| Tack Coat For Intermediate Course, 0.06 Gal./S.Y. | gallon | 2 | — | $11.90 | $11.90 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Concrete Walk Replaced, In Kind | square foot | 2 | — | $11.47 | $11.32 – $11.47 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 1-1/2 inch asphalt concrete, surface course, type 1, pg 64-22 (448) | cubic yard | 2 | — | $339.15 | $339.15 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Seeding And Mulching, Class I, As Per Plan | square yard | 2 | — | $9.41 | $9.41 – $9.51 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 6 inch non-reinforced concrete pavement, as per plan | square yard | 2 | — | $99.05 | $92.69 – $99.05 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Clearing And Grubbing, As Per Plan | ls | 2 | — | $16,148 | $10,793 – $16,148 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 1-3/4 inch asphalt concrete intermediate course, type 2 (448) | cubic yard | 2 | — | $327.25 | $327.25 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Aggregate Base, As Per Plan | cubic yard | 2 | — | $25.00 | $25.00 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Subgrade Compaction, As Per Plan | square yard | 2 | — | $0.61 | $0.61 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Removed, As Per Plan | ls | 2 | — | $70,305 | $12,585 – $70,305 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Lateral Connection Permit Fees | each | 1 | — | $191.67 | $191.67 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Remove And Replace Porch And Step, In-Kind | square foot | 1 | — | $35.68 | $35.68 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Wall Removed And Rebuilt, In-Kind | linear foot | 1 | — | $77.92 | $77.92 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 6 inch sanitary lateral service connection, as per plan | linear foot | 1 | — | $38.42 | $38.42 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 4 inch sanitary lateral service connection, as per plan | linear foot | 1 | — | $25.91 | $25.91 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Brick Walk Replaced, In-Kind | square foot | 1 | — | $23.31 | $23.31 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Septic Tank Removed | each | 1 | — | $684.85 | $684.85 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Utility Marking Crossing | each | 1 | — | $104.13 | $104.13 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Electric Service, Pump Station | each | 1 | — | $28,762 | $28,762 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Electric Service, Grinder Pump, Type 3 | each | 1 | — | $2,975 | $2,975 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Electric Service, Grinder Pump, Type 2 | each | 1 | — | $6,669 | $6,669 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Electric Service, Grinder Pump, Type 1 | each | 1 | — | $3,451 | $3,451 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Pump Station (Suction Lift) | each | 1 | — | $143,125 | $143,125 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Grinder Pump Stations, Type 3 | each | 1 | — | $20,932 | $20,932 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Grinder Pump Stations, Type 2 | each | 1 | — | $13,024 | $13,024 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Grinder Pump Stations, Type 1 | each | 1 | — | $11,356 | $11,356 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Church Camp Existing Treatment System To Be Abandoned | ls | 1 | — | $10,985 | $10,985 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Spec. Rock Excavation | cubic yard | 1 | — | $98.77 | $98.77 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Curb Valve And Box, As Per Plan | each | 1 | — | $565.25 | $565.25 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Conduit, jacked or drilled, 725.052, 2 inch, as per plan | linear foot | 1 | — | $12.47 | $12.47 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Conduit, 725.051, 3 inch, as per plan | linear foot | 1 | — | $16.98 | $16.98 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Asphalt Concrete For Maintaining Traffic | cubic yard | 1 | — | $314.18 | $314.18 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| Air Release Valve Chamber, As Per Plan | each | 1 | — | $7,150 | $7,150 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 2 inch hdpe sanitary sewer forcemain, for service, as per plan | linear foot | 1 | — | $12.57 | $12.57 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 1-1/2 inch hdpe sanitary sewer forcemain, for service, as per plan | linear foot | 1 | — | $14.01 | $14.01 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 14 inch hdpe casing pipe install by horizontal directional drilling, as per plan | linear foot | 1 | — | $111.77 | $111.77 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 10 inch hdpe casing pipe install by horizontal directional drilling, as per plan | linear foot | 1 | — | $75.95 | $75.95 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 6 inch hdpe sanitary sewer forcemain install by horizontal directional drilling through rock, as per plan | linear foot | 1 | — | $87.98 | $87.98 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 6 inch conduit, type b, 707.12, storm repair | linear foot | 1 | — | $19.34 | $19.34 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |
| 18 inch conduit, type b, 707.33, storm repair | linear foot | 1 | — | $13.51 | $13.51 | Jun 11, 2020, Open bid tab, bidtabmialfa1501pdf ↗ |