Skip to content
Hubstake

Erosion Control · awarded bid prices

Remove and Reset Erosion Control Wattle: cost per linear foot in South Dakota

The median awarded price is $1.70 per linear foot, from 110 winning bids on 110 public projects in South Dakota (2023–2026). Half of the awarded prices fall between $1.00 and $3.13.

Cost by state › South Dakota › Remove and Reset Erosion Control Wattle

$1.70median per linear foot
$1.00 – $3.13middle half (25th–75th percentile)
110winning bids, 110 source documents
2023–2026lettings covered (last 3 years)

Winning bids only, as printed in the agencies' bid tabulations (SDDOT). These are prices agencies awarded, not quotes: a price on a given job depends on quantity, location and timing, and the figures here are not adjusted for any of them.

Trend

The median awarded price went from $2.50 in 2021 to $1.06 in 2026 (-58%).

YearMedian per linear footWinning bids
2021$2.5031
2022$2.2524
2023$2.4140
2024$2.4940
2025$1.3142
2026$1.0616

Most recent source documents

LettingAgencyQuantityAwarded unit priceSource
Aug 5, 2026SDDOT1425 Ft$1.00Open bid tab, PCN 05X0 ↗
May 20, 2026SDDOT115 Ft$1.00Open bid tab, PCN 09A9 ↗
May 20, 2026SDDOT296 Ft$7.00Open bid tab, PCN 08RT ↗
May 13, 2026SDDOT5058 Ft$6.65Open bid tab, PCN 034J ↗
May 6, 2026SDDOT225 Ft$1.10Open bid tab, PCN 067V ↗

See every awarded price for this item, in all states, on the Remove and Reset Erosion Control Wattle item page.

Related items in South Dakota

Free account: new awarded prices for this item show on your watchlist.


We record the address to count report readers; the link opens right after.