| Traffic Controls For Construction And Maintenance Operations, As Per Plan | ls | 1 | — | $365.00 | $365.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Casting, Adjust To Grade | each | 1 | — | $450.00 | $450.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Mulched Seeding, Grass, Type 2, As Per Plan | square yard | 1 | — | $2.00 | $2.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Concrete Curb, Vertical, In-Kind | linear foot | 1 | — | $32.00 | $32.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Sidewalk, Concrete, In-Kind | square foot | 1 | — | $7.80 | $7.80 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| 1-1/2 inch - 9.5mm, surface, type b, hot mix asphalt pg 64-22 | ton | 1 | — | $83.50 | $83.50 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| 2-1/2 inch - 12.5mm, intermediate, type b, hot mix asphalt pg 64-22 | ton | 1 | — | $115.00 | $115.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| 1-1/2 inch± asphalt milling | square yard | 1 | — | $5.50 | $5.50 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Compaction aggregate, no. 53, base, as per plan | ton | 1 | — | $25.00 | $25.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Subgrade Treatment, Type 1A, As Per Plan | square yard | 1 | — | $10.00 | $10.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Temporary Inlet Protection | each | 1 | — | $250.00 | $250.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Excavation Common | cubic yard | 1 | — | $10.00 | $10.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Pavement remove | square yard | 1 | — | $9.00 | $9.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Sidewalk Concrete, Remove | square yard | 1 | — | $10.00 | $10.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Curb, Concrete, Remove | linear foot | 1 | — | $7.00 | $7.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Remove, as per plan | ls | 1 | — | $706.00 | $706.00 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Construction Engineering | ls | 1 | — | $1,155 | $1,155 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Tack Coat, 0.10 Gal/S.Y. | gallon | 1 | — | $2.30 | $2.30 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |
| Mobilization and Demobilization | ls | 1 | — | $9,190 | $9,190 | Mar 17, 2021, Open bid tab, bidtabbryantpdf ↗ |