| Plumbing work within residences | allowance | 1 | — | $85,000 | $85,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Asbestos pipe remove | linear foot | 1 | — | $80.00 | $80.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Sewer Repairs | allowance | 1 | — | $25,000 | $25,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Additional Site Restoration from Curb Stop to Water Meter | allowance | 1 | — | $25,000 | $25,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Utility Coordination | allowance | 1 | — | $15,000 | $15,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Concrete sidewalk, walkways, and driveway aprons | square yard | 1 | — | $100.00 | $100.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Asphalt concrete driveway and sidewalk pavement | square yard | 1 | — | $100.00 | $100.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Permanent (final) asphalt concrete pavement | ton | 1 | — | $190.00 | $190.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Temporary (initial) asphalt concrete pavement | ton | 1 | — | $190.00 | $190.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and install 1-inch manual air release valve or blowoff assemblies for testing | each | 1 | — | $1,200 | $1,200 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Copper Private Service Pipe from the Curb Stop through the Foundation Wall to Water Meter (Existing Not Lead/Galvanized) | linear foot | 1 | — | $58.00 | $58.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Copper Public Service Pipe from Main to Curb Stop (Existing Not Lead/Galvanized) | linear foot | 1 | — | $90.00 | $90.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Curb Stops and Boxes (Existing Not Lead/Galvanized) | each | 1 | — | $770.00 | $770.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Corporation Stops and Taps (Existing Not Lead/Galvanized) | each | 1 | — | $520.00 | $520.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Copper Private Service Pipe from the Curb Stop through the Foundation Wall to Water Meter (Existing Lead/Galvanized) | linear foot | 1 | — | $58.00 | $58.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Copper Public Service Pipe from Main to Curb Stop (Existing Lead/Galvanized) | linear foot | 1 | — | $90.00 | $90.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Curb Stops and Boxes (Existing Lead/Galvanized) | each | 1 | — | $770.00 | $770.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 1-inch Corporation Stops and Taps (Existing | each | 1 | — | $520.00 | $520.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and InstallHydrant Assemblies | each | 1 | — | $15,000 | $15,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and install 4-inch gate valve | each | 1 | — | $2,000 | $2,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and install 8-inch gate valve | each | 1 | — | $3,000 | $3,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish and Install 4-inch Ductile Iron Water Main | linear foot | 1 | — | $100.00 | $100.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Test Pit Excavation, Backfill and Restoration | each | 1 | — | $1,000 | $1,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Earth excavation below grade and replace backfill | cubic yard | 1 | — | $1.00 | $1.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Traffic Control via Uniformed Police Officers | allowance | 1 | — | $168,000 | $168,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Replace of unsuitable material above pipe bedding and initial backfill | cubic yard | 1 | — | $1.00 | $1.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Ledge excavation, disposal, and replace backfill | cubic yard | 1 | — | $120.00 | $120.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Furnish AND Install 8-INCH Ductile Iron Water Main | linear foot | 1 | — | $120.00 | $120.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Additional ductile iron fitting | pound | 1 | — | $1.00 | $1.00 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Erosion Control | ls | 1 | — | $20,000 | $20,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Traffic Control | ls | 1 | — | $50,000 | $50,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |
| Mobilization/Demobilization | ls | 1 | — | $60,000 | $60,000 | Apr 15, 2026, Open bid tab, Pase I Lead Gooseneck Replacements and ↗ |