| 10”x12” Reducer | each | 2 | — | $770.00 | $770.00 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 22.5 DI MJ Bend | each | 2 | — | $866.56 | $866.56 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 11.25 DI MJ Bend | each | 2 | — | $840.14 | $840.14 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 45 DI MJ Bend | each | 2 | — | $968.72 | $968.72 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12x2” Service Saddle | each | 2 | — | $259.11 | $259.11 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| Flanged valve box w/ cap | each | 2 | — | $231.00 | $231.00 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 2-inch Curb Stops and Box | each | 2 | — | $763.87 | $763.87 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 1-Inch Curb Stops and Box | each | 2 | — | $305.68 | $305.68 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 8-inch Ductile Iron | linear foot | 2 | — | $48.01 | $48.01 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12 inch solid sleeve | each | 2 | — | $832.22 | $832.22 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 10 inch solid sleeve | each | 2 | — | $647.03 | $647.03 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 1 inch copper service | linear foot | 2 | — | $14.17 | $14.17 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| _ 12 inch x 6 inch Tee | each | 2 | — | $2,740 | $2,740 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 1 Inch Corporation | each | 2 | — | $118.00 | $118.00 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 2 Inch Corporation | each | 2 | — | $409.42 | $409.42 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 8 inch cap | each | 2 | — | $263.81 | $263.81 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12 Inch CAP | each | 2 | — | $434.16 | $434.16 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12 inch ductile iron water main | linear foot | 2 | — | $68.44 | $68.44 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 10 inch ductile iron water main | linear foot | 2 | — | $53.47 | $53.47 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12”x12” Tee | each | 2 | — | $1,519 | $1,519 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12”x8” Tee | each | 2 | — | $1,189 | $1,189 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 6 inch ductile iron water main | linear foot | 2 | — | $28.91 | $28.91 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 12 inch gate valve | each | 2 | — | $3,370 | $3,370 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| Hydrant | each | 2 | — | $3,597 | $3,597 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 8 inch gate valve | each | 2 | — | $1,729 | $1,729 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| 6 inch gate valve | each | 2 | — | $1,069 | $1,069 | Aug 13, 2024, Open bid tab, Phase 2 Water Main Replacement / 21608 ↗ |
| Tree Clearing | ls | 1 | — | $116,575 | $116,575 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Wetlands Restoration | allow | 1 | — | $50,000 | $50,000 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| 2-inch Rigid Board Insulation | linear foot | 1 | — | $6.59 | $6.59 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| 19 mm asphalt concrete pavement | ton | 1 | — | $296.67 | $296.67 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| 12.5 mm asphalt concrete pavement | ton | 1 | — | $313.85 | $313.85 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 2-inch CTS Water Service | each | 1 | — | $8,234 | $8,234 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install Hydrant Assembly | each | 1 | — | $2,077 | $2,077 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 6-inch Gate Valve and Valve Box | each | 1 | — | $1,081 | $1,081 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 8-inch Gate Valve and Valve Box | each | 1 | — | $1,351 | $1,351 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 12-inch Gate Valve and Valve Box | each | 1 | — | $1,351 | $1,351 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 6-inch Ductile Iron Main | linear foot | 1 | — | $195.51 | $195.51 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 8-inch Ductile Iron Main | linear foot | 1 | — | $284.33 | $284.33 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 10-inch Ductile Iron Main | linear foot | 1 | — | $452.07 | $452.07 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |
| Install 12-inch Ductile Iron Main | linear foot | 1 | — | $83.86 | $83.86 | Dec 2, 2025, Open bid tab, Phase II Water Main: Material Installation (2025-2) / 22106 ↗ |