Agency · awarded bid prices

Manchester-By-The-Sea, MA: awarded unit prices

18 winning bid prices read from 1 source documents, 2025. The table lists the 18 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Manchester-By-The-Sea, MA

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Workallow1—$10,000$10,000Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and install new meter pits for 5/8 inch-2 inch meters and 11 miuseach1—$2,500$2,500Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Meter Pit Installationseach1—$170.00$170.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Couplings and Connectorseach1—$25.00$25.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and install 2 inch ball valveeach1—$475.00$475.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and install 1.5 inch ball valveeach1—$325.00$325.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and install 1 inch ball valveeach1—$145.00$145.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and install 3/4 inch ball valveeach1—$105.00$105.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and install 5/8 inch ball valveeach1—$50.00$50.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Furnish and Install Service Pipelinear foot1—$35.00$35.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Non-Standard Workhourly1—$180.00$180.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install secondary water meters & meter interface units (miu) sized 1.5 inch-2 incheach1—$220.00$220.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install secondary water meters & meter interface units (miu) sized 3/4 inch-1 incheach1—$96.00$96.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install water meters & meter interface units (miu) sized 2 incheach1—$275.00$275.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install water meters & meter interface units (miu) sized 1.5 incheach1—$275.00$275.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install water meters & meter interface units (miu) sized 1 incheach1—$118.00$118.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install water meters & meter interface units (miu) sized 3/4 incheach1—$118.00$118.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗
Install water meters & meter interface units (miu) sized 5/8 incheach1—$118.00$118.00Jul 16, 2025, Open bid tab, Advanced Meter Infrastructure (AMI) FY 25 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.