| Gravel Pack | per foot | 1 | — | $108.00 | $108.00 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| 18-inch Diameter Pipe Size Stainless Steel Well Screen | per foot | 1 | — | $555.00 | $555.00 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| 48-Hour Combined Performance Testing | ls | 1 | — | $32,500 | $32,500 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| Well Screen Development | per hour | 1 | — | $225.00 | $225.00 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| 18-inch Diameter Casing - Left-in-Place | per foot | 1 | — | $195.00 | $195.00 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| 24-inch Diameter Casing - Driven | per foot | 1 | — | $825.00 | $825.00 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| Cement Bentonite Grout Sanitary Seals | per foot | 1 | — | $315.00 | $315.00 | Jul 16, 2026, Open bid tab, Tispaquin Replacement Wells/ 22303 ↗ |
| Sewer manhole -– replace | each | 1 | — | $15,000 | $15,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Epoxy/Polyurea Multi-Layer Liner | each | 1 | — | $5,450 | $5,450 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Cementitious Liner | each | 1 | — | $2,350 | $2,350 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Grout | each | 1 | — | $600.00 | $600.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Interior Chimney Seal | each | 1 | — | $600.00 | $600.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer manhole – frame and cover replace | each | 1 | — | $1,070 | $1,070 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Repair Pipe Seal | each | 1 | — | $725.00 | $725.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Point Repair on Wall Interior | each | 1 | — | $725.00 | $725.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Point Repair or Replace Bench and/or Channel | each | 1 | — | $1,500 | $1,500 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Manhole -– Point Repair on Chimney | each | 1 | — | $550.00 | $550.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer manhole -– mechanical root remove | each | 1 | — | $1,100 | $1,100 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– Lateral Liner | each | 1 | — | $5,200 | $5,200 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– CIPP Liner, 20-inch diameter | linear foot | 1 | — | $296.00 | $296.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– CIPP Liner, 15 - 18-inch diameter | linear foot | 1 | — | $90.00 | $90.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– CIPP Liner, 6 - 12-inch diameter | linear foot | 1 | — | $55.00 | $55.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– Excavated Point Repair 6-–15-inch diameter, 5 - 15 ft long | each | 1 | — | $8,000 | $8,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe – Short Line 18–24-inch diameter, 5-10 ft long | each | 1 | — | $9,000 | $9,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe – Short Line 6–15-inch diameter, 11-25 ft long | each | 1 | — | $7,000 | $7,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– Short Line 6–15-inch diameter, 5-10 ft long | each | 1 | — | $4,000 | $4,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer pipe -– mechanical root remove | linear foot | 1 | — | $0.01 | $0.01 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– Trim Lateral | each | 1 | — | $1,750 | $1,750 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Heavy Clean Pipe -– 8 -– 12-inch diameter | linear foot | 1 | — | $7.00 | $7.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe – Lateral CCTV Inspection | linear foot | 1 | — | $110.00 | $110.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Sewer Pipe -– CCTV 6–12 inch diameter | linear foot | 1 | — | $1.00 | $1.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Remove and disposal of excess soils | all | 1 | — | $15,000 | $15,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Management of Excess Soils | ls | 1 | — | $1,070 | $1,070 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Final Pavement (Surface Course) (1.5”) | ton | 1 | — | $250.00 | $250.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Initial Pavement (Binder Course) (2.5”) | ton | 1 | — | $250.00 | $250.00 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Uniformed Police Officers for Traffic Control | all | 1 | — | $94,000 | $94,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Mobilization and Demobilization (max 5% of total bid excluding allowances) | ls | 1 | — | $42,000 | $42,000 | Sep 25, 2025, Open bid tab, Sewer System Rehabilitation 21954 ↗ |
| Cast-in-place portland cement concrete price adjust. | ton | 1 | — | $1,000 | $1,000 | Feb 8, 2024, Open bid tab, CENTER&N MAIN ST WATER SYSTEM IMPROVEMENTS/ 21442 ↗ |
| Liquid asphalt price adjust the base price for liquid | ton | 1 | — | $1,000 | $1,000 | Feb 8, 2024, Open bid tab, CENTER&N MAIN ST WATER SYSTEM IMPROVEMENTS/ 21442 ↗ |
| Gasoline fuel price adjust the base price for gasoline is | gallon | 1 | — | $1,000 | $1,000 | Feb 8, 2024, Open bid tab, CENTER&N MAIN ST WATER SYSTEM IMPROVEMENTS/ 21442 ↗ |