| Remove and Reset Curb | linear foot | 2 | — | $40.00 | $10.00 – $40.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Price adjust hot mix asphalt | allow | 2 | — | $500.00 | $500.00 – $1,000 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Price adjust gasoline fuel | allow | 2 | — | $500.00 | $500.00 – $1,000 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Price adjust desiel fuel | allow | 2 | — | $500.00 | $500.00 – $1,000 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Mechanical Sweeping | day | 2 | — | $0.01 | $0.01 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 2 inch pipe insulation | linear foot | 2 | — | $5.00 | $0.01 – $5.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Test Pit Excavation and Backfill | each | 2 | — | $250.00 | $250.00 – $500.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Pavement Top Course | ton | 2 | — | $135.00 | $135.00 – $240.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Suitable Material to Replace Unsuitable Material | cubic yard | 2 | — | $40.00 | $0.01 – $40.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Unsuitable Material Excavation Below Grade | cubic yard | 2 | — | $0.01 | $0.01 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Trench Ledge Excavation | cubic yard | 2 | — | $50.00 | $50.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Remove and Relay Existing Utilities | linear foot | 2 | — | $80.00 | $0.01 – $80.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 1-Inch Curb Stops and Box | each | 2 | — | $230.00 | $230.00 – $500.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Di fitting | pound | 2 | — | $0.01 | $0.01 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 1 Inch Copper Service Pipe | linear foot | 2 | — | $35.00 | $15.00 – $35.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Hydrant Assemblies | each | 2 | — | $7,600 | $5,000 – $7,600 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 12 inch di water main | linear foot | 2 | — | $230.00 | $95.00 – $230.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 8 inch di water main | linear foot | 2 | — | $70.00 | $70.00 – $85.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 6 inch di water main | linear foot | 2 | — | $60.00 | $60.00 – $200.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 12 inch gate valve | each | 2 | — | $7,600 | $2,500 – $7,600 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 6 inch gate valve | each | 2 | — | $5,500 | $900.00 – $5,500 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| 8 inch gate valve | each | 2 | — | $6,000 | $1,500 – $6,000 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Temporary Pavement | ton | 2 | — | $200.00 | $200.00 – $240.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Mobilization and Demobilization | ls | 2 | — | $8,000 | $8,000 – $75,000 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Replace of traffic loops | each | 1 | — | $500.00 | $500.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Price adjust portland cement | allow | 1 | — | $500.00 | $500.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Police Detail Coordination | ls | 1 | — | $2,500 | $2,500 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Sidewalk Pavement | ton | 1 | — | $200.00 | $200.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Driveway and Apron Pavement | ton | 1 | — | $200.00 | $200.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |
| Police | allow | 1 | — | $125,000 | $125,000 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Traffic Control North Street | ls | 1 | — | $5,000 | $5,000 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Traffic Control Mt. Vernon Street | ls | 1 | — | $5,000 | $5,000 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Erosion Controls | ls | 1 | — | $5,000 | $5,000 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Temporary Water Mains - Mt. Vernon | ls | 1 | — | $65,000 | $65,000 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Temporary Water Mains - North Street | ls | 1 | — | $75,000 | $75,000 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Bitumionous sidewalk | ton | 1 | — | $0.01 | $0.01 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| Asphalt concrete driveway and aprons | ton | 1 | — | $0.01 | $0.01 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| 1-inch manual air release valve | each | 1 | — | $800.00 | $800.00 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| 1-inch Corporatoin Stops | each | 1 | — | $1,500 | $1,500 | Oct 7, 2020, Open bid tab, 11698_20357_Bid_Tab.pdf ↗ |
| 10 inch di water main | linear foot | 1 | — | $90.00 | $90.00 | Jan 26, 2022, Open bid tab, 13689_14297_Bid_Tab.pdf ↗ |