Agency · awarded bid prices

Adams Co. Community Improvement Corp: awarded unit prices

50 winning bid prices read from 1 source documents, 2022. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Adams Co. Community Improvement Corp

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Permanent Erosion Control - Restoration (Spreading, Seeding, Mulching)square yard1—$5.75$5.75Nov 22, 2022, Open bid tab, 201027 ↗
Aggregate Base, Size No. 2, As Per Plancubic yard1—$44.77$44.77Nov 22, 2022, Open bid tab, 201027 ↗
Storm Outlet Control Structure, As Per Planeach1—$5,502$5,502Nov 22, 2022, Open bid tab, 201027 ↗
72 Inch Storm Manhole, As Per Planeach1—$7,100$7,100Nov 22, 2022, Open bid tab, 201027 ↗
60 Inch Storm Manhole, As Per Planeach1—$6,363$6,363Nov 22, 2022, Open bid tab, 201027 ↗
48 Inch Storm Manhole, As Per Planeach1—$4,665$4,665Nov 22, 2022, Open bid tab, 201027 ↗
Conduit, misc.: connect existing storm sewer to proposed structureeach1—$2,500$2,500Nov 22, 2022, Open bid tab, 201027 ↗
36 inch conduit, type clinear foot1—$144.00$144.00Nov 22, 2022, Open bid tab, 201027 ↗
36 inch conduit, type blinear foot1—$202.00$202.00Nov 22, 2022, Open bid tab, 201027 ↗
36 inch conduit, type alinear foot1—$247.00$247.00Nov 22, 2022, Open bid tab, 201027 ↗
24 inch conduit, type blinear foot1—$152.00$152.00Nov 22, 2022, Open bid tab, 201027 ↗
6 Inch Unclassified Pipe Underdrainslinear foot1—$10.00$10.00Nov 22, 2022, Open bid tab, 201027 ↗
Rock Channel Protection, Type C With Filtercubic yard1—$88.00$88.00Nov 22, 2022, Open bid tab, 201027 ↗
Earthwork (Stripping, Excavation, Embankment)cubic yard1—$8.60$8.60Nov 22, 2022, Open bid tab, 201027 ↗
Conduit, Misc.: Connection To Existing Pipeeach1—$2,914$2,914Nov 22, 2022, Open bid tab, 201027 ↗
Bonds And Insurances, As Per Planls1—$24,000$24,000Nov 22, 2022, Open bid tab, 201027 ↗
Sawing and seal asphalt concrete pavement jointlinear foot1—$9.50$9.50Nov 22, 2022, Open bid tab, 201027 ↗
6 inch conduit, type clinear foot1—$123.30$123.30Nov 22, 2022, Open bid tab, 201027 ↗
24 inch conduit, type clinear foot1—$204.00$204.00Nov 22, 2022, Open bid tab, 201027 ↗
Erosion Control, As Per Planeach1—$1.00$1.00Nov 22, 2022, Open bid tab, 201027 ↗
Inlet Removedeach1—$173.00$173.00Nov 22, 2022, Open bid tab, 201027 ↗
15 inch conduit, type blinear foot1—$125.00$125.00Nov 22, 2022, Open bid tab, 201027 ↗
18 inch conduit, type blinear foot1—$154.00$154.00Nov 22, 2022, Open bid tab, 201027 ↗
Catch Basin No. 2-3each1—$4,565$4,565Nov 22, 2022, Open bid tab, 201027 ↗
Pipe Removed, Over 24 Inchlinear foot1—$16.00$16.00Nov 22, 2022, Open bid tab, 201027 ↗
Proof Rollinghour1—$142.00$142.00Nov 22, 2022, Open bid tab, 201027 ↗
Granular Embankmentcubic yard1—$58.00$58.00Nov 22, 2022, Open bid tab, 201027 ↗
Excavation Of Subgradecubic yard1—$9.25$9.25Nov 22, 2022, Open bid tab, 201027 ↗
Pavement Removedsquare yard1—$5.00$5.00Nov 22, 2022, Open bid tab, 201027 ↗
Catch Basin, No. 2-4each1—$5,465$5,465Nov 22, 2022, Open bid tab, 201027 ↗
Asphalt Concrete Surface Course, Type 1, (448), Pg64-22cubic yard1—$198.92$198.92Nov 22, 2022, Open bid tab, 201027 ↗
Construction Layout Stakes And Surveyingls1—$21,000$21,000Nov 22, 2022, Open bid tab, 201027 ↗
Catch Basin, No. 2-2Aeach1—$4,165$4,165Nov 22, 2022, Open bid tab, 201027 ↗
Concrete Masonrycubic yard1—$2,500$2,500Nov 22, 2022, Open bid tab, 201027 ↗
12 inch conduit, type blinear foot1—$119.75$119.75Nov 22, 2022, Open bid tab, 201027 ↗
Pipe removed, 24 inch and underlinear foot1—$12.00$12.00Nov 22, 2022, Open bid tab, 201027 ↗
4 inch concrete walksquare foot1—$20.00$20.00Nov 22, 2022, Open bid tab, 201027 ↗
Asphalt Concrete Intermediate Course, Type 2, (448)cubic yard1—$173.90$173.90Nov 22, 2022, Open bid tab, 201027 ↗
Asphalt Concrete Base, Pg64-22cubic yard1—$158.20$158.20Nov 22, 2022, Open bid tab, 201027 ↗
Subgrade Compactionsquare yard1—$2.50$2.50Nov 22, 2022, Open bid tab, 201027 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.