| Minor traffic devices | ls | 16,547 | — | $43,870 | $0.01 – $26,299,233 | Sep 4, 2026, line 270 ↗ |
| Sign, type b, temporary, prismatic, furnish | square foot | 12,085 | $3.40 | $1.00 | $0 – $330.00 | Sep 4, 2026, line 290 ↗ |
| Lighted arrow, type c, furnish | each | 11,914 | $325.00 | $200.00 | $0.001 – $10,000 | Sep 4, 2026, line 150 ↗ |
| Lighted Arrow, Type C, Oper | each | 11,909 | — | $100.00 | $0.001 – $9,000 | Sep 4, 2026, line 155 ↗ |
| Sign, type b, temporary, prismatic, oper | square foot | 11,872 | — | $0.01 | $0 – $35.00 | Sep 4, 2026, line 295 ↗ |
| Erosion Control, Silt Fence | linear foot | 7,903 | $2.00 | $3.75 | $0.01 – $200.00 | Sep 4, 2026, line 95 ↗ |
| Mobilization | ls | 7,724 | $64,400 | $56,300 | $0.01 – $33,156,000 | Sep 4, 2026, line 5 ↗ |
| Sign Cover | each | 7,586 | $20.00 | $15.00 | $0.001 – $470.80 | Sep 4, 2026, line 275 ↗ |
| Pavement marking, waterborne, 4 inch, yellow | linear foot | 7,158 | $0.15 | $0.28 | $0.01 – $15.00 | Sep 4, 2026, line 390 ↗ |
| Hot mix asphalt approach | ton | 6,997 | $98.34 | $148.26 | $0.01 – $2,000 | Sep 4, 2026, line 100 ↗ |
| Excavation, Earth | cubic yard | 6,859 | $10.00 | $80.00 | $0.01 – $500.00 | Sep 4, 2026, line 30 ↗ |
| Hand patch | ton | 6,587 | $123.00 | $234.30 | $0.01 – $3,000 | Sep 4, 2026, line 95 ↗ |
| Curb and gutter, remove | linear foot | 6,471 | $7.50 | $28.00 | $0.01 – $396.98 | Sep 4, 2026, line 10 ↗ |
| Pavement marking, waterborne, 4 inch, white | linear foot | 6,410 | $0.14 | $0.28 | $0.01 – $40.00 | Sep 4, 2026, line 385 ↗ |
| Pavement, remove | square yard | 5,824 | $9.00 | $38.00 | $0.01 – $1,550 | Sep 4, 2026, line 15 ↗ |
| Plastic drum, high intensity, furnish | each | 5,733 | $15.00 | $14.00 | $0.001 – $250.00 | Sep 4, 2020, line 70 ↗ |
| Plastic Drum, High Intensity, Oper | each | 5,727 | — | $1.00 | $0.01 – $3,153 | Sep 4, 2020, line 80 ↗ |
| Sidewalk, remove | square yard | 5,619 | $8.68 | $38.00 | $0.01 – $700.00 | Sep 4, 2026, line 20 ↗ |
| Flag Control | ls | 5,597 | — | $2,500 | $0.01 – $1,590,000 | Sep 7, 2012, Open bid tab, 47065-101619 ↗ |
| Dr structure cover, adjust, case 1 | each | 5,493 | $400.00 | $850.00 | $0.01 – $5,000 | Sep 4, 2026, line 45 ↗ |
| Barricade, type iii, high intensity, double sided, lighted, furnish | each | 5,470 | $70.00 | $180.00 | $0.001 – $1,564 | Sep 4, 2026, line 440 ↗ |
| Cold milling hot mix asphalt surface | square yard | 5,470 | $1.80 | $1.37 | $0.01 – $145.10 | Sep 4, 2026, line 65 ↗ |
| Barricade, Type Iii, High Intensity, Double Sided, Lighted, Oper | each | 5,466 | — | $5.00 | $0.001 – $966.90 | Sep 4, 2026, line 445 ↗ |
| Traffic regulator control | ls | 5,263 | — | $10,955 | $0.01 – $6,401,000 | Sep 4, 2026, line 300 ↗ |
| Erosion Control, Inlet Protection, Fabric Drop | each | 5,207 | $100.00 | $175.00 | $0.01 – $800.00 | Sep 4, 2026, line 40 ↗ |
| Sign, type iii, remove | each | 5,162 | $15.00 | $50.00 | $0.01 – $1,164 | Sep 4, 2026, line 160 ↗ |
| Embankment, CIP | cubic yard | 4,942 | $8.90 | $75.00 | $0.01 – $500.00 | Sep 4, 2026, line 25 ↗ |
| Hot mix asphalt surface, remove | square yard | 4,904 | $5.15 | $38.00 | $0.01 – $540.76 | Sep 4, 2026, line 75 ↗ |
| Subbase, CIP | cubic yard | 4,824 | $12.70 | $43.75 | $0.001 – $500.00 | Sep 4, 2026, line 100 ↗ |
| Sign, Type Iiib | square foot | 4,739 | $15.50 | $19.00 | $0.01 – $202.00 | Sep 4, 2026, line 170 ↗ |
| Guardrail Reflector | each | 4,696 | $5.00 | $8.00 | $1.00 – $605.00 | Sep 4, 2026, line 225 ↗ |
| Barricade, Type Iii, High Intensity, Lighted, Oper | each | 4,647 | — | $5.00 | $0.001 – $535.00 | Nov 5, 2021, line 210 ↗ |
| Barricade, type iii, high intensity, lighted, furnish | each | 4,647 | $75.00 | $80.00 | $0.01 – $1,500 | Nov 5, 2021, line 200 ↗ |
| Post, Steel, 3 Lb | linear foot | 4,531 | $5.00 | $7.00 | $0.01 – $601.00 | May 11, 2022, line 75 ↗ |
| Sidewalk, concrete, 4 inch | square foot | 4,430 | $3.75 | $6.00 | $0.01 – $350.00 | Sep 4, 2026, line 65 ↗ |
| Pavement marking, overlay cold plastic, 24 inch, stop bar | linear foot | 4,043 | $9.65 | $20.00 | $0.1 – $320.40 | Sep 4, 2026, line 190 ↗ |
| Plastic Drum, High Intensity, Lighted, Oper | each | 4,006 | — | $0.61 | $0.001 – $2,500 | Aug 7, 2020, line 700 ↗ |
| Plastic drum, high intensity, lighted, furnish | each | 4,004 | $16.50 | $20.13 | $0 – $125.00 | Aug 7, 2020, line 690 ↗ |
| Dr structure, remove | each | 3,975 | $300.00 | $497.70 | $0.01 – $7,500 | Sep 4, 2026, line 30 ↗ |
| Pavement marking, overlay cold plastic, lt turn arrow symbol | each | 3,972 | $120.00 | $275.00 | $1.00 – $450.00 | Sep 4, 2026, line 195 ↗ |