 64-22 | cubic yard | 1 | — | $160.00 | $160.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Headwall Removed | each | 1 | — | $200.00 | $200.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Non-Tracking Tack Coat, 0.09 Gal/S.Y. | gallon | 1 | — | $7.00 | $7.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Mailbox Support Removed And Reset | each | 1 | — | $200.00 | $200.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Transverse/Diagonal Line | linear foot | 1 | — | $6.85 | $6.85 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Island Marking | square foot | 1 | — | $4.85 | $4.85 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 1-1/2 inch asphalt concrete surface course, type 1, (448) pg 64-22 | cubic yard | 1 | — | $162.00 | $162.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Pavement Repair | square yard | 1 | — | $150.00 | $150.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Type 2-2B Catch Basin, As Per Plan | each | 1 | — | $500.00 | $500.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 6 inch storm sewer, as per plan | linear foot | 1 | — | $60.00 | $60.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $3,500 | $3,500 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Concrete Masonry | cubic yard | 1 | — | $2,000 | $2,000 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Edge line, 4 inch | mile | 1 | — | $3,435 | $3,435 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Remove of ground mounted sign and disposal | each | 1 | — | $10.00 | $10.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Sign, Flat Sheet | square foot | 1 | — | $18.00 | $18.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Sign, Double Faced, Street Name | each | 1 | — | $85.00 | $85.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 6 inch non-reinforced concrete pavement, as per plan | square yard | 1 | — | $60.00 | $60.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Catch Basin Removed | each | 1 | — | $200.00 | $200.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Pipe removed, 24 inch and under | linear foot | 1 | — | $20.00 | $20.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Seeding And Mulching, Class 1, As Per Plan | square yard | 1 | — | $3.00 | $3.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 4 inch concrete walk | square foot | 1 | — | $10.00 | $10.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 2 inch pavement milling, asphalt concrete | square yard | 1 | — | $3.00 | $3.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 8 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $15.00 | $15.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 6 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $12.00 | $12.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 4 inch conduit, type b, 707.45, storm repair | linear foot | 1 | — | $10.00 | $10.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 12 inch storm sewer, as per plan | linear foot | 1 | — | $75.00 | $75.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| 4 inch storm sewer, as per plan | linear foot | 1 | — | $50.00 | $50.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Curb Ramp | square foot | 1 | — | $20.00 | $20.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Asphalt Concrete Base, Pg64-22 | cubic yard | 1 | — | $300.00 | $300.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Subgrade Compaction | square yard | 1 | — | $3.00 | $3.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |
| Lane Arrow | each | 1 | — | $150.00 | $150.00 | Aug 8, 2019, Open bid tab, bidtabcleame1803pdf ↗ |