| Install 2-inch Blowoff Assembly | each | 1 | — | $2,500 | $2,500 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Install 12-inch DI Water Main | linear foot | 1 | — | $60.00 | $60.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Furnish and install of 12” storm drain | linear foot | 1 | — | $100.00 | $100.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Supply and install of 4’ catch basins | vf | 1 | — | $750.00 | $750.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Grading at the end of tedford road | ls | 1 | — | $2,500 | $2,500 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Install of aluminum pipe arch | ls | 1 | — | $200,000 | $200,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Remove of existing culvert | ls | 1 | — | $2,500 | $2,500 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Embankment Construction | ls | 1 | — | $150,000 | $150,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Stream Bypass and Cofferdams | ls | 1 | — | $100,000 | $100,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Furnish and install of guardrail | linear foot | 1 | — | $60.00 | $60.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Supply and install of slipform concrete curb | linear foot | 1 | — | $30.00 | $30.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Sidewalk paving (9.0 mm hot mix asphalt) | ton | 1 | — | $225.00 | $225.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Surface paving (12.5 mm hot mix asphalt) | ton | 1 | — | $195.00 | $195.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Binder paving (19.0 mm hot mix asphalt) | ton | 1 | — | $190.00 | $190.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Aggregate Subbase | cubic yard | 1 | — | $50.00 | $50.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Pavement Milling | square yard | 1 | — | $25.00 | $25.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Remove & disposal of pavement | square yard | 1 | — | $8.00 | $8.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Additional Permit Conditions Allowance | ls | 1 | — | $20,000 | $20,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Mobilization/Demobilization (not to exceed 10% of Total Cost) | ls | 1 | — | $75,000 | $75,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Pipe Trench Insulation | linear foot | 1 | — | $10.00 | $10.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Sewer Bypass | ls | 1 | — | $20,000 | $20,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Lightweight Fill Foamed Glass Aggregate | cubic yard | 1 | — | $125.00 | $125.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Remove of unsuitable material | cubic yard | 1 | — | $75.00 | $75.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Erosion & sediment controls | ls | 1 | — | $50,000 | $50,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Granular Borrow | cubic yard | 1 | — | $75.00 | $75.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Aggregate Base | cubic yard | 1 | — | $125.00 | $125.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Riprap | cubic yard | 1 | — | $225.00 | $225.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Traffic Control | ls | 1 | — | $20,000 | $20,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Common Excavation | cubic yard | 1 | — | $75.00 | $75.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Install 12 Inch Gate Valve | each | 1 | — | $350.00 | $350.00 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |
| Dewatering | ls | 1 | — | $25,000 | $25,000 | Jan 30, 2025, Open bid tab, Tedford Road Culvert Replacement/21687 ↗ |