Swansea, MA: awarded unit prices

71 winning bid prices read from 4 source documents, 2022–2025. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Swansea, MA

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Price adjust – portland cement concreteallowance1—$1,000$1,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Price adjust – liquid asphaltallowance1—$5,000$5,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Price adjust – gasallowance1—$1,000$1,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Price adjust – dieselallowance1—$25,000$25,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Traffic Control Personnelallowance1—$200,000$200,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Traffic Management Planls1—$100,000$100,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Utility Service Coordination and Relocationls1—$5,000$5,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Force Main via Directional Drilling Sta 2008+25 to 2014+32ls1—$200,000$200,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Force Main via Directional Drilling Sta 1008+43 to 1013+65ls1—$200,000$200,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Bentonite Trench Damseach1—$2,000$2,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Remove and Reset Granite Curb Transition Pieceeach1—$300.00$300.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Remove Concrete Road Basesquare yard1—$30.00$30.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Replace Concrete Sidewalk or Driveway Apronsquare yard1—$200.00$200.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Replace asphalt concrete driveway apronsquare yard1—$50.00$50.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Replace asphalt concrete bermlinear foot1—$10.00$10.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Replace asphalt concrete sidewalksquare yard1—$200.00$200.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Top Course For Final Trench Pavementton1—$150.00$150.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Intermediate Course for Final Trench Pavementton1—$150.00$150.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Binder for Temporary Trench Pavementton1—$150.00$150.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Relocate/Repair Drainage Pipe (all sizes)each1—$5,000$5,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Management and Disposal of Contaminated Soils Class Cton1—$0.01$0.01Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Management and Disposal of Contaminated Soils Class Bton1—$0.01$0.01Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Management and Disposal of Contaminated Soils Class Aton1—$0.01$0.01Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Excavation and replace of unsuitable material below normal gradecubic yard1—$0.01$0.01Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Replace of unsuitable material above normal gradecubic yard1—$30.00$30.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Force Main ARV Structureeach1—$50,000$50,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Sewer Manhole Inside Dropeach1—$1,000$1,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Sewer Manhole Inverteach1—$500.00$500.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
4 Ft Diameter Sewer Manhole Walls and Conevf1—$100.00$100.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
4 Ft Diameter Sewer Manhole, 4’ Baseeach1—$20,000$20,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
10 inch HDPE Force Mainlinear foot1—$200.00$200.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
8 inch HDPE Force Mainlinear foot1—$150.00$150.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
6 inch HDPE Force Mainlinear foot1—$150.00$150.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
4 inch HDPE Force Mainlinear foot1—$200.00$200.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
15 inch PVC Gravity Sewer, all Depthslinear foot1—$500.00$500.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
12 inch PVC Gravity Sewer, all Depthslinear foot1—$400.00$400.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
10 inch PVC Gravity Sewer, all Depthslinear foot1—$300.00$300.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
8 inch PVC Gravity Sewer, all Depthslinear foot1—$200.00$200.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
6 inch Sewer Service Chimneyvf1—$100.00$100.00Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗
Aessallowance1—$25,000$25,000Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.