| Storm Water Pollution Prevention Plan, As Per Plan | ls | 1 | — | $4,000 | $4,000 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| 2 inch force main carrier pipe install in casing pipe (casing separate bid item), as per pla | linear foot | 1 | — | $37.50 | $37.50 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| 2 Inch Force Main, As Per Plan | linear foot | 1 | — | $24.50 | $24.50 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Force Main Connection To Sanitary Manhole, As Per Plan | each | 1 | — | $1,500 | $1,500 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Pump Station, As Per Plan | each | 1 | — | $43,000 | $43,000 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| 6 Inch Conduit, Horizontal Directional Drilling As A Casing For Carrier Pipe, As Per Plan | linear foot | 1 | — | $100.00 | $100.00 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Contingency/Discretionary Allowance | ls | 1 | — | $10,000 | $10,000 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Type "c" pavement replace (asphalt), roadway, as per plan | square yard | 1 | — | $400.00 | $400.00 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Bonds And Insurances, As Per Plan | ls | 1 | — | $3,000 | $3,000 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Preconstruction Video Documentation | ls | 1 | — | $800.00 | $800.00 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Construction Layout Stakes And Surveying | ls | 1 | — | $5,000 | $5,000 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Erosion Control | each | 1 | — | $1.00 | $1.00 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Seeding And Mulching, As Per Plan | square yard | 1 | — | $5.00 | $5.00 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Maintaining Traffic | ls | 1 | — | $2,500 | $2,500 | Jun 6, 2022, Open bid tab, 210698 ↗ |
| Mobilization | ls | 1 | — | $1,200 | $1,200 | Jun 6, 2022, Open bid tab, 210698 ↗ |