| Price adjust – portland cement concrete | allowance | 1 | — | $1,000 | $1,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Price adjust – liquid asphalt | allowance | 1 | — | $5,000 | $5,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Price adjust – gas | allowance | 1 | — | $1,000 | $1,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Price adjust – diesel | allowance | 1 | — | $25,000 | $25,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Traffic Control Personnel | allowance | 1 | — | $200,000 | $200,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Traffic Management Plan | ls | 1 | — | $100,000 | $100,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Utility Service Coordination and Relocation | ls | 1 | — | $5,000 | $5,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Force Main via Directional Drilling Sta 2008+25 to 2014+32 | ls | 1 | — | $200,000 | $200,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Force Main via Directional Drilling Sta 1008+43 to 1013+65 | ls | 1 | — | $200,000 | $200,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Bentonite Trench Dams | each | 1 | — | $2,000 | $2,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Remove and Reset Granite Curb Transition Piece | each | 1 | — | $300.00 | $300.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Remove Concrete Road Base | square yard | 1 | — | $30.00 | $30.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Replace Concrete Sidewalk or Driveway Apron | square yard | 1 | — | $200.00 | $200.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Replace asphalt concrete driveway apron | square yard | 1 | — | $50.00 | $50.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Replace asphalt concrete berm | linear foot | 1 | — | $10.00 | $10.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Replace asphalt concrete sidewalk | square yard | 1 | — | $200.00 | $200.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Top Course For Final Trench Pavement | ton | 1 | — | $150.00 | $150.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Intermediate Course for Final Trench Pavement | ton | 1 | — | $150.00 | $150.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Binder for Temporary Trench Pavement | ton | 1 | — | $150.00 | $150.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Relocate/Repair Drainage Pipe (all sizes) | each | 1 | — | $5,000 | $5,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Management and Disposal of Contaminated Soils Class C | ton | 1 | — | $0.01 | $0.01 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Management and Disposal of Contaminated Soils Class B | ton | 1 | — | $0.01 | $0.01 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Management and Disposal of Contaminated Soils Class A | ton | 1 | — | $0.01 | $0.01 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Excavation and replace of unsuitable material below normal grade | cubic yard | 1 | — | $0.01 | $0.01 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Replace of unsuitable material above normal grade | cubic yard | 1 | — | $30.00 | $30.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Force Main ARV Structure | each | 1 | — | $50,000 | $50,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Sewer Manhole Inside Drop | each | 1 | — | $1,000 | $1,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Sewer Manhole Invert | each | 1 | — | $500.00 | $500.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 4 Ft Diameter Sewer Manhole Walls and Cone | vf | 1 | — | $100.00 | $100.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 4 Ft Diameter Sewer Manhole, 4’ Base | each | 1 | — | $20,000 | $20,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 10 inch HDPE Force Main | linear foot | 1 | — | $200.00 | $200.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 8 inch HDPE Force Main | linear foot | 1 | — | $150.00 | $150.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 6 inch HDPE Force Main | linear foot | 1 | — | $150.00 | $150.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 4 inch HDPE Force Main | linear foot | 1 | — | $200.00 | $200.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 15 inch PVC Gravity Sewer, all Depths | linear foot | 1 | — | $500.00 | $500.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 12 inch PVC Gravity Sewer, all Depths | linear foot | 1 | — | $400.00 | $400.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 10 inch PVC Gravity Sewer, all Depths | linear foot | 1 | — | $300.00 | $300.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 8 inch PVC Gravity Sewer, all Depths | linear foot | 1 | — | $200.00 | $200.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| 6 inch Sewer Service Chimney | vf | 1 | — | $100.00 | $100.00 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |
| Aess | allowance | 1 | — | $25,000 | $25,000 | Sep 4, 2025, Open bid tab, ROUTE 6 CORRIDOR SEWER COLLECTION DESIGN AND CONSTRUCTION/ Office: Providence Office ↗ |