| Construction sign | square foot | $19.75 | $14.00 – $24.00 | 31 | Jul 22, 2026, line 0320 ↗ |
| Flagger | hour | $44.00 | $40.00 – $48.00 | 31 | Jul 22, 2026, line 0340 ↗ |
| Cone | each | $22.00 | $20.00 – $25.00 | 30 | Jul 22, 2026, line 0310 ↗ |
| Drum | each | $60.00 | $40.00 – $71.25 | 28 | Jul 22, 2026, line 0300 ↗ |
| Hand Labor, Straight Time | hour | $66.00 | $61.00 – $75.00 | 27 | Jul 22, 2026, line 0250 ↗ |
| Truck - Large (Including Operator) | hour | $125.00 | $100.00 – $130.00 | 27 | Jul 22, 2026, line 0270 ↗ |
| Portable Changeable Message Sign | each | $3,800 | $2,750 – $5,000 | 26 | Jul 22, 2026, line 0350 ↗ |
| All Purpose Excavator (Including Operator) | hour | $197.04 | $150.00 – $247.50 | 26 | Jul 22, 2026, line 0260 ↗ |
| Temporary 4 inch paint pavement marking line, white or yellow | linear foot | $0.2 | $0.15 – $0.475 | 23 | Jul 22, 2026, line 0240 ↗ |
| Hot mix asphalt 9.5 mm (sidewalk, drives, incidentals) | ton | $265.00 | $228.75 – $276.75 | 20 | May 6, 2026, line 0170 ↗ |
| White or Yellow Pavement & Curb Marking | square foot | $3.42 | $3.06 – $3.97 | 18 | May 6, 2026, line 1170 ↗ |
| Pavement butt joint | square yard | $18.50 | $16.00 – $20.00 | 17 | May 6, 2026, line 0040 ↗ |
| Loam | cubic yard | $105.00 | $75.00 – $120.00 | 17 | May 6, 2026, line 0620 ↗ |
| Curb Ramp Detectable Warning Field | square foot | $155.00 | $140.00 – $207.15 | 15 | May 6, 2026, line 0480 ↗ |
| Adjusting Manhole or Catch Basin to Grade | each | $2,000 | $1,750 – $2,150 | 13 | May 6, 2026, line 0370 ↗ |
| Hot MIX Asphalt 12.5 MM Base | ton | $250.00 | $225.00 – $266.09 | 12 | Jul 22, 2026, line 0070 ↗ |