Skip to content
Hubstake

Agency · awarded bid prices

Vermont Agency of Transportation: awarded unit prices

26,974 winning bid prices read from 1,093 source documents, 2009–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Vermont Agency of Transportation

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Mobilization/Demobilizationls1,026—$79,100$9.35 – $4,714,746Sep 25, 2026, Open bid tab, contract 15G151 ↗
Field Office, Engineersls736$15,000$32,830$17.50 – $200,000Sep 25, 2026, Open bid tab, contract 15G151 ↗
Testing equipment, asphaltls672$536.75$500.00$1.00 – $19,000Jun 19, 2026, Open bid tab, contract 21V391 ↗
Testing Equipment, Concretels530$990.00$1,000$1.00 – $5,500May 29, 2026, Open bid tab, contract 21A024 ↗
Traffic Controlls458—$30,000$500.00 – $1,253,756Sep 25, 2026, Open bid tab, contract 15G151 ↗
Epsc Planls427$3,500$5,000$1.00 – $23,000Sep 4, 2026, Open bid tab, contract 24B002 ↗
Clearing and grubbing, including individual tree and stumpsls341$10,000$46,000$500.00 – $406,700May 14, 2021, Open bid tab, contract 20G080 ↗
Traffic Control, All-Inclusivels270—$232,000$1,000 – $3,500,000Jun 19, 2026, Open bid tab, contract 21V391 ↗
Flaggershour253$46.00$1.00$1.00 – $95.00Sep 25, 2026, Open bid tab, contract 15G151 ↗
Trench Excavation Of Earth, Exploratorycubic yard227$75.00$75.00$75.00 – $250.00Jun 19, 2026, Open bid tab, contract 21V391 ↗
Field Office Communications (N.A.B.I.)dl219$1.00$1.00$1.00Jun 19, 2026, Open bid tab, contract 21V391 ↗
Uniformed Traffic Officershour217$80.00$100.00$1.00 – $250.00Sep 4, 2026, Open bid tab, contract 24B002 ↗
Topsoilcubic yard214$65.00$10.00$1.00 – $408.00Sep 25, 2026, Open bid tab, contract 15G151 ↗
Portable Changeable Message Signeach197$4,500$2,000$800.00 – $40,000Jun 19, 2026, Open bid tab, contract 21V391 ↗
Rolled Erosion Control Product, Type Isquare yard191$3.65$2.60$1.00 – $20.00Jun 19, 2026, Open bid tab, contract 21V391 ↗
Common Excavationcubic yard166$25.00$20.00$5.00 – $325.00Sep 4, 2026, Open bid tab, contract 24B002 ↗
Cpm Scheduleeach157$565.00$475.00$1.00 – $10,000Sep 25, 2026, Open bid tab, contract 15G151 ↗
Clearing And Grubbing, Including Individualls154$19,750$12,000$1.00 – $500,000May 29, 2026, Open bid tab, contract 21A024 ↗
Fertilizerpound154$5.00$5.00$0.34 – $450.00Apr 18, 2025, Open bid tab, contract 23B742 ↗
Seedpound152$12.19$15.00$2.90 – $100.00Apr 18, 2025, Open bid tab, contract 23B742 ↗
Hay mulchington146$1,200$1,400$200.00 – $5,900Sep 4, 2026, Open bid tab, contract 24B002 ↗
Emulsified Asphaltcwt141—$30.00$1.00 – $1,500Apr 18, 2025, Open bid tab, contract 23B742 ↗
Monitoring Epsc Planhour139$50.00$20.00$5.00 – $210.00Sep 25, 2026, Open bid tab, contract 15G151 ↗
Square Tube Sign Post And Anchorlinear foot130$20.00$26.50$10.00 – $75.00May 22, 2026, Open bid tab, contract 19J223 ↗
Aggregate shoulder, rapton128$36.50$150.00$3.00 – $250.00Aug 7, 2026, Open bid tab, contract 26A001 ↗
Stone Fill, Type Icubic yard127$87.50$80.00$30.00 – $595.00Sep 4, 2026, Open bid tab, contract 24B002 ↗
Coarse-milling, asphalt pavementsquare yard127—$11.00$0.1 – $150.00May 29, 2026, Open bid tab, contract 21A024 ↗
Delineator With Steel Posteach126$120.00$150.00$50.00 – $300.00Sep 4, 2026, Open bid tab, contract 24B002 ↗
Stabilized Construction Entrancecubic yard119$65.00$89.00$20.00 – $400.00May 29, 2026, Open bid tab, contract 21A024 ↗
Granular backfill for structurecubic yard119$65.00$62.00$25.50 – $250.00May 29, 2026, Open bid tab, contract 21A024 ↗
Durable 4 Inch Yellow Line, Epoxy Paintlinear foot118$0.89$0.92$0.25 – $6.00Jun 19, 2026, Open bid tab, contract 21V391 ↗
Durable 4 Inch White Line, Epoxy Paintlinear foot118$0.89$0.92$0.25 – $6.00Jun 19, 2026, Open bid tab, contract 21V391 ↗
Barrier Fencelinear foot118$3.25$5.00$0.5 – $11.50Sep 25, 2026, Open bid tab, contract 15G151 ↗
Price adjust, asphalt cement (n.a.b.i.)lu117$1.00$1.00$1.00Apr 18, 2025, Open bid tab, contract 23B742 ↗
Agricultural Limestoneton117$820.00$1,000$50.50 – $2,500Apr 18, 2025, Open bid tab, contract 23B742 ↗
Subbase Of Dense Graded Crushed Stonecubic yard116$55.50$68.00$19.00 – $338.00May 29, 2026, Open bid tab, contract 21A024 ↗
Special Provision (Traffic Control, All-Inclusive)ls112$30,000$24,700$1,000 – $2,701,268Mar 1, 2019, Open bid tab, contract 14T189 ↗
All Purpose Excavator Rental, Type Ihour109$125.00$75.00$5.00 – $335.00Jun 19, 2026, Open bid tab, contract 21V391 ↗
Project Demarcation Fencelinear foot107$2.00$1.00$0.5 – $8.00Sep 4, 2026, Open bid tab, contract 24B002 ↗
Furnishing Equipment For Driving Pilingls106$40,000$22,000$10,000 – $900,000Dec 19, 2025, Open bid tab, contract 23B827 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Vermont: statewide figures.