| Highway sign, tp 1 material, reflective sheeting, tp 9 | square foot | 3 | — | $25.00 | $19.00 – $110.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Relocation And/Or Reconnection Of Existing Fire Hydrants | each | 2 | — | $10,500 | $1,800 – $10,500 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Thermoplastic solid traffic stripe, 8 in, white | linear foot | 2 | — | $3.00 | $2.00 – $3.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Thermoplastic solid traffic stripe, 24 in, white | linear foot | 2 | — | $6.00 | $6.00 – $6.50 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Hp Flex Post Delineator Tp 2B, 42 In White | each | 2 | — | $100.00 | $75.00 – $100.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Reconstruct catch basin, group 1 | each | 2 | — | $2,800 | $2,800 – $3,500 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Storm Drain Pipe, 18 In, Class Iii | linear foot | 2 | — | $72.00 | $70.00 – $72.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Barrier Fence (Orange), 4 Ft | linear foot | 2 | — | $2.00 | $2.00 – $4.50 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Changeable Message Sign, Portable, Type 3 | each | 2 | — | $3,000 | $3,000 – $4,300 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Concrete curb & gutter, 8 in x 30 in, tp 2 | linear foot | 2 | — | $23.00 | $23.00 – $32.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Concrete valley gutter, 8 in | square yard | 2 | — | $62.00 | $62.00 – $80.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Concrete Median, 7 1/2 In | square yard | 2 | — | $62.00 | $62.00 – $110.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Concrete sidewalk, 8 in | square yard | 2 | — | $62.00 | $62.00 – $80.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Concrete sidewalk, 4 in | square yard | 2 | — | $41.00 | $41.00 – $49.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Tack Coat | gl | 2 | — | $5.05 | $5.00 – $5.05 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Gr aggregate base course, incl material | ton | 2 | — | $34.00 | $34.00 – $42.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Thermoplastic traffic stripe, yellow | square yard | 2 | — | $6.00 | $6.00 – $7.50 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Thermoplastic pavement marking, arrow, tp 2 | each | 2 | — | $100.00 | $100.00 – $130.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Galvanized steel post, tp 7 | linear foot | 2 | — | $15.00 | $13.00 – $15.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Highway sign, tp 1 material, reflective sheeting, tp 11 | square foot | 2 | — | $25.00 | $23.00 – $25.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Drop Inlet, Gp 1 | each | 2 | — | $5,250 | $4,600 – $5,250 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Catch basin, gp 1, addl deep | linear foot | 2 | — | $250.00 | $250.00 – $350.00 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Catch Basin, Gp 1 | each | 2 | — | $5,500 | $5,200 – $5,500 | Aug 11, 2026, Open bid tab, BL098-26 ↗ |
| Temporary Barrier, Method No. 2 | linear foot | 1 | — | $65.00 | $65.00 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Project Record Document (Dmv) | ls | 1 | — | $6,000 | $6,000 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| 10 In Insertion Valve | each | 1 | — | $26,000 | $26,000 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Butterfly Valve, 16 In Diameter | each | 1 | — | $9,500 | $9,500 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| 10 In Tapping Sleeve And Valve | each | 1 | — | $10,500 | $10,500 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Ductile Iron Pipe - 12 In Diameter | linear foot | 1 | — | $216.00 | $216.00 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Ductile Iron Pipe - 10 In Diameter | linear foot | 1 | — | $120.00 | $120.00 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Adjust Valve BOX TO Grade | each | 1 | — | $1,400 | $1,400 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| 3/4 In - 1 In Long Side Service Connections | each | 1 | — | $3,400 | $3,400 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| 8 In Insertion Vavle | each | 1 | — | $16,000 | $16,000 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Gate VALVE-8 IN | each | 1 | — | $3,500 | $3,500 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Adjust Existing Fire Hydrant To Grade | vf | 1 | — | $1,800 | $1,800 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Ductile Iron Pipe - 8 In Diameter | linear foot | 1 | — | $103.00 | $103.00 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Adjust Water Vault Top To Grade - 1 Vertical Ft Or Less, Non-Pavement | each | 1 | — | $7,000 | $7,000 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Field Switch, Type E-Cb-1Ru | each | 1 | — | $10,000 | $10,000 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Video Detection System, No. 1, Type A | ls | 1 | — | $32,000 | $32,000 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |
| Cctv Mounting Arm, Type 1 | each | 1 | — | $560.00 | $560.00 | Aug 11, 2026, Open bid tab, BL105-26 ↗ |