| Furnish & Install Fence | linear foot | 1 | — | $60.00 | $60.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Trash & Recycling Receptacles | each | 1 | — | $2,000 | $2,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Bike Rack (U style) | each | 1 | — | $1,500 | $1,500 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Allowance for Landscaping | allow | 1 | — | $25,000 | $25,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install Pedestrian Actuated Flashing Beacon | each | 1 | — | $20,000 | $20,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install traffic sign | square foot | 1 | — | $20.00 | $20.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Excavation of unsuitable material and replace backfill - trench | cubic yard | 1 | — | $50.00 | $50.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Reconnection to existing structure | each | 1 | — | $5,000 | $5,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install 5' Diameter Drain Manhole | vf | 1 | — | $900.00 | $900.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install 4' Diameter Catch Basin | vf | 1 | — | $800.00 | $800.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install 24 inch hdpe storm drain | linear foot | 1 | — | $175.00 | $175.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install 18 inch hdpe storm drain | linear foot | 1 | — | $150.00 | $150.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install 15 inch hdpe storm drain | linear foot | 1 | — | $150.00 | $150.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install marking & symbols | square foot | 1 | — | $6.00 | $6.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install crosswalk stripe | linear foot | 1 | — | $4.00 | $4.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install 4 inch wide pavement stripe | linear foot | 1 | — | $2.00 | $2.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install Stop Bars | linear foot | 1 | — | $5.00 | $5.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Detectable Warning Device | square yard | 1 | — | $150.00 | $150.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install concrete sidewalk and ramp | square yard | 1 | — | $80.00 | $80.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Remove and Reset Vertical Granite Curb | linear foot | 1 | — | $50.00 | $50.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install hot asphalt pavement: hand placed | ton | 1 | — | $200.00 | $200.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and install hot asphalt pavement: machine placed | ton | 1 | — | $100.00 | $100.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install Crushed Stone (Supplemental Gravel) | cubic yard | 1 | — | $45.00 | $45.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Remove and Dispose of Existing Sidewalk | square yard | 1 | — | $10.00 | $10.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Pavement Reclamation | square yard | 1 | — | $10.00 | $10.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Test Pit Excavation and Backfill | cubic yard | 1 | — | $100.00 | $100.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Allowance: Uniformed Police Officers for Traffic Control | allow | 1 | — | $125,000 | $125,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Development and Monitoring of Stormwater Pollution Prevention Plan | ls | 1 | — | $15,000 | $15,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Mobilization and Demobilization (2% max) | ls | 1 | — | $39,000 | $39,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install Vertical Granite Curb | linear foot | 1 | — | $65.00 | $65.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Remove and disposal of asbestos cement pipe | linear foot | 1 | — | $50.00 | $50.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Pavement Milling | square yard | 1 | — | $20.00 | $20.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Furnish and Install 12” HDPE Storm Drain | linear foot | 1 | — | $150.00 | $150.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Traffic Regulation and Control | ls | 1 | — | $20,000 | $20,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Loam & Seed | square yard | 1 | — | $5.50 | $5.50 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Trench Ledge Excavation | cubic yard | 1 | — | $150.00 | $150.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Erosion and sediment control | ls | 1 | — | $15,000 | $15,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Vibration Monitoring | ls | 1 | — | $1,000 | $1,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Flowable Fill | cubic yard | 1 | — | $200.00 | $200.00 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |
| Bench | each | 1 | — | $2,000 | $2,000 | Feb 6, 2020, Open bid tab, 5253_LafayetteRoad-Bid-Tab-1.pdf ↗ |