| Manhole Adjusted To Grade | each | 29 | $100.00 | $100.00 | $100.00 – $1,500 | Jan 13, 2026, Open bid tab, bidtabinranpci2501pdf-s0 ↗ |
| Valve Adjusted To Grade | each | 27 | $50.00 | $50.00 | $50.00 – $100.00 | Jan 13, 2026, Open bid tab, bidtabinranpci2501pdf-s0 ↗ |
| Tack Coat @0.10 Gal./S.Y. | gals | 27 | — | $0.01 | $0.01 – $3.25 | Jan 13, 2026, Open bid tab, bidtabinranpci2501pdf-s0 ↗ |
| 1-1/2 inch - 9.5mm hot mix asphalt surface, pg64-22 | ton | 24 | $86.00 | $86.00 | $84.25 – $90.00 | Jan 13, 2026, Open bid tab, bidtabinranpci2501pdf-s0 ↗ |
| 1-1/2 inch± asphalt milling | square yard | 20 | $1.84 | $1.65 | $1.65 – $2.00 | Jan 13, 2026, Open bid tab, bidtabinranpci2501pdf-s0 ↗ |
| Traffic Control Devices And Lighting, As Per Plan | ls | 17 | $2,297 | $2,359 | $2,295 – $2,359 | Jan 13, 2026, Open bid tab, bidtabinranpci2501pdf-s0 ↗ |
| Traffic Controls For Construction And Maintenance Operations, As Per Plan | ls | 11 | $300.00 | $2,000 | $300.00 – $2,500 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| 1-1/2 inch - hot mix asphalt, 9.5mm, surface, type b, pg 64-22 | ton | 7 | $95.00 | $95.00 | $95.00 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |
| Milling, asphalt (1-1/2 inch) | square yard | 7 | $2.05 | $2.05 | $2.05 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |
| Tack Coat, 0.10 Gal/S.Y. | gallon | 7 | $3.00 | $3.00 | $3.00 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |
| Maintaining Traffic | ls | 7 | $1,250 | $1,250 | $200.00 – $1,250 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s0 ↗ |
| 1-1/2 inch - 9.5mm type b hot mix asphalt surface, pg64-22 | ton | 4 | — | $115.00 | $115.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| 1-1/2 inch - 9.5mm hot mix asphalt intermediate, pg64-22 | ton | 3 | — | $90.00 | $90.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s1 ↗ |
| Pipe, type 2, circular, 4 inch 907.23 | linear foot | 2 | — | $50.00 | $50.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| 1-1/2 inch - hot mix asphalt, 9.5mm, intermediate, pg 64-22 | ton | 2 | — | $125.00 | $125.00 – $350.00 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |
| Pipe, type 2, circular, 12 inch 907.23 | linear foot | 2 | — | $60.00 | $50.00 – $60.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Pipe, type 2, circular, 8 inch 907.23 | linear foot | 2 | — | $50.00 | $50.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Pipe, type 2, circular, 6 inch 907.23 | linear foot | 2 | — | $50.00 | $50.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Mulched Seeding, Grass, Type 2, As Per Plan | square yard | 2 | — | $2.50 | $0.9 – $2.50 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Compaction aggregate, no. 53, base, as per plan | ton | 2 | — | $37.00 | $25.00 – $37.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Subgrade Treatment, Type 1A, As Per Plan | square yard | 2 | — | $5.00 | $5.00 – $50.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Remove, as per plan | ls | 2 | — | $10,250 | $3,500 – $10,250 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Mobilization and Demobilization | ls | 2 | — | $5,500 | $100.00 – $5,500 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Oak street (first street to market street) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $4.00 | $4.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s3 ↗ |
| Division street (howard street to high street) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $4.00 | $4.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s2 ↗ |
| North fulton street (high street to state road 32) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $4.00 | $4.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s1 ↗ |
| Type E Catch Basin | each | 1 | — | $3,500 | $3,500 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Tack Coat @0.06 Gal./S.Y. | gals | 1 | — | $3.25 | $3.25 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| 2-1/2 inch - 19mm, type b, hot mix asphalt intermediate, pg64-22 | ton | 1 | — | $95.00 | $95.00 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| East Street (South Street To Washington Street) 105 Construction Engineering | ls | 1 | — | $5,000 | $5,000 | Feb 17, 2023, Open bid tab, bidtabinranpci2202pdf-s0 ↗ |
| Washington street (fulton street to indiana street) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s6 ↗ |
| Fulton street (c.r. 200 to howard street) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s5 ↗ |
| Division street (oak street to howard street) 306 3 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s4 ↗ |
| 1st street (howard street to dead end) 306 3 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s3 ↗ |
| 3road street (c.r. 200 to howard street) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s2 ↗ |
| High street (1st street to 3road street) 306 3 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s1 ↗ |
| Oak street (1st street to 3road street) 306 1-1/2 inch± asphalt milling | square yard | 1 | — | $2.00 | $2.00 | Jan 25, 2022, Open bid tab, bidtabinranpci2102pdf-s0 ↗ |
| Sanitary Service Relocated | linear foot | 1 | — | $25.00 | $25.00 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |
| Water Works, Misc.: Waer Service Line Relocated | linear foot | 1 | — | $25.00 | $25.00 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |
| Catch Basin, Remove | each | 1 | — | $100.00 | $100.00 | Mar 4, 2021, Open bid tab, bidtabinranpci2001pdf ↗ |