| 4 Inch Force Main, As Per Plan | linear foot | 1 | — | $51.25 | $51.25 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Force main connection to existing sanitary force main | each | 1 | — | $1,900 | $1,900 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Water Work Misc. - Remove Cross, Install Cut In Tee With Long Sleeve | each | 1 | — | $2,272 | $2,272 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Hydrant Removed And Relocated, As Per Plan | each | 1 | — | $2,284 | $2,284 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 6 Inch Fire Hydrant Assembly, Including 6 Inch Valve And Valve Box, As Per Plan | each | 1 | — | $5,400 | $5,400 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 6 Inch Cutting-In Sleeve, Valve And Valve Box | each | 1 | — | $1,516 | $1,516 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 6 Inch X 6 Inch Cutting-In Tee W/ Long Sleeve, As Per Plan | each | 1 | — | $2,272 | $2,272 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 12 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $3,132 | $3,132 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 6 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $1,161 | $1,161 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 4 Inch Gate Valve And Valve Box, As Per Plan | each | 1 | — | $955.50 | $955.50 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Valve And Valve Box Removed And Disposed, As Per Plan | each | 1 | — | $50.00 | $50.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 1 Inch Polyethylene Service Branch | linear foot | 1 | — | $62.50 | $62.50 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Corp Stop And Saddle, As Per Plan | each | 1 | — | $275.50 | $275.50 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 12 inch water main polyvinyl chloride pipe and fitting, awwa c900 pvc | linear foot | 1 | — | $104.25 | $104.25 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 6 inch water main polyvinyl chloride pipe and fitting, awwa c900 pvc | linear foot | 1 | — | $69.75 | $69.75 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 4 inch water main polyvinyl chloride pipe and fitting, awwa c900, pvc, as per plan | linear foot | 1 | — | $70.00 | $70.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Connect New Water Main To Existing Water Main, As Per Plan | each | 1 | — | $1,974 | $1,974 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Power Service Allowance | ls | 1 | — | $50,000 | $50,000 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 48 Inch Sanitary Manhole, As Per Plan | each | 1 | — | $5,778 | $5,778 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 8 inch conduit, type c | linear foot | 1 | — | $96.25 | $96.25 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 6 inch water main removed, as per plan | linear foot | 1 | — | $2.50 | $2.50 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 4 inch water main removed, as per plan | linear foot | 1 | — | $2.50 | $2.50 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Force Main Connection To Sanitary Manhole, As Per Plan | each | 1 | — | $1,725 | $1,725 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Pump Station, As Per Plan | each | 1 | — | $280,789 | $280,789 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Erosion Control, As Per Plan | each | 1 | — | $1.00 | $1.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| 8 inch conduit, type b | linear foot | 1 | — | $100.75 | $100.75 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Pavement Removed | square yard | 1 | — | $100.00 | $100.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Asphalt Concrete Surface Course, Type 1, (448), Pg64-22 | cubic yard | 1 | — | $1,000 | $1,000 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $3,500 | $3,500 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Stormwater Pollution Prevention Plan | ls | 1 | — | $7,500 | $7,500 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Pipe removed, 24 inch and under | linear foot | 1 | — | $10.00 | $10.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Seeding And Mulching, As Per Plan | square yard | 1 | — | $3.00 | $3.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Maintaining Traffic | ls | 1 | — | $10,000 | $10,000 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Stabilized Crushed Aggregate | cubic yard | 1 | — | $100.00 | $100.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Aggregate Base | cubic yard | 1 | — | $500.00 | $500.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Tack Coat | gallon | 1 | — | $20.00 | $20.00 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Mobilization | ls | 1 | — | $10,000 | $10,000 | Jul 14, 2022, Open bid tab, 201027 ↗ |
| Clearing and Grubbing | ls | 1 | — | $30,000 | $30,000 | Jul 14, 2022, Open bid tab, 201027 ↗ |