Skip to content
Hubstake

Cost by state

Construction unit costs in Virginia

Median awarded unit prices for the 37 most-bid items on Virginia public projects, from winning bids in agency bid tabulations.

Cost by state › Virginia

ItemPerMedianMiddle halfWinning bids
Flagger Servicehour$35.85$30.00 – $45.00650
Type B Class I Pvmt Line Mrkg 4"linear foot$1.08$0.85 – $1.88451
Temp. Pvmt Mrkg, TY. A, 4"linear foot$0.17$0.1 – $0.24447
Type B Class I Pvmt Line Mrkg 6"linear foot$1.40$0.99 – $2.65368
Type B Class I Pvmt Line Mrkg 24"linear foot$15.00$10.85 – $22.00362
Inlaid Pavement Marker Asphalteach$52.40$39.95 – $86.53334
Truck Mounted Attenuatorhour$30.00$13.62 – $58.07283
Agr.Base Mat.Ty.I or II NO. 21A OR21Bton$60.00$45.00 – $73.87274
Port.Changeable Mess. Signhour$9.00$5.00 – $14.00273
Eradicate Nonlinear Pvmt Mrkgsquare foot$10.50$6.50 – $16.20249
Pvmt Symb Mrkg SGL Turn Arr. TY B CL Ieach$161.15$135.00 – $201.00244
Temp. Pvmt Mrkg, TY. A, 6"linear foot$0.22$0.11 – $0.42241
Temp. Silt Fence Type Alinear foot$5.75$3.50 – $8.77235
Type B Class II Pvmt Line Mrkg 24"linear foot$30.13$22.21 – $45.79224
Temporary Signsquare foot$33.65$24.04 – $45.00222
Rumble Strip Cylindrical Asphaltlinear foot$0.6$0.35 – $1.25201
Sign Panelsquare foot$50.00$40.00 – $64.13196
Regular Seedpound$16.64$9.10 – $22.50181
Limeton$350.00$200.00 – $500.00179
Fertilizer Nitrogen - Npound$4.00$2.30 – $6.80179
Fertilizer Potassium - Kpound$4.00$2.35 – $6.67179
Fertilizer Phosphorous - Ppound$4.00$2.35 – $6.67179
Type A Pvmt Line Mrkg 4"linear foot$0.38$0.3 – $0.66177
Overseedingpound$15.00$7.25 – $21.89175
Temporary Seedpound$16.12$11.48 – $20.00164
Sign Post STP-1, 2", 14 Gaugelinear foot$28.00$22.48 – $40.50159
Inlet Protection Type Aeach$389.61$248.75 – $600.00158
Portable Changeable Message Signhour$7.63$2.75 – $12.00154
Hydraulic Erosion Control Product Type 3square yard$1.35$1.10 – $2.50148
Regular Excavationcubic yard$82.25$50.00 – $139.68146
Remove Existing Guardraillinear foot$8.50$5.00 – $11.12140
Aggr. Base Matl. TY. I NO. 21Bton$67.00$50.00 – $90.00135
Borrow Excavationcubic yard$55.00$35.00 – $85.00125
Flowable Backfillcubic yard$554.94$359.90 – $750.0082
Structure Excavationcubic yard$56.00$34.50 – $92.5039
Clearing AND Grubbingacre$39,756$22,800 – $75,00029
Geotextile Fabricsquare yard$5.55$3.27 – $9.0029

Agencies in Virginia