| Traffic Controls For Construction And Maintenance Operations, As Per Plan | ls | 21 | — | $8,935 | $112.50 – $8,935 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Mobilization And Demobiliziation | ls | 16 | — | $17,700 | $225.00 – $17,700 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Crack Seal | square yard | 11 | $0.75 | $0.75 | $0.75 | Feb 1, 2024, Open bid tab, bidtabinadamon2302pdf-s4 ↗ |
| Milling, asphalt (1-1/2 inch) | square yard | 9 | $3.00 | $5.00 | $2.30 – $5.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| 1-1/2 inch - 9.5mm type b hot mix asphalt surface, pg64-22 | ton | 8 | $95.50 | $91.00 | $85.00 – $100.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Tack Coat | gallon | 8 | $3.75 | $3.45 | $3.45 – $4.00 | Jan 16, 2025, Open bid tab, bidtabinadamon2401pdf-s0 ↗ |
| Manhole Adjusted To Grade | each | 7 | $200.00 | $200.00 | $200.00 – $517.50 | Jan 16, 2025, Open bid tab, bidtabinadamon2401pdf-s0 ↗ |
| 2-1/2 inch 19.5 mm, type b, hot mix asphalt intermediate, pg 64-22 | ton | 6 | $105.00 | $132.00 | $85.00 – $132.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Subgrade Treatment, Type 1A, As Per Plan | square yard | 6 | — | $2.10 | $2.00 – $29.00 | Jan 16, 2025, Open bid tab, bidtabinadamon2401pdf-s0 ↗ |
| Remove, as per plan | ls | 6 | — | $0.01 | $0.01 – $3,250 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Construction Engineering | ls | 6 | — | $10,500 | $1.00 – $10,500 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Compaction aggregate, no. 53, base | ton | 5 | $30.00 | $57.00 | $17.60 – $57.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Mulched Seeding, Grass, Type 2, As Per Plan | square yard | 5 | $6.25 | $6.25 | $1.75 – $10.00 | Jan 16, 2025, Open bid tab, bidtabinadamon2401pdf-s1 ↗ |
| Excavation Common | cubic yard | 5 | $35.25 | $30.00 | $30.00 – $65.00 | Jan 16, 2025, Open bid tab, bidtabinadamon2401pdf-s0 ↗ |
| Erosion Control | ls | 5 | — | $0.01 | $0.01 – $1,575 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| 3 inch 25mm, type b, hot mix asphalt base, pg 64-22 | ton | 4 | — | $119.00 | $85.00 – $119.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Mailbox Removed And Reset | each | 4 | — | $500.00 | $164.00 – $500.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Pipe, type 4, circular, 6 inch, 907.23 | linear foot | 3 | — | $46.00 | $46.00 – $87.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Milling, asphalt 2-1/2 inch | square yard | 3 | — | $10.00 | $3.40 – $10.00 | Feb 1, 2024, Open bid tab, bidtabinadamon2302pdf-s2 ↗ |
| Curb Ramp, Concrete, As Per Plan | square foot | 3 | — | $52.00 | $22.00 – $52.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| 4 inch 25mm, type b, hot mix asphalt base, pg 64-22 | ton | 3 | — | $85.00 | $75.00 – $155.00 | Feb 1, 2024, Open bid tab, bidtabinadamon2302pdf-s2 ↗ |
| Sign, Sheet Assembly, Remove And Relocate | each | 2 | — | $500.00 | $287.50 – $500.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Pipe, type 4, circular, 8 inch, 907.23 | linear foot | 2 | — | $52.00 | $52.00 – $93.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Pipe, type 4, circular, 4 inch, 907.23 | linear foot | 2 | — | $40.00 | $40.00 – $75.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Pccp for approaches, 6 inch | square yard | 2 | — | $160.00 | $130.00 – $160.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Concrete Curb, Vertical | linear foot | 2 | — | $26.00 | $26.00 – $46.50 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Mastic Crack Seal, As Per Plan | square yard | 2 | — | $0.75 | $0.75 – $1.25 | Feb 17, 2023, Open bid tab, bidtabinadamon2201pdf-s0 ↗ |
| Subgrade Treatment, Type 1C, As Per Plan | square yard | 2 | — | $31.50 | $31.50 | Feb 17, 2023, Open bid tab, bidtabinadamon2201pdf-s0 ↗ |
| Excavation, Common, As Per Plan | cubic yard | 2 | — | $56.00 | $45.00 – $56.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Compaction aggregate, no. 53, base, as per plan | ton | 2 | — | $40.25 | $25.00 – $40.25 | Feb 17, 2023, Open bid tab, bidtabinadamon2201pdf-s0 ↗ |
| 4 inch concrete walk | square foot | 2 | — | $11.50 | $11.50 – $17.75 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Clearing and Grubbing | ls | 2 | — | $0.01 | $0.01 – $1,450 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Catch Basin, Type K | each | 1 | — | $4,250 | $4,250 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Catch Basin, Type E | each | 1 | — | $4,250 | $4,250 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Pipe, type 2, circular, 15 inch 907.02 | linear foot | 1 | — | $60.00 | $60.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Pipe, type 2, circular, 12 inch 907.02 | linear foot | 1 | — | $55.00 | $55.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Mulched Seeding, Grass, Type 2 | square yard | 1 | — | $4.25 | $4.25 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Curb and Gutter, Concrete | linear foot | 1 | — | $28.00 | $28.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Asphalt for Tack Coat | square yard | 1 | — | $0.24 | $0.24 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |
| Flowable backfill, non-remove | cubic yard | 1 | — | $225.00 | $225.00 | Mar 26, 2026, Open bid tab, bidtabinadamon2403pdf ↗ |