Agency · awarded bid prices

Activity Center Park Trail: awarded unit prices

17 winning bid prices read from 1 source documents, 2021. The table lists the 17 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Activity Center Park Trail

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Drive Over Bollardseach1—$750.00$750.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
2-1/2 inch asphalt concrete surface course, type 1, pg 64-22cubic yard1—$205.00$205.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Aggregate Base, Limestone, As Per Plancubic yard1—$50.00$50.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
2-2B Catch Basin, As Per Planeach1—$3,000$3,000Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
12 inch cpslp storm sewer, as per planlinear foot1—$25.00$25.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Excavation of subgrade and structure embankment, as per plancubic yard1—$20.00$20.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Seeding And Mulching, As Per Plansquare yard1—$1.00$1.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
8 inch conduit, type b, 707.45, as per planlinear foot1—$40.00$40.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
6 inch conduit, type b, 707.45, as per planlinear foot1—$30.00$30.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
4 inch conduit, type b, 707.45, as per planlinear foot1—$20.00$20.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Subgrade Compactionsquare yard1—$1.00$1.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Clearing And Grubbing, As Per Planls1—$5,000$5,000Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Curb Ramp, As Per Plansquare foot1—$15.00$15.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
4 inch concrete walk, as per plansquare foot1—$10.00$10.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Stabilized Crushed Aggregatecubic yard1—$55.00$55.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Excavation, Including Embankment Construction, As Per Plancubic yard1—$20.00$20.00Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗
Removed, As Per Planls1—$1,500$1,500Jul 7, 2021, Open bid tab, bidtabmotcen2101pdf ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Ohio: statewide figures.