| Mobilization | ls | 749 | — | $80,146 | $0.01 – $948,837 | Aug 1, 2002, Open the source page, contract 2581 |
| Sign Day | each | 210 | $0.58 | $0.21 | $0.04 – $10.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Barricade, Type III | bday | 209 | $2.00 | $1.67 | $0.2 – $11.50 | Aug 1, 2002, Open the source page, contract 2581 |
| Type B High Intensity Warning Light | lday | 201 | $2.25 | $0.79 | $0.23 – $10.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Flagging | day | 156 | $175.00 | $359.51 | $1.00 – $364.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Temporary Sign Day | each | 136 | $5.00 | $6.30 | $0.26 – $20.00 | Aug 1, 2002, Open the source page, contract 2581 |
| General Clearing and Grubbing | ls | 121 | $3,000 | $52,461 | $100.00 – $101,000 | Aug 1, 2002, Open the source page, contract 2581 |
| Barricade, Type II | bday | 115 | $0.5 | $0.2 | $0.2 – $1.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Field Office | each | 111 | $1,500 | $1,355 | $1.00 – $7,273 | Aug 1, 2002, Open the source page, contract 2581 |
| Water | kl | 107 | $2.50 | $2.10 | $0.01 – $20.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Rental of Skid Loader, Fully Operated | hour | 92 | $45.00 | $83.94 | $20.00 – $100.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Rental of Loader, Fully Operated | hour | 92 | $65.00 | $104.92 | $40.00 – $121.93 | Aug 1, 2002, Open the source page, contract 2581 |
| Rental of Dump Truck, Fully Operated | hour | 91 | $50.00 | $78.69 | $30.00 – $150.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Abutment NO.2 Excavation | ls | 88 | $4,000 | $2,542 | $500.00 – $22,297 | Aug 1, 2002, Open the source page, contract 2581 |
| Abutment NO.1 Excavation | ls | 88 | $4,000 | $2,542 | $500.00 – $22,297 | Aug 1, 2002, Open the source page, contract 2581 |
| Water | thousand gallons | 80 | $9.15 | $6.79 | $1.00 – $31.95 | Aug 1, 2002, Open the source page, contract 2928X |
| Bridge Approach Sections | each | 78 | $1,100 | $1,382 | $880.00 – $1,800 | Aug 1, 2002, Open the source page, contract 2581 |
| Rental of Motor Grader, Fully Operated | hour | 66 | $60.00 | $65.00 | $41.00 – $93.65 | Aug 1, 2002, Open the source page, contract 5046 |
| Class 47BD-4000 Concrete for Bridge | cubic yard | 64 | $405.00 | $425.00 | $150.88 – $3,200 | Aug 1, 2002, Open the source page, contract 4975X |
| Class 47BD-30 Concrete for Bridge | m3 | 57 | $430.00 | $372.12 | $272.33 – $6,315 | Aug 1, 2002, Open the source page, contract 2581 |
| Excavation (Established Quantity) | m3 | 56 | $4.00 | $3.15 | $1.12 – $100.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Class 47B-20 Concrete for Bridge | m3 | 55 | $420.00 | $307.84 | $299.60 – $825.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Mailbox Post | each | 55 | $50.00 | $50.00 | $40.00 – $125.00 | Aug 1, 2002, Open the source page, contract 5046 |
| Furnishing and Operating Pilot Vehicle | day | 54 | $262.50 | $1.00 | $1.00 – $700.00 | Aug 1, 2002, Open the source page, contract 3903A |
| Excavation for pipe, pipe-arch culvert, and headwalls | m3 | 53 | $10.16 | $0.53 | $0.53 – $100.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Earth Shoulder Construction | stam | 49 | $208.00 | $314.77 | $80.00 – $2,950 | Aug 1, 2002, Open the source page, contract 2581 |
| Flashing Arrow Panel | day | 45 | $30.00 | $11.12 | $1.00 – $300.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Mulching | thousand gallons | 45 | $80.00 | $69.25 | $55.00 – $250.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Riprap Filter Fabric | m2 | 45 | $2.55 | $0.91 | $0.91 – $35.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Remove headwalls from culvert | each | 45 | $150.00 | $127.00 | $50.00 – $500.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Asphalt Pavement Smoothness Testing | ls | 44 | $3,500 | $1,500 | $600.00 – $45,000 | May 23, 2002, Open the source page, contract 1624X |
| Epoxy coated reinforced steel for pavement approaches | kg | 44 | $1.33 | $1.24 | $1.10 – $2.25 | Aug 1, 2002, Open the source page, contract 2581 |
| Concrete FOR Pavement Approaches Class 47BD-30 | m3 | 44 | $231.89 | $231.89 | $184.43 – $425.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Tack Coat | gallon | 44 | $0.85 | $1.50 | $0.1 – $1.72 | Aug 1, 2002, Open the source page, contract 4975X |
| Epoxy coated reinforced steel | kg | 43 | $1.33 | $1.24 | $1.20 – $2.50 | Aug 1, 2002, Open the source page, contract 2581 |
| Seeding, Type B | ha | 43 | $1,152 | $849.00 | $747.00 – $10,563 | Aug 1, 2002, Open the source page, contract 2581 |
| Rock Riprap, Type B | thousand gallons | 42 | $31.00 | $19.00 | $15.23 – $75.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Structure steel for substructure | kg | 42 | $5.00 | $2.75 | $2.04 – $9.00 | Aug 1, 2002, Open the source page, contract 2581 |
| Earth Shoulder Construction | station | 41 | $55.00 | $350.00 | $10.00 – $350.00 | Aug 1, 2002, Open the source page, contract 4975X |
| Excavation (Established Quantity) | cubic yard | 41 | $3.55 | $5.00 | $1.07 – $16.05 | Aug 1, 2002, Open the source page, contract 4975X |