| 20A Excavation to Determine Service Material in Asphalt/Concrete Areas | each | 5 | $421.00 | $420.00 | $339.40 – $540.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 19A Vacuum Excavation to Determine Service Material in Lawn Area | each | 5 | $390.00 | $390.00 | $337.68 – $500.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 16A Contingency Allowance | ls | 5 | $300,000 | $300,000 | $50,000 – $350,000 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11b4 furnish and install asphalt pavement - binder course (2.5 inch deep) | square yard | 5 | $23.90 | $22.00 | $22.00 – $81.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11b3 furnish and install asphalt pavement - top course (1.5 inch deep) | square yard | 5 | $21.00 | $18.00 | $18.00 – $81.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11B2 Furnish and Install Asphalt Driveway/Parking Lot | square yard | 5 | $57.63 | $36.00 | $36.00 – $95.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11A2 Furnish and Install Concrete Driveway | square yard | 5 | $120.00 | $85.00 | $85.00 – $195.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11A1 Furnish and Install Concrete Sidewalk | square yard | 5 | $120.00 | $75.00 | $75.00 – $235.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11b5 furnish and install asphalt pavement - base course (4 inch deep) | square yard | 4 | — | $29.00 | $29.00 – $110.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 21A New Penetration of Foundation Wall or Floor | each | 3 | — | $700.00 | $500.00 – $700.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 14A Repair Crew Labor and Equipment | hour | 3 | — | $290.00 | $290.00 – $528.40 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11C1 Landscape Restoration | square yard | 3 | — | $23.00 | $20.00 – $24.88 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 11b6 cold milling and placement of asphalt pavement (1.5 inch deep) | square yard | 3 | — | $19.00 | $17.18 – $19.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8B4 Furnish and Install 1 1/2-inch and Larger Copper Tubing (Private Side) | linear foot | 3 | — | $13.00 | $11.00 – $27.26 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8B3 Furnish and Install 3/4-inch to 1-inch Copper Tubing (Private Side) | linear foot | 3 | — | $12.00 | $8.40 – $12.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8B2 Furnish and Install 1 1/2-inch and Larger Copper Tubing (Public Side) | linear foot | 3 | — | $13.00 | $11.00 – $27.26 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8B1 Furnish and Install 3/4-inch to 1-inch Copper Tubing (Public Side) | linear foot | 3 | — | $12.00 | $8.40 – $12.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8a4 service replace/install 1 1/2-inch and larger (private side) | each | 3 | — | $3,900 | $3,900 – $7,572 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8a3 service replace/install 3/4-inch to 1-inch (private side) | each | 3 | — | $3,600 | $3,600 – $6,355 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8a2 service replace/install 1 1/2-inch and larger (public side) | each | 3 | — | $3,700 | $3,000 – $6,724 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 8a1 service replace/install 3/4-inch to 1-inch (public side) | each | 3 | — | $3,500 | $3,457 – $3,575 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 6A Furnish and Install Select Backfill | cubic yard | 3 | — | $49.00 | $49.00 – $70.00 | Feb 10, 2026, Open bid tab, contract 2026-02-10_bid_tabulation ↗ |
| 5a asphalt seal | square yard | 2 | — | $4.00 | $0.5 – $4.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 4A-2 Material Allowance | ls | 2 | — | $25,000 | $25,000 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 4A-1 Crew and Equipment | hour | 2 | — | $600.00 | $100.00 – $600.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3i for fibers for concrete reinforced | cubic yard | 2 | — | $10.00 | $5.50 – $10.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3h inductance loop install | linear foot | 2 | — | $33.00 | $33.00 – $40.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3G Crushed Stone | cubic yard | 2 | — | $70.00 | $36.00 – $70.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3f reinforced deformed steel bars | pound | 2 | — | $2.00 | $0.25 – $2.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3E Welded Wire Fabric | square yard | 2 | — | $2.50 | $2.50 – $7.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3D Integral Curb | linear foot | 2 | — | $75.00 | $59.00 – $75.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3C Gutter Curb | cubic yard | 2 | — | $1,100 | $500.00 – $1,100 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3b sidewalk of 4 inch thick and driveway of 6 inch thick | cubic yard | 2 | — | $1,100 | $1,100 – $1,460 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 3a pavement of 8-inch thick | cubic yard | 2 | — | $900.00 | $100.00 – $900.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 2L Rough Dirt Fill | cubic yard | 2 | — | $30.00 | $9.00 – $30.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 2k additional spoil materials remove | cubic yard | 2 | — | $50.00 | $30.00 – $50.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 2j fertilizing existing tree | each | 2 | — | $170.00 | $22.00 – $170.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 2i replace evergreen shrub 2.5 feet to 4 feet tall(balled) | each | 2 | — | $475.00 | $45.00 – $475.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 2h replace deciduous shrub 3 feet - 4 feet tall (bare root) | each | 2 | — | $450.00 | $45.00 – $450.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |
| 2g repairing damaged tree, pruning, and wrapping | each | 2 | — | $175.00 | $25.00 – $175.00 | Feb 19, 2026, Open bid tab, contract 2026-02-19_bid_tabulation ↗ |