Livermore Falls, ME: awarded unit prices

96 winning bid prices read from 4 source documents, 2024. The table lists the 28 items this agency awarded most often. Winning bids only; every row links to a bid tabulation.

Cost by state › Agencies › Livermore Falls, ME

ItemPerWinning bidsMedianLatest awardLowest – highestLatest source document
Excavation of unsuitable material below pipe bedding and replace backfillcubic yard4—$75.00$75.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
1-Inch Corporation Stop and Tapeach4—$400.00$250.00 – $400.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
1-inch CTS Plastic Water Service Pipeeach4—$2,500$85.00 – $2,500Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
2-inch Blowoff Assemblylinear foot4—$85.00$85.00 – $4,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
6-inch Ductile Iron Water Maineach4—$4,000$100.00 – $4,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Abandon Existing Water Mains in Placelinear foot4—$10.00$10.00 – $1,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Test Pit Excavation and Backfillls4—$1,000$500.00 – $1,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Granite Curb – Remove and Reseteach4—$500.00$50.00 – $500.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Asphalt curb – restorelinear foot4—$50.00$4.00 – $50.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
12.5 mm Base Pavementlinear foot4—$4.00$4.00 – $250.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Ledge/boulder excavation and replace backfillcubic yard4—$50.00$50.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Erosion and sediment control and maintenance; site preparationls4—$15,000$15,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Traffic Regulation and Controlls4—$15,000$15,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
12.5 mm Surface Pavementton4—$250.00$250.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Pipe Trench Insulationlinear foot4—$160.00$10.00 – $160.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
8 inch ductile iron water mainlinear foot4—$100.00$100.00 – $160.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
8 inch gate valve and boxeach4—$2,000$2,000 – $2,500Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
6 inch gate valve and boxeach4—$250.00$250.00 – $2,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Pavement removesquare yard4—$10.00$10.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Mobilization/Demobilizationls4—$15,000$15,000Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Replace of unsuitable material above pipe bedding and initial backfillsquare yard3—$50.00$50.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
1-Inch Curb Stop and Boxcubic yard3—$75.00$75.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
(sidewalk and drives)ton3—$250.00$250.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
9.5 mm Surface Pavementton3—$250.00$250.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
9.5 mm surface pavement (sidewalk and drives)ton1—$250.00$250.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Replace of unsuitable material above pipe bedding and initial backfillcubic yard1—$75.00$75.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
Loaming and Seedingsquare yard1—$50.00$50.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗
1 inch curb stop and boxeach1—$400.00$400.00Mar 20, 2024, Open bid tab, Knapp Street Water Main/21671 ↗

These are prices this agency awarded, not quotes, and are not adjusted for quantity, location or timing. A median appears from 5 winning bids when the prices are consistent; otherwise the row shows the latest award and the range.