Agency · awarded bid prices

MDOT: awarded unit prices

1,388,915 winning bid prices read from 20,417 source documents, 1999–2026. The table lists the 40 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › MDOT

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Minor traffic devicesls16,547—$43,870$0.01 – $26,299,233Sep 4, 2026, line 270 ↗
Sign, type b, temporary, prismatic, furnishsquare foot12,085$3.40$1.00$0 – $330.00Sep 4, 2026, line 290 ↗
Lighted arrow, type c, furnisheach11,914$325.00$200.00$0.001 – $10,000Sep 4, 2026, line 150 ↗
Lighted Arrow, Type C, Opereach11,909—$100.00$0.001 – $9,000Sep 4, 2026, line 155 ↗
Sign, type b, temporary, prismatic, opersquare foot11,872—$0.01$0 – $35.00Sep 4, 2026, line 295 ↗
Erosion Control, Silt Fencelinear foot7,903$2.00$3.75$0.01 – $200.00Sep 4, 2026, line 95 ↗
Mobilizationls7,724$64,400$56,300$0.01 – $33,156,000Sep 4, 2026, line 5 ↗
Sign Covereach7,586$20.00$15.00$0.001 – $470.80Sep 4, 2026, line 275 ↗
Pavement marking, waterborne, 4 inch, yellowlinear foot7,158$0.15$0.28$0.01 – $15.00Sep 4, 2026, line 390 ↗
Hot mix asphalt approachton6,997$98.34$148.26$0.01 – $2,000Sep 4, 2026, line 100 ↗
Excavation, Earthcubic yard6,859$10.00$80.00$0.01 – $500.00Sep 4, 2026, line 30 ↗
Hand patchton6,587$123.00$234.30$0.01 – $3,000Sep 4, 2026, line 95 ↗
Curb and gutter, removelinear foot6,471$7.50$28.00$0.01 – $396.98Sep 4, 2026, line 10 ↗
Pavement marking, waterborne, 4 inch, whitelinear foot6,410$0.14$0.28$0.01 – $40.00Sep 4, 2026, line 385 ↗
Pavement, removesquare yard5,824$9.00$38.00$0.01 – $1,550Sep 4, 2026, line 15 ↗
Plastic drum, high intensity, furnisheach5,733$15.00$14.00$0.001 – $250.00Sep 4, 2020, line 70 ↗
Plastic Drum, High Intensity, Opereach5,727—$1.00$0.01 – $3,153Sep 4, 2020, line 80 ↗
Sidewalk, removesquare yard5,619$8.68$38.00$0.01 – $700.00Sep 4, 2026, line 20 ↗
Flag Controlls5,597—$2,500$0.01 – $1,590,000Sep 7, 2012, Open bid tab, 47065-101619 ↗
Dr structure cover, adjust, case 1each5,493$400.00$850.00$0.01 – $5,000Sep 4, 2026, line 45 ↗
Barricade, type iii, high intensity, double sided, lighted, furnisheach5,470$70.00$180.00$0.001 – $1,564Sep 4, 2026, line 440 ↗
Cold milling hot mix asphalt surfacesquare yard5,470$1.80$1.37$0.01 – $145.10Sep 4, 2026, line 65 ↗
Barricade, Type Iii, High Intensity, Double Sided, Lighted, Opereach5,466—$5.00$0.001 – $966.90Sep 4, 2026, line 445 ↗
Traffic regulator controlls5,263—$10,955$0.01 – $6,401,000Sep 4, 2026, line 300 ↗
Erosion Control, Inlet Protection, Fabric Dropeach5,207$100.00$175.00$0.01 – $800.00Sep 4, 2026, line 40 ↗
Sign, type iii, removeeach5,162$15.00$50.00$0.01 – $1,164Sep 4, 2026, line 160 ↗
Embankment, CIPcubic yard4,942$8.90$75.00$0.01 – $500.00Sep 4, 2026, line 25 ↗
Hot mix asphalt surface, removesquare yard4,904$5.15$38.00$0.01 – $540.76Sep 4, 2026, line 75 ↗
Subbase, CIPcubic yard4,824$12.70$43.75$0.001 – $500.00Sep 4, 2026, line 100 ↗
Sign, Type Iiibsquare foot4,739$15.50$19.00$0.01 – $202.00Sep 4, 2026, line 170 ↗
Guardrail Reflectoreach4,696$5.00$8.00$1.00 – $605.00Sep 4, 2026, line 225 ↗
Barricade, Type Iii, High Intensity, Lighted, Opereach4,647—$5.00$0.001 – $535.00Nov 5, 2021, line 210 ↗
Barricade, type iii, high intensity, lighted, furnisheach4,647$75.00$80.00$0.01 – $1,500Nov 5, 2021, line 200 ↗
Post, Steel, 3 Lblinear foot4,531$5.00$7.00$0.01 – $601.00May 11, 2022, line 75 ↗
Sidewalk, concrete, 4 inchsquare foot4,430$3.75$6.00$0.01 – $350.00Sep 4, 2026, line 65 ↗
Pavement marking, overlay cold plastic, 24 inch, stop barlinear foot4,043$9.65$20.00$0.1 – $320.40Sep 4, 2026, line 190 ↗
Plastic Drum, High Intensity, Lighted, Opereach4,006—$0.61$0.001 – $2,500Aug 7, 2020, line 700 ↗
Plastic drum, high intensity, lighted, furnisheach4,004$16.50$20.13$0 – $125.00Aug 7, 2020, line 690 ↗
Dr structure, removeeach3,975$300.00$497.70$0.01 – $7,500Sep 4, 2026, line 30 ↗
Pavement marking, overlay cold plastic, lt turn arrow symboleach3,972$120.00$275.00$1.00 – $450.00Sep 4, 2026, line 195 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.

More prices in Michigan: statewide figures.