| Mobilization | ls | 2,303 | — | $11,000 | $0.01 – $5,900,000 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Traffic Control | ls | 2,044 | — | $9,500 | $1.00 – $1,025,000 | Oct 20, 2026, contract 00-000T-474 ↗ |
| Paint pavement marking, waterborne or solvent-based | station | 838 | — | $80.00 | $7.60 – $3,600 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Flaggers | each | 825 | $575.00 | $660.00 | $575.00 – $1,035 | Oct 20, 2026, contract 09-0036-073 ↗ |
| Safety Closure | each | 706 | $170.00 | $100.00 | $25.00 – $2,500 | Oct 20, 2026, contract 17-0658-082 ↗ |
| Construction Survey | ls | 664 | $8,000 | $6,000 | $1.00 – $238,000 | Apr 21, 2026, contract 24-1413-501 ↗ |
| Remove of pavement | square yard | 648 | $15.00 | $24.12 | $1.50 – $800.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Remove of perimeter and slope or ditch check sediment control device | linear foot | 547 | $0.3 | $0.3 | $0.01 – $7.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Engineering Fabric | square yard | 531 | $3.50 | $4.25 | $0.01 – $25.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Excavation, Class 20 | cubic yard | 525 | $26.00 | $5.59 | $3.50 – $1,000 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Revetment, Class E | ton | 515 | $60.25 | $99.89 | $18.00 – $250.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Topsoil, Strip, Salvage and Spread | cubic yard | 504 | $8.00 | $11.18 | $2.10 – $300.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Perimeter and slope sediment control device, 12 in. diameter. | linear foot | 495 | $3.00 | $2.35 | $0.01 – $25.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Excavation, Class 10, Roadway and Borrow | cubic yard | 487 | $8.75 | $7.80 | $1.93 – $115.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Mobilizations Erosion Control | each | 446 | $600.00 | $600.00 | $600.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Pilot Cars | each | 440 | $865.00 | $990.00 | $865.00 – $1,350 | Oct 20, 2026, contract 14-0303-718 ↗ |
| Granular shoulder, type b | ton | 430 | $33.62 | $28.00 | $5.00 – $1,000 | Oct 20, 2026, contract 37-0303-057 ↗ |
| Silt Fence | linear foot | 426 | $2.00 | $4.00 | $0.01 – $9.60 | Oct 20, 2026, contract 37-0303-057 ↗ |
| Grooves cut for pavement marking | station | 417 | $35.00 | $80.00 | $10.00 – $3,200 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Reinforced steel (epoxy coated) | pound | 415 | $1.65 | $1.57 | $0.7 – $51.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Maintenance of Silt Fence or Silt Fence for Ditch Check | linear foot | 392 | — | $0.1 | $0.01 – $10.00 | Oct 20, 2026, contract 37-0303-057 ↗ |
| Steel Beam Guardrail End Anchor, Bolted | each | 373 | $306.00 | $300.00 | $37.00 – $1,000 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Mobilizations, Emergency Erosion Control | each | 372 | $1,200 | $1,200 | $1,200 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Modified Subbase | cubic yard | 371 | $56.00 | $130.00 | $0.3 – $200.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Remove of steel beam guardrail | linear foot | 369 | $10.00 | $5.00 | $2.00 – $40.00 | Oct 20, 2026, contract 00-000T-233 ↗ |
| Mulching | acre | 367 | $750.00 | $1,200 | $100.00 – $87,500 | Oct 20, 2026, contract 49-0621-031 ↗ |
| Portable Dynamic Message Sign (Pdms) | day | 358 | $100.00 | $50.00 | $5.00 – $550.00 | Oct 20, 2026, contract 37-0303-057 ↗ |
| Clearing AND Grubbing | acre | 357 | $10,000 | $25,000 | $460.00 – $250,000 | Oct 20, 2026, contract 46-1697-049 ↗ |
| Steel Beam Guardrail | linear foot | 349 | $30.00 | $35.00 | $18.00 – $100.00 | Oct 20, 2026, contract 00-000T-233 ↗ |
| Shoulder Construction, Earth | station | 349 | $400.00 | $1,141 | $1.00 – $10,000 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Remove of silt fence or silt fence for ditch checks | linear foot | 338 | — | $0.25 | $0.01 – $3.00 | Oct 20, 2026, contract 37-0303-057 ↗ |
| Seeding and Fertilizing (Rural) | acre | 335 | $1,015 | $1,200 | $400.00 – $87,500 | Oct 20, 2026, contract 49-0621-031 ↗ |
| Pavement marking removed | station | 330 | $80.00 | $80.00 | $0.01 – $2,000 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Hot MIX Asphalt Pavement Samples | ls | 327 | $3,000 | $3,825 | $89.00 – $29,100 | Oct 20, 2026, contract 48-1492-066 ↗ |
| Removals, as per Plan | ls | 323 | — | $10,750 | $400.00 – $1,265,000 | Oct 20, 2026, contract 09-0036-073 ↗ |
| Remove of existing bridge | ls | 313 | — | $31,223 | $1,000 – $650,000 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Embankment in Place | cubic yard | 309 | $22.00 | $16.79 | $3.00 – $200.00 | Oct 20, 2026, contract 02-0343-039 ↗ |
| Steel Beam Guardrail Barrier Transition Section, BA-201 | each | 302 | $3,200 | $3,000 | $1,800 – $6,820 | Oct 20, 2026, contract 00-000T-233 ↗ |
| Excavation, Class 13, Waste | cubic yard | 301 | $25.00 | $33.75 | $1.75 – $275.00 | Oct 20, 2026, contract 09-0036-073 ↗ |
| Steel Beam Guardrail Tangent End Terminal, BA-205 | each | 301 | $3,500 | $4,500 | $500.00 – $6,500 | Oct 20, 2026, contract 00-000T-233 ↗ |